Home / Browse projects / Thane, Maharashtra / DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR

Completed No litigation declared Residential / Group Housing project

DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR

By DOSTI ENTERPRISES

RG-MH-63394 · RERA P51700015258 · Last updated on MahaRERA portal: 11 Dec 2023

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
3Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR is a Residential / Group Housing project by DOSTI ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700015258 on 12 Feb 2018. The registration is recorded completed; possession was promised by 30 Dec 2023. 3 complaints are on record with the regulator.

At a glance

Project

  • NameDOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR
  • TypeResidential / Group Housing
  • Location
    • BALKUM
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700015258
  • ReraGenie IDRG-MH-63394

Builder

  • NameDOSTI ENTERPRISES
  • Entity typeOthers
  • GSTIN27AAFFD4236J1ZF
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Named personsDOSTI REALTY LIMITED, SURAKSHA REALTY LIMITED, MACKINON ENTERPRISES PVT LTD
  • Other registrations14 more →
  • Completed2 of 15
  • Declared earlier projects16 →

Key dates

this monthRegisteredFeb 2018PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Feb 2018
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DOSTI CEDARNA320000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Dec 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

DOSTI CEDAR: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities33

As on 11 Dec 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingYes10%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes80%
TODDLERS ROOM CRECHEYes0%
TABLE TENNISYes0%
SWIMMING POOLYes0%
STROLLING PATHYes0%
SQUASH COURTYes0%
POOL SNOOKER ROOMYes0%
POOL PAVILION DECK AREAYes0%
LOCKERS AND SHOWER AREA FOR GYMNASIUMYes0%
LIBRARYYes0%
KIDS PLAY AREAYes0%
BADMINTON COURTYes0%
CAFETERIA WITH OUTDOOR DININGYes0%
CARROM AND CHESS ROOMYes0%
CHILDREN ADVENTURE POOL WITH WATER SLIDEYes0%
CLUB HOUSEYes30%
CYCLING TRACKYes0%
FUTSAL COURTYes0%
GYMNASIUM WITH ATTACHED CHANGING ROOMSYes0%

Parking filed471

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots471
Closed/Covered428
Open Space43

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area18,413 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI28236.42
Proposed, not sanctioned23,583 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKOTAK MAHINDRA BANK LIMITED GROUND AND MEZZANINE FLOOR BOTAWALA CHAMBERS 2 P M ROAD FORT MUMBAI 4000

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
DOSTI ENTERPRISES-

Litigation declared15

CaseCourtStatus
2717/31/Pra-Kra/10/J-4/2016REVENUE MINISTERDispossed off
60/2017NAIB TASILDAR THANECLOSED FOR ORDER
35/2017CIVIL JUDGE SENIOR DIVISION THANEFOR WRITTEN STATEMENT OF DEFENDANTS
389/2017CIVIL JUDGE SENIOR DIVISION THANEFOR WRITTEN STATEMENT OF DEFENDANTS
8/2016CIVIL JUDGE SENIOR DIVISION THANEFOR ARGUMENTS ON APPLICATION UNDER SEC EIGHT OF ARBITRATION AND CONCILIATION ACT AND SUMMONS REPORT
403/2015CIVIL JUDGE SENIOR DIVISION THANEDISMISSED
16/2013CIVIL JUDGE SENIOR DIVISION THANEFOR FILLING OF SAY BY PLAINTIFF T O THE APPLICATION OF DEFENDANT
586/2011CIVIL JUDGE SENIOR DIVISION THANEFOR FILING EVIDENCE OF PLAINTIFF
17137/2014HIGH COURT MUMBAIPRE ADMISSION NOT SERVED
25/2017TAHSILDAR THANECLOSE FOR ORDERS
4428/2016CHIEF METROPOLIAN MAGISTRATE ESPLANADE COURTS MUMBAINOT HEARD CASES FILING REPLY
7949/2015HIGH COURT MUMBAIPRE ADMISSION
313/2018CIVIL JUDGE SENIOR DIVISION THANEFOR FILLING AMENDED WRITTEN STATEMENT
110/2018Sub Divisional OfficerAPPEAL REJECTED ON GROUND OF DELAY DISPOSED OFF
26/2019TAHSILDARDISPOSED OFF

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000078532Rohit Pandit and Kirti Rohit PanditDosti Enterprises18/03/2019
CC006000000193230Ashwani Kumar KoulDosti Enterprises/Deepak Goradia28/05/2020
CC006000000428955Tejas NikharDEEPAK GORADIA25/01/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Feb 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 May 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jan 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 3 Mar 2023

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Dosti west County Dosti Cedar Phase 2.pdf11 Dec 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Dosti Cedar.pdf3 Mar 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form -4_Page1.pdf3 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Certificates DOSTI CEDAR DT 30032019.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2020 05 15 Architects Certificate Dosti Cedar signed March 2020.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20210331 Dosti Oak Rera Arch Certificate.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 20210331 Dosti Cedar Rera Arch Certificate.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Cedar work completed certificate Dec 2022.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dosti Cedar Dec 2021.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate Cedar March 2019.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EnggCert Dosti Cedar signed March 2020.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 certificate Dosti Cedar.pdf2 Feb 2023
Certificates of CA (Form 3)File: DOSTI CEDAR CA CERTIFICATE.pdf2 Feb 2023
Certificates of CA (Form 3)File: CA Certitifcate March 2020 Dosti Cedar.pdf2 Feb 2023
Certificates of CA (Form 3)File: Form 3 Cedar signed march 2021.pdf2 Feb 2023
Disclosure of sold/ booked inventoryFile: Dosti Cedar.pdf30 Jan 2023
Certificates of CA (Form 3)File: CA Certificate Dosti Cedar.pdf25 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Certificate Phase 2 Dosti Cedar.pdf28 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Dosti Cedar.pdf23 Nov 2022
Certificates of CA (Form 3)File: CA Certificate Phase 2 Cedar.pdf23 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Cedar Architect certificate.pdf19 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Cedar Engineer Certificate.pdf29 Jul 2022
Certificates of CA (Form 3)File: CA Certificate.pdf29 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Cedar - DWC.pdf11 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Cedar Arch Certificate 31-3-2022_compressed.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate Cedar.pdf3 Mar 2022
Certificates of CA (Form 3)File: Form 3 CA Certificate Dosti Cedar.pdf3 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Dosti Cedar.pdf7 Jan 2022
Certificates of CA (Form 3)File: Form No 3 CA Certificate Sept 2021 Dosti Cedar_compressed.pdf20 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CEDAR.pdf14 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dosti Cedar RERA Certificate.pdf12 Oct 2021
Details of encumbrancesFile: DE INDEX II LOANS.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: CEDAR.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: CEDAR A_compressed.pdf14 Jun 2021
Disclosure of sold/ booked inventoryFile: CEDAR B_compressed.pdf14 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Cedar.pdf4 Mar 2021
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf20 Jul 2020
Certificates of CA (Form 3)File: CA Certificate Cedar.pdf27 May 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 53- Cedar.pdf3 Dec 2019
Certificates of CA (Form 5)File: Dosti West County Phase 2 Dosti Cedar CA.pdf13 Nov 2018
Details of encumbrancesFile: 180814031931_0001.pdf14 Aug 2018
Layout approvalFile: sanctioned layout 21-04-20180.pdf7 May 2018
Copy of Layout Approval (in case of layout)File: sanctioned layout 21-04-20180.pdf7 May 2018
Commencement Certificates / NA Order for plotted developmentFile: Annexure D-1.pdf7 May 2018
Copy of the legal title reportFile: 16- 11A.pdf2 Feb 2018
Copy of the legal title reportFile: 17-3.pdf2 Feb 2018
Copy of the legal title reportFile: 17-5.pdf2 Feb 2018
Copy of the legal title reportFile: 17-6.pdf2 Feb 2018
Copy of the legal title reportFile: 17-10.pdf2 Feb 2018
Copy of the legal title reportFile: 17-11A.pdf2 Feb 2018
Copy of the legal title reportFile: 17-11B.pdf2 Feb 2018
Copy of the legal title reportFile: 17-11C.pdf2 Feb 2018
Copy of the legal title reportFile: 17-12.pdf2 Feb 2018
Copy of the legal title reportFile: 17-13.pdf2 Feb 2018
Copy of the legal title reportFile: 17-14.pdf2 Feb 2018
Copy of the legal title reportFile: 19-43.pdf2 Feb 2018
Copy of the legal title reportFile: 25-13A.pdf2 Feb 2018
Copy of the legal title reportFile: 49-1.pdf2 Feb 2018
Copy of the legal title reportFile: 49-6.pdf2 Feb 2018
Copy of the legal title reportFile: 49-8A.pdf2 Feb 2018
Copy of the legal title reportFile: 50-3A.pdf2 Feb 2018
Copy of the legal title reportFile: 51-3A.pdf2 Feb 2018
Copy of the legal title reportFile: 51-5A.pdf2 Feb 2018
Copy of the legal title reportFile: 497A.pdf2 Feb 2018
Copy of the legal title reportFile: 49-3.pdf2 Feb 2018
Copy of the legal title reportFile: 49-4.pdf2 Feb 2018
Layout approvalFile: layout plan.pdf1 Feb 2018
Copy of Layout Approval (in case of layout)File: layout plan.pdf1 Feb 2018
Declaration in FORM BFile: FROM B.pdf1 Feb 2018
Certificates of CA (Form 3)File: CA Certificate - CEDAR.pdf1 Feb 2018
Proforma of Allotment letterFile: MRERA.pdf1 Feb 2018
OtherFile: 180201063550_00011.pdf1 Feb 2018
Building plan approvalFile: Commecement Certificate.pdf29 Jan 2018
Details of encumbrancesFile: encumbrance.pdf29 Jan 2018
Building Plan Approval (IOD)File: Commecement Certificate.pdf29 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: Commecement Certificate.pdf29 Jan 2018

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
DOSTI WEST COUNTY - PHASE 2 - DOSTI CEDARBalkum Thane316CompletedDec 2023Feb 2023
DOSTI WEST COUNTY - DOSTI OAKBalkum Thane688CompletedJun 2022Sep 2021

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BALKUM7,600+ in Thane

2 kmDOSTI WESTCOUNTY- PHASE Completed 138Lapsed / revoked 57Other 104Dot size: filed unitsN

Filed coordinates, straight-line distance. 299 registered projects within 2 km.

Builder: DOSTI ENTERPRISES

DOSTI ENTERPRISES has 15 registrations on MahaRERA, including DOSTI WEST COUNTY - DOSTI OAK and DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR. Its filings disclose 16 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR?

The registered promoter entity is DOSTI ENTERPRISES, an others as per the filing. Its GSTIN 27AAFFD4236J1ZF can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DOSTI WESTCOUNTY- PHASE 2- DOSTI CEDAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.