DSP GARDEN
By DSP INFRATEC BUILDER AND DEVELOPERS
RG-MH-54447 · RERA P52900017163 · Last updated on MahaRERA portal: 7 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DSP GARDEN is a Residential / Group Housing project by DSP INFRATEC BUILDER AND DEVELOPERS in Sindhudurg, Maharashtra, registered with MahaRERA as P52900017163 on 17 Jul 2018. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 0 of the 1 unit on this registration is recorded sold or booked, and 41 of 44 construction stages are filed complete.
At a glance
Project
- NameDSP GARDEN
- TypeResidential / Group Housing
- Location
- NEAR KANKAVLI COLLEGE
- JALKEWADI
- Kankavali
- Kankavli
- Sindhudurg
- 416602
- Pincode416602
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52900017163
- ReraGenie IDRG-MH-54447
Builder
- NameDSP INFRATEC BUILDER AND DEVELOPERS
- Entity typePartnership
- PartnersKISHOR SHAHU PANGAM, DILIP SHAHU PANGAM
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on17 Jul 2018
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings4 building records
- Documents filed27 files
Current status
Figures as on 7 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A WING A | NA | 6 | 6 | 0 | 0 | 0 |
| BUILDING A WING B | NA | 6 | 6 | 0 | 0 | 0 |
| BUILDING B WING A | NA | 6 | 6 | 1 | 0 | 1 |
| BUILDING C | NA | 6 | 6 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
41 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Basement (if any), at 0%.
BUILDING A WING A73%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING A WING B100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING B WING A100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
BUILDING C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| BUILDING A WING A | 1 | 6 | 7 |
| BUILDING A WING B | 1 | 6 | 7 |
| BUILDING B WING A | 1 | 6 | 7 |
| BUILDING C | 1 | 6 | 7 |
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DSP INFRATECH BUILDER AND DEVELOPER | Ambarnath(M Cl) | Thane |
| DATTATRAY KESHAV KASALKAR | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING C | NA | Rs 2.74 cr | Rs 2.74 cr |
| BUILDING B WING A | NA | Rs 2.03 cr | Rs 2.03 cr |
| BUILDING A WING A | NA | Rs 1.87 cr | Rs 1.87 cr |
| BUILDING A WING B | NA | Rs 1.87 cr | Rs 1.87 cr |
| - | NA | Rs 1.73 cr | Rs 1.73 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJAY S ANDHARI |
| Engineer | SP PARASTEKAR |
| Engineer | SANJAY ANDHARI |
| Chartered Accountant | J B VIRWANI AND ASSOCIATES |
| Chartered Accountant | NAVIN D KUKREJA |
| Partner | Role in project |
|---|---|
| DSP INFRATEC BUILDER AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jul 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 6 Jul 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jul 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed27
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: form 1 dsp.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: form 1 dsp.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: form 2 dsp.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: form 2 dsp.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: form 1 dsp.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: form 2 dsp.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3.pdf | 6 May 2026 |
| Form 1File: FORM 1 ENGINEER (2).pdf | 17 Jun 2025 |
| Form 2File: FORM 2 ARCHITICTE (1).pdf | 17 Jun 2025 |
| Form 3File: Form 3 - CA- DSP.pdf | 17 Jun 2025 |
| OthersFile: FORM 2A (2).pdf | 17 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Disclosure - Promoter Letterhead.pdf | 17 Jun 2025 |
| Building plan approvalFile: PROJECT PLAN.PDF | 6 Jul 2018 |
| Layout approvalFile: PROJECT PLAN.PDF | 6 Jul 2018 |
| PAN CardFile: DSP PAN.pdf | 6 Jul 2018 |
| Copy of the legal title reportFile: TITLE CERTIFICATE NEW.pdf | 6 Jul 2018 |
| Details of encumbrancesFile: Non encumbrance.pdf | 6 Jul 2018 |
| Copy of Layout Approval (in case of layout)File: PROJECT PLAN.PDF | 6 Jul 2018 |
| Building Plan Approval (IOD)File: PROJECT PLAN.PDF | 6 Jul 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT Compressed.pdf | 6 Jul 2018 |
| Declaration in FORM BFile: FORM B.pdf | 6 Jul 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf | 6 Jul 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 6 Jul 2018 |
| Certificates of CA (Form 3)File: Form 3 compressed.pdf | 6 Jul 2018 |
| Proforma of Allotment letterFile: Rera sathekarar Final Draft.pdf | 6 Jul 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sindhudurg
Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 27 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DSP GARDEN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near JALKEWADI530+ in Sindhudurg
Filed coordinates, straight-line distance. 44 registered projects within 2 km.
KANAK PARADISE
TRIVENI BUILDERS AND DEVELOPERS
MAITRI GARDEN
MAITRI DEVELOPERS
SINDHU PRATAP COMPLEX
AMEY HOMES
RADHA-KRUSHNA NAGARI
MAYURESH DEVELOPERS
Adinath Residency
DS Ventures
Shiv-Shankar Plaza
Chintamani Dasharath Kalyankar
See every Sindhudurg project, with the district possession charts
Builder: DSP INFRATEC BUILDER AND DEVELOPERS
DSP INFRATEC BUILDER AND DEVELOPERS has 1 registration on MahaRERA, including DSP GARDEN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.
Frequently asked questions
What does it mean that DSP GARDEN shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if DSP GARDEN is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DSP GARDEN?
The registered promoter entity is DSP INFRATEC BUILDER AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DSP GARDEN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DSP GARDEN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DSP GARDEN?
The professionals named in the filing: Architect: SANJAY S ANDHARI; Engineer: SP PARASTEKAR; Engineer: SANJAY ANDHARI; Chartered Accountant: J B VIRWANI AND ASSOCIATES; Chartered Accountant: NAVIN D KUKREJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DSP GARDEN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback