Home / Browse projects / Thane, Maharashtra / DOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD

Registered No litigation declared Commercial project

DOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD

By DOSTI ENTERPRISES

RG-MH-74784 · RERA P51700015501 · Last updated on MahaRERA portal: 23 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 14 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 95%
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

DOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD is a Commercial project by DOSTI ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700015501 on 1 Mar 2018. Possession is promised by 30 Dec 2026.

At a glance

Project

  • NameDOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD
  • TypeCommercial
  • Location
    • BALKUM
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700015501
  • ReraGenie IDRG-MH-74784

Builder

  • NameDOSTI ENTERPRISES
  • Entity typeOthers
  • GSTIN27AAFFD4236J1ZF
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Named personsDOSTI REALTY LIMITED, SURAKSHA REALTY LIMITED, MACKINON ENTERPRISES PVT LTD
  • Other registrations14 more →
  • Completed2 of 15
  • Declared earlier projects16 →

Key dates

this monthRegisteredMar 2018PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Mar 2018
  • Promised completion30 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed52 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DOSTI WESTWOODNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

DOSTI WESTWOOD: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities35

As on 23 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes2%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
SQUASH COURT AND BADMINTON COURTYes75%
2 BOX CRICKETYes50%
AMPHITHEATREYes60%
CAFETERIA WITH OUTDOOR DINNINGYes90%
CHILDREN ADVENTURE POOL WITH WATER SLIDEYes85%
CLUB HOUSEYes85%
TODDLERS ROOM CRECHEYes0%
STROLLING PATHYes75%
CYCLING TRACKYes75%
POOL SNOOKER CARROM CHESS TABLE TENNIS ROOMYes90%
POOL PAVILION DECK AREAYes80%
OLYMPIC SIZE SWIMMING POOLYes90%
MULTIPURPOSE SPORTS COURTYes0%
MULTIPURPOSE LAWN RESTING PLAZASYes85%
MERLION ZONEYes0%
LIBRARYYes75%
LAWN TENNISYes50%
KIDS PLAY AREASYes90%
GYMNASIUM WITH ATTACHED CHANGING ROOM SHOWER LOCKER ROOMYes90%
FUTSAL COURTYes85%

Parking filed50

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots50
Closed/Covered50

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,550 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI1991.84
Proposed, not sanctioned1,992 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOTAK MAHINDRA BANK LIMITED, GROUND AND MEZZANINE FLOOR, BOTAWALA CHAMBERS,2, P M ROAD, FORT, MUMBAI

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHETPYE CONSULTANTS I PVT LTD THANE
ArchitectTEN FOLDS ARCHITECTS AND CONSULTANTS
ArchitectArchitect Jay Vora
EngineerJW CONSULTANT LLP
EngineerMr.Anant Kerkar
Chartered AccountantManish Bardia & Co.
Chartered AccountantBagade & Associates (Chartered Accountants
PartnerRole in project
DOSTI ENTERPRISES-

Litigation declared2

CaseCourtStatus
7949/2015BOMBAY HIGH COURTPRE ADMISSION
4428/2016CHIEF METROPOLIAN MAGISTRATE ESPLANADE COURTS MUMBAINOT HEARD CASES FILING REPLY

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Feb 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Feb 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Dec 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 10 Apr 2024

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate - DWC Phase-3, Westwood.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DWC Dosti Westwood.pdf7 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DWC Dosti Westwood.pdf7 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Westwood Fitness Centre OC Certificate.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificate -DWC -Westwood - Phase 3-Dec 23.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DWC Dosti Westwood Phase 3.pdf17 Jan 2024
Certificates of CA (Form 3)File: CA Certificate Dosti West County Phase 3 West Wood.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DWC Phase 3 Westwood June-23.pdf26 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DWC Phase 3 Westwood- Sept-23.pdf26 Dec 2023
Certificates of CA (Form 3)File: CA Certificate DWC Phase 3 Westwood-June-23.pdf26 Dec 2023
Certificates of CA (Form 3)File: CA Certificate DWC Phase 3 Westwood-Sept-23.pdf26 Dec 2023
Certificates of CA (Form 5)File: CA Certificate DWC Phase 3 Westwood-June-23.pdf26 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Dosti West County Dosti WestWood.pdf11 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Dosti West County Phase 3 Dosti Westwood.pdf23 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A FORM 1 Dosti WestWood.pdf17 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DOSTI WESTWOOD RERA Architect CERTIFICATE Form 1.pdf9 May 2023
Certificates of CA (Form 3)File: CA certificate Form 3 Westwood March 2023_compressed.pdf1 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate Dosti West County Phase 3 Dosti West Wood.pdf20 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 DWC Ph3 Dosti Westwood.pdf11 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Dosti Westwood Dec 2022.pdf15 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dosti westwood Dec 2021.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert Dosti Westwood signed March 2020.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 certificate Dosti Westwood.pdf2 Feb 2023
Certificates of CA (Form 3)File: dosti westwood March 2018.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate-West Wood.pdf28 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Dosti Westwood.pdf23 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Westwood Architect certificate.pdf19 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Westwood Arch Certificate 31-3-2022_compressed.pdf7 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Dosti Westwood.pdf7 Jan 2022
Certificates of CA (Form 3)File: Form No 3 CA Certificate Sept 2021 Dosti Westwood_compressed.pdf20 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: WESTWOOD.pdf14 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Westwood RERA certificate.pdf12 Oct 2021
Details of encumbrancesFile: DE INDEX II LOANS.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Westwood.pdf4 Mar 2021
Certificates of CA (Form 3)File: CA Certificate Westwood.pdf27 May 2020
Commencement Certificates / NA Order for plotted developmentFile: iod-compressed.pdf23 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5-1- Westwood.pdf3 Dec 2019
Certificates of CA (Form 5)File: Dosti West County Phase 3 Dosti Westwood CA.pdf13 Nov 2018
Details of encumbrancesFile: 180814031931_0001.pdf14 Aug 2018
Building plan approvalFile: iod-compressed.pdf16 Feb 2018
Layout approvalFile: Dosti West County layout.pdf16 Feb 2018
Copy of Layout Approval (in case of layout)File: Dosti West County layout.pdf16 Feb 2018
Building Plan Approval (IOD)File: iod-compressed.pdf16 Feb 2018
Declaration in FORM BFile: affidavit cum declaration 14022018.pdf16 Feb 2018
Certificates of CA (Form 3)File: CA Certificate - DOSTI WESTWOOD compressed.pdf16 Feb 2018
Proforma of Allotment letterFile: maharashtra real estatre regulatory 14022018.pdf16 Feb 2018
OtherFile: dosti enterprises 14022018.pdf16 Feb 2018
Copy of the legal title reportFile: 49-6.pdf14 Feb 2018
Copy of the legal title reportFile: 49-8A.pdf14 Feb 2018
Copy of the legal title reportFile: 50-3A.pdf14 Feb 2018
Copy of the legal title reportFile: 497A.pdf14 Feb 2018
Details of encumbrancesFile: encumbrance.pdf14 Feb 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
DOSTI WEST COUNTY - PHASE 2 - DOSTI CEDARBalkum Thane316CompletedDec 2023Feb 2023
DOSTI WEST COUNTY - DOSTI OAKBalkum Thane688CompletedJun 2022Sep 2021

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BALKUM7,600+ in Thane

2 kmDOSTI WESTCOUNTY-PHASE 3Completed 139Lapsed / revoked 57Other 103Dot size: filed unitsN

Filed coordinates, straight-line distance. 299 registered projects within 2 km.

Builder: DOSTI ENTERPRISES

DOSTI ENTERPRISES has 15 registrations on MahaRERA, including DOSTI WEST COUNTY - DOSTI OAK and DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR. Its filings disclose 16 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD?

The registered promoter entity is DOSTI ENTERPRISES, an others as per the filing. Its GSTIN 27AAFFD4236J1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD?

The professionals named in the filing: Architect: ARCHETPYE CONSULTANTS I PVT LTD THANE; Architect: TEN FOLDS ARCHITECTS AND CONSULTANTS; Architect: Architect Jay Vora; Engineer: JW CONSULTANT LLP; Engineer: Mr.Anant Kerkar; Chartered Accountant: Manish Bardia & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DOSTI WESTCOUNTY-PHASE 3-DOSTI WESTWOOD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.