DREAM CITY
RG-MH-13169 · RERA P52100022423 · Last updated on MahaRERA portal: 29 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DREAM CITY is a Residential / Group Housing project by R S DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100022423 on 20 Sep 2019. Possession was promised by 30 Dec 2025 and is now 10 months past that date. The completion date has moved by 12 months from the original filing. 31 of the 36 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameDREAM CITY
- TypeResidential / Group Housing
- Location
- BHIM NAGAR
- PIMPARI CHINCHWAD LINK ROAD
- CTS NO. 932
- CHINCHWADGAON
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 411033
- Pincode411033
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100022423
- ReraGenie IDRG-MH-13169
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on20 Sep 2019
- Promised completion30 Dec 2025
- Revised completionRevised to 30 Dec 2025 (originally 30 Dec 2024)
- Buildings1 building record
- Documents filed57 files
Current status
Figures as on 29 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PHASE-1, B WING | NA | 9 | 6 | 36 | 0 | 36 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
PHASE-1, B WING: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | Yes | 95% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PRECISION ARCHITECT |
| Engineer | AADHAR ENGINEERS |
| Chartered Accountant | SWATI PATEL |
| Chartered Accountant | BHAVIK JAYNITILAL PATEL |
| Partner | Role in project |
|---|---|
| R S DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWith reference to the above mentioned subject, we respectfully request for an extension of till 30.12.2025 to complete our registered project with MahaRERA bearing Registration No. P52100022423. Considering the circumstances outlined below, we appeal to your esteemed authority to grant us an extension to complete the entire project and obtain the Occupation Certificate till 30.12.2025. The project has been completed as per the sanctioned plans, and we submitted the application for the Occupation Certificate to the Pimpri Chinchwad Mahanagarpalika, Pune, on 26-12-2024. However, the process for
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Aug 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Aug 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Aug 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Aug 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed57
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Q1.pdf | 29 Jun 2026 |
| Form 2File: Form 2 Q1.pdf | 29 Jun 2026 |
| Form 3File: Form 3 Q1.pdf | 29 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q1.pdf | 29 Jun 2026 |
| Form 1File: Form 1 Q2.pdf | 29 Jun 2026 |
| Form 2File: Form 2 Q2.pdf | 29 Jun 2026 |
| Form 3File: Form 3 Q2.pdf | 29 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD Q2.pdf | 29 Jun 2026 |
| Form 1File: Form 1 Q3.pdf | 29 Jun 2026 |
| Form 2File: Form 2 Q3.pdf | 29 Jun 2026 |
| Form 3File: Form 3 Q3.pdf | 29 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: sold unsold Q3.pdf | 29 Jun 2026 |
| Form 5 (FY 2024-2025)File: Uploded Form-5.pdf | 3 Nov 2025 |
| Disclosure of sold/ booked inventoryFile: SOLDUNSOLD INVENTORY311224.pdf | 6 Feb 2025 |
| Declaration in FORM BFile: rsd form b.pdf | 5 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf | 5 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_compressed.pdf | 5 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2.pdf | 5 Feb 2025 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate form-d.pdf | 5 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 1QSOLDUNSOLD_300624.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: AQ2_SOLD UNSOLD 300924.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 1QSOLDUNSOLD_300624.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: AQ4_SOLD UNSOLD 310324.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: AQ3_SOLD UNSOLD 311223.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: AQ2_SOLD UNSOLD 300923.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: AQ1_SOLD UNSOLD 300623.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: AQ2_SOLD UNSOLD 300924.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Q4SOLDUNSOLD310323.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Q3SOLDUNSOLD311222.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Q2SOLDUNSOLD300922.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Q1SOLDUNSOLD300622.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 4SOLDUNSOLD310322.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 3SOLDUNSOLD311221.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 2SOLD UNSOLD300921.pdf | 28 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: 1SOLDUNSOLD300621.pdf | 28 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 202122.pdf | 28 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 2223.pdf | 28 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 202324.pdf | 28 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: rsd.pdf | 11 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: rsd.pdf | 11 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: R S DEVELOPERS_22423.pdf | 5 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RSDEVELOPERS_2122.pdf | 22 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 3 R S D Pro-Drem City F-5.pdf | 13 Apr 2022 |
| OtherFile: B wing Work progress Certificate.pdf | 1 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Pune_R S Developers_compressed.pdf | 30 Mar 2021 |
| Proforma of Allotment letterFile: Final Agreement-Draft_-_08-03-21.pdf | 8 Mar 2021 |
| Layout approvalFile: CCPLAN1_487.pdf | 30 Aug 2019 |
| Building plan approvalFile: Agreement_-_Draft.pdf | 30 Aug 2019 |
| PAN CardFile: PAN CARD RS PDF.pdf | 30 Aug 2019 |
| Copy of the legal title reportFile: TSR.pdf | 30 Aug 2019 |
| Details of encumbrancesFile: RSD_ENCRUMBANSIS.pdf | 30 Aug 2019 |
| Copy of Layout Approval (in case of layout)File: CCPLAN1_487.pdf | 30 Aug 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Agreement_-_Draft.pdf | 30 Aug 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC001.pdf | 30 Aug 2019 |
| Declaration in FORM BFile: FORM-B.pdf | 30 Aug 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3.pdf | 30 Aug 2019 |
| Proforma of Allotment letterFile: Agreement_-_Draft.pdf | 30 Aug 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 57 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DREAM CITY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near CTS NO. 932, CHINCHWADGAON13,700+ in Pune
Filed coordinates, straight-line distance. 133 registered projects within 2 km.
Construction of 24 LIG, 768 MIG and commercial
Pune Housing & Area Development Board
Kohinoor Avantara
Intofinity Promoters Private Limited
AISHWARYAM INSIGNIA
VIKSAK VINODE INFRATECH LLP
KOHINOOR UPTOWN AVENUE
MOONSTONE REALINFRA PRIVATE LIMITED
LUSH RESIDENCES
LUSH RESIDENCES LLP
RENUKA PANCHATATTVA
Renuka Realty Private Limited
Builder: R S DEVELOPERS
R S DEVELOPERS has 4 registrations on MahaRERA, including Royal Castle and DREAM CITY. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that DREAM CITY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if DREAM CITY is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DREAM CITY?
The registered promoter entity is R S DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DREAM CITY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DREAM CITY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DREAM CITY?
The professionals named in the filing: Architect: PRECISION ARCHITECT; Engineer: AADHAR ENGINEERS; Chartered Accountant: SWATI PATEL; Chartered Accountant: BHAVIK JAYNITILAL PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DREAM CITY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback