Home / Browse projects / DREAM RESIDENCY

Registered No litigation declared Residential / Group Housing project

DREAM RESIDENCY

By CINE PROPERTIES & FINANCE PVT LTD.

RG-MH-63703 · RERA P51900051499 · Last updated on MahaRERA portal: 23 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: .
Dec 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 77%
42 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

DREAM RESIDENCY is a Residential / Group Housing project by CINE PROPERTIES & FINANCE PVT LTD. in GIRGAUM MUMBAI, 400004, registered with MahaRERA as P51900051499 on 23 Jun 2023. Possession is promised by 31 Dec 2028. 0 of the 42 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameDREAM RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • TRIBHUVAN ROAD
    • GIRGAUM MUMBAI
    • 400004
  • Pincode400004
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900051499
  • ReraGenie IDRG-MH-63703

Builder

  • NameCINE PROPERTIES & FINANCE PVT LTD.
  • Entity typeCompany
  • DirectorsMOHD ASLAM JUSAB SOPARIWALA, IBRAHIM JUSAB SOPARIWALA, MOHAMMED YUNUS JUSAB SOPARIWALA

Key dates

this monthRegisteredJun 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Current status

0%0 of 42 units booked
33.4%Work done, per cost certificate

Figures as on 23 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DREAM RESIDENCYNA232142042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 77%.

DREAM RESIDENCY: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises35%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 23 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes55%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes55%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered90

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,428 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI7667.67
Proposed, not sanctioned4,048 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR SHOP NO 2 2ABHAVESHWAR BUILDING 148-B DR ANNIE BASANT ROAD WORLI MUMBAI 400016
Estimated costRs 78.00 cr
Cost incurredRs 26.05 cr
Work done33.4%
BuildingWingEstimatedIncurred
DREAM RESIDENCYNARs 74.00 crRs 26.05 cr
-NARs 4.00 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJPURKAR AND A2 ANSARI ASSOCIATES OF ANSARI MOHD SHAKIR
EngineerZZ CONSULTANTS
EngineerNaveen Singh
Chartered AccountantGOPAL HEDA & ASSOCIATES
Chartered AccountantMOHAN L GUPTA & ASSOCIATES
Chartered AccountantRAHUL R SINGH & ASSOCIATES
PartnerRole in project
CINE PROPERTIES & FINANCE PVT LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 2A Mar2026.pdf23 Jul 2026
Withdrawal Update Form 1File: A2 ASSOCIATES CERTIFICATE.pdf22 Jul 2026
Withdrawal Update Form 2File: Eng Cer june26.pdf22 Jul 2026
Withdrawal Update Form 3File: CA CERTIFICATE JUNE 2026.pdf22 Jul 2026
Withdrawal Update Form 1File: Architect Certificate 30122025.pdf23 May 2026
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE MARCH 2026.pdf23 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 cine dec25 (1).pdf23 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 (5)cine Mar2026.pdf23 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 (1)cine dec25 (1).pdf23 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 (1)cine mar26 (1).pdf23 May 2026
Withdrawal Update Form 1File: Architect Certificate 30-06-2025 -.pdf31 Dec 2025
Withdrawal Update Form 1File: Architect Certificate 30092025.pdf31 Dec 2025
Withdrawal Update Form 2File: Eng cert june2025.pdf31 Dec 2025
Withdrawal Update Form 2File: Eng cert sep2025.pdf31 Dec 2025
Withdrawal Update Form 3File: CA CERT JUNE25.pdf31 Dec 2025
Withdrawal Update Form 3File: CA CERT SEP 25.pdf31 Dec 2025
Withdrawal Update Form 1File: Architect Certificate 31-03-2025.pdf25 Dec 2025
Withdrawal Update Form 2File: eng mar25.pdf25 Dec 2025
Withdrawal Update Form 3File: Q4 CINE PROPERTIES mar 25.pdf25 Dec 2025
Form 1File: Architect Certificate 30-09-2024.pdf13 Oct 2025
Form 2File: ENG CERT_SEP24.pdf13 Oct 2025
Form 3File: CA CERT_SEP24.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: disc sold_- Copy.pdf13 Oct 2025
Form 1File: Architect Certificate 30-06-2025 -.pdf13 Oct 2025
Form 2File: ENG CERT_JUNE24.pdf13 Oct 2025
Form 3File: CA CERT_JUNE24.pdf13 Oct 2025
Disclosure of Sold and Booked InventoryFile: disc sold_- Copy.pdf13 Oct 2025
Form 2A (FY 2023-2024)File: FORM 2A_23_24.pdf13 Oct 2025
Form 5 (FY 2023-2024)File: Form 5_23-24.pdf13 Oct 2025
Commencement certificateFile: 2471645_FurtherCC_signed.pdf21 Jul 2025
Form 1File: Architect Certificate 31-03-2025.pdf18 Jul 2025
Form 2File: eng mar25.pdf18 Jul 2025
Form 3File: Q4 CINE PROPERTIES mar 25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: disc sold_mar25.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: Qpr mar25.pdf18 Jul 2025
Form 1File: Architect Certificate 31-12-2024-2.pdf11 Jul 2025
Form 2File: eng dec24.pdf11 Jul 2025
Form 3File: Q3 CINE PROPERTIES.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: Qpr let.pdf11 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng dec24.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng mar25_compressed.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31-12-2024-2.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 31-03-2025.pdf9 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT_CINE SEP24.pdf4 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5_CINE_23-24.pdf4 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 30-09-2024.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT_MAR24_compressed.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT_JUNE24_compressed.pdf30 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT_SEP24_compressed.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT_JUNE24.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT_SEP24.pdf30 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT_SEP23.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT_DEC23.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT_MAR24.pdf27 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_23_24.pdf27 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert_3062024.pdf11 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert_3032024.pdf11 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_SEP 2023.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_DEC2023.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 20-01-2024.pdf30 Mar 2024
Disclosure of sold/ booked inventoryFile: Decl_Sold Book_Inventory.pdf28 Feb 2024
Building plan approvalFile: 2388515Amendletter_signed.pdf30 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 2388515Amendletter_signed.pdf30 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: 2398910_FurtherCC_signed.pdf30 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (1).pdf24 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate .pdf9 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest_cine.pdf3 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SEPERATE BANK ACCOUNT DEC.pdf26 Apr 2023
Copy of the legal title reportFile: TITILE.pdf21 Apr 2023
Proforma of Agreement for saleFile: Agreement FORMAT RERA (2).pdf21 Apr 2023
Proforma of Allotment letterFile: MAHARASHTRA REAL ESTATE REGULATORY AUTHORITY (1).pdf21 Apr 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance_Finance.pdf15 Apr 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE_LEGAL.pdf15 Apr 2023
Details of encumbrances concerned to LegalFile: No Encumbrance_Finance.pdf15 Apr 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE_LEGAL.pdf15 Apr 2023
Deviation Report with respect to Allotment letterFile: NO DEVIATION ALLOTMENT_.pdf15 Apr 2023
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION AGREEMENT.pdf15 Apr 2023
Layout approvalFile: Amended-mar 2023.pdf10 Mar 2023
Building plan approvalFile: Amended-mar 2023.pdf10 Mar 2023
PAN CardFile: PAN CARD_CINE PROP.pdf10 Mar 2023

Keep DREAM RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GIRGAUM MUMBAI

2 kmDREAM RESIDENCYCompleted 13Lapsed / revoked 24Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 70 registered projects within 2 km.

Builder: CINE PROPERTIES & FINANCE PVT LTD.

CINE PROPERTIES & FINANCE PVT LTD. has 1 registration on MahaRERA, including DREAM RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if DREAM RESIDENCY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DREAM RESIDENCY?

The registered promoter entity is CINE PROPERTIES & FINANCE PVT LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DREAM RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DREAM RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DREAM RESIDENCY?

The professionals named in the filing: Architect: RAJPURKAR AND A2 ANSARI ASSOCIATES OF ANSARI MOHD SHAKIR; Engineer: ZZ CONSULTANTS; Engineer: Naveen Singh; Chartered Accountant: GOPAL HEDA & ASSOCIATES; Chartered Accountant: MOHAN L GUPTA & ASSOCIATES; Chartered Accountant: RAHUL R SINGH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DREAM RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DREAM RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DREAM RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.