DOODLE HOMES
RG-MH-35747 · RERA P52100049510 · Last updated on MahaRERA portal: 12 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 9 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DOODLE HOMES is a Residential / Group Housing project by DOODLE HOMES LLP in Pune, Maharashtra, registered with MahaRERA as P52100049510 on 15 Feb 2023. Possession is promised by 3 Dec 2026. The completion date has moved by 9 months from the original filing.
At a glance
Project
- NameDOODLE HOMES
- TypeResidential / Group Housing
- Location
- Indus Bungalow Society
- PUNE
- Sadapur
- Mawal
- 410401
- Pincode410401
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100049510
- ReraGenie IDRG-MH-35747
Builder
- NameDOODLE HOMES LLP
- Entity typePartnership
- PartnersMAAHI ASHISH KARANI, YASHODHAN ANAND SANDU, VAIBHAV VISHAL GUPTA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on15 Feb 2023
- Promised completion3 Dec 2026
- Revised completionRevised to 3 Dec 2026 (originally 30 Mar 2026)
- Buildings1 building record
- Documents filed116 files
Current status
Figures as on 12 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DOODLE HOMES | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.
DOODLE HOMES: 75% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 75% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 90% |
| Street Lighting | Yes | 60% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 75% |
| Solid Waste Management And Disposal | Yes | 75% |
| Water conservation /Rain water harvesting | Yes | 60% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 60% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed43
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DOODLE HOMES | NA | Rs 35.00 cr | Rs 19.00 cr |
| - | NA | Rs 3.00 cr | Rs 2.00 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kanhaiya Associates Architects |
| Architect | ABHISHEK PANSE |
| Engineer | Romit Varia |
| Engineer | ASSOCIATED STRUCTURAL ENGINEERS LLP |
| Engineer | PANKAJ RAVINDRANATH SAWANT |
| Chartered Accountant | DINESH J POKAR & CO |
| Chartered Accountant | GADA & BID |
| Partner | Role in project |
|---|---|
| DOODLE HOMES LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe Promoter respectfully submits that despite making all bona fide and diligent efforts to complete the project within the originally proposed timeline, certain circumstances beyond the reasonable control of the Promoter have resulted in delays in the progress and completion of the project. The project involves multiple stages of statutory compliances and coordination with several regulatory authorities, consultants, contractors, and other stakeholders. The process of obtaining necessary permissions, approvals, and compliances from the concerned governmental and municipal authorities has take
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Jan 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 3 Dec 2026
Documents filed116
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Doodle Form 1 March 26 Final.pdf | 12 Jun 2026 |
| Withdrawal Update Form 2File: DOODLE HOMES LLP Form 2 2025-26 Q4 RERA.pdf | 12 Jun 2026 |
| Withdrawal Update Form 3File: DOODLE HOMES LLP Form 3 2025-26 Q4 RERA Scan.pdf | 12 Jun 2026 |
| Form 2A (FY 2025-2026)File: form 2A 2025-26.pdf | 9 Mar 2026 |
| Form 2A (FY 2022-2023)File: FORM-2A 2022-2023 Final.pdf | 7 Mar 2026 |
| Form 2A (FY 2023-2024)File: FORM-2A 2023-2024 Final.pdf | 7 Mar 2026 |
| Form 2A (FY 2024-2025)File: FORM-2A 2024-2025 Final.pdf | 7 Mar 2026 |
| Form 5 (FY 2024-2025)File: DOODLE HOMES Form 5 2025 Scanned.pdf | 7 Mar 2026 |
| Withdrawal Update Form 1File: DOODLE HOMES LLP Form 1 2025-26 Q1 RERA.pdf | 6 Mar 2026 |
| Withdrawal Update Form 1File: Form 1- Architect Certificate.pdf | 6 Mar 2026 |
| Withdrawal Update Form 1File: Form-1 Q3 2025.pdf | 6 Mar 2026 |
| Withdrawal Update Form 2File: DOODLE HOMES LLP Form 2 2025-26 Q1 RERA.pdf | 6 Mar 2026 |
| Withdrawal Update Form 2File: DOODLE HOMES LLP Form 2 2025-26 Q2 RERA (2).pdf | 6 Mar 2026 |
| Withdrawal Update Form 2File: FORM-2 Q3.pdf | 6 Mar 2026 |
| Withdrawal Update Form 3File: DOODLE HOMES LLP Form 3 2025-26 Q1 RERA 101125 Scanned.pdf | 6 Mar 2026 |
| Withdrawal Update Form 3File: DOODLE HOMES LLP Form 3 2025-26 Q2 RERA 101225 Scanned (4)_compressed.pdf | 6 Mar 2026 |
| Withdrawal Update Form 3File: DOODLE HOMES LLP Form 3 2025-26 Q3 RERA 050226 Scanned.pdf | 6 Mar 2026 |
| Form 5 (FY 2022-2023)File: DOODLE HOMES Form 5 2022-2023 Scanned.pdf | 6 Mar 2026 |
| Form 5 (FY 2023-2024)File: DOODLE HOMES Form 5 2023-2024 Scanned.pdf | 6 Mar 2026 |
| Form 1File: Form 1 June 2023 Q1.pdf | 2 Mar 2026 |
| Form 2File: Form 2 June 2023 Q1.pdf | 2 Mar 2026 |
| Form 3File: Form 3 June 2023 Q1.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2023 Q1.pdf | 2 Mar 2026 |
| Form 1File: DOODLE HOMES LLP Form 1 2023-24 Q2 RERA.pdf | 2 Mar 2026 |
| Form 2File: DOODLE HOMES LLP Form 2 2023-24 Q2 RERA (1).pdf | 2 Mar 2026 |
| Form 3File: DOODLE HOMES LLP Form 3 2023-24 Q2 RERA Scanned 180624.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2023 Q2.pdf | 2 Mar 2026 |
| Form 1File: DOODLE HOMES LLP Form 1 2023-24 Q3 RERA (1).pdf | 2 Mar 2026 |
| Form 2File: DOODLE HOMES LLP Form 2 2023-24 Q3 RERA (1).pdf | 2 Mar 2026 |
| Form 3File: DOODLE HOMES LLP Form 3 2023-24 Q3 RERA Scanned 180624.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2023-Q3.pdf | 2 Mar 2026 |
| Form 1File: Form 1 March 2023 Q4.pdf | 2 Mar 2026 |
| Form 2File: Form 2 March 2023 Q4.pdf | 2 Mar 2026 |
| Form 3File: Form 3 March 2023 Q4.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2023-Q4.pdf | 2 Mar 2026 |
| Form 1File: Form 1 June 2024 Q1.pdf | 2 Mar 2026 |
| Form 2File: Form 2 June 2024 Q1.pdf | 2 Mar 2026 |
| Form 3File: Form 3 June 2024 Q1.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2024-Q1.pdf | 2 Mar 2026 |
| Form 1File: Form 1 Sept 2024 Q2.pdf | 2 Mar 2026 |
| Form 2File: Form 2 Sept 2024 Q2.pdf | 2 Mar 2026 |
| Form 3File: Form 3 Sept 2024 Q2.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2024-Q2.pdf | 2 Mar 2026 |
| Form 1File: Form 1 December 2024 Q3.pdf | 2 Mar 2026 |
| Form 2File: Form 2 December 2024 Q3.pdf | 2 Mar 2026 |
| Form 3File: Form 3 December 2024 Q3.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2024-Q3.pdf | 2 Mar 2026 |
| Form 1File: DOODLE HOMES LLP Form 1 2023-24 Q4 RERA.pdf | 2 Mar 2026 |
| Form 2File: DOODLE HOMES LLP Form 2 2023-24 Q4 RERA.pdf | 2 Mar 2026 |
| Form 3File: DOODLE HOMES LLP Form 3 2023-24 Q4 RERA Scanned 180624.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2023-Q4.pdf | 2 Mar 2026 |
| Form 1File: DOODLE HOMES LLP Form 1 2024-25 Q4 RERA.pdf | 2 Mar 2026 |
| Form 2File: DOODLE HOMES LLP Form 2 2024-25 Q4 RERA.pdf | 2 Mar 2026 |
| Form 3File: DOODLE HOMES LLP Form 3 2024-25 Q4 RERA 020625 Sign_compressed.pdf | 2 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: 2024-Q4.pdf | 2 Mar 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DOODLE HOMES LLP Form 3 2024-25 Q1 RERA 190225 Sign_compressed.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DOODLE HOMES LLP Form 3 2024-25 Q2 RERA 190225 Sign_compressed.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DOODLE HOMES LLP Form 3 2024-25 Q3 RERA 190225 Sign_compressed.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DOODLE HOMES LLP Form 1 2024-25 Q1 RERA.pdf | 12 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DOODLE HOMES LLP Form 1 2024-25 Q2 RERA.pdf | 12 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DOODLE HOMES LLP Form 1 2024-25 Q3 RERA.pdf | 12 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DOODLE HOMES LLP Form 2 2024-25 Q1 RERA.pdf | 12 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DOODLE HOMES LLP Form 2 2024-25 Q2 RERA_compressed.pdf | 12 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DOODLE HOMES LLP Form 2 2024-25 Q3 RERA.pdf | 12 Feb 2025 |
| Layout approvalFile: 0 Doodle Layout 10-13 030424.pdf | 27 Jul 2024 |
| Layout approvalFile: 0 Doodle Layout 1 030424.pdf | 27 Jul 2024 |
| Layout approvalFile: 0 Doodle Layout 2-5 030424.pdf | 27 Jul 2024 |
| Layout approvalFile: 0 Doodle Layout 6-9 030424.pdf | 27 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 0 Doodle Layout 1 030424.pdf | 27 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 0 Doodle Layout 2-5 030424.pdf | 27 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 0 Doodle Layout 6-9 030424.pdf | 27 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: 0 Doodle Layout 10-13 030424.pdf | 27 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 0 Doodle CC 030424.pdf | 27 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DOODLE HOMES LLP Form 3 2023-24 Q1 RERA 020823 SIGN.pdf | 7 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DOODLE HOMES LLP Form 1 2023-24 Q1 RERA.pdf | 2 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DOODLE HOMES LLP Form 2 2023-24 Q1 RERA 020823.pdf | 2 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DOODLE HOMES LLP Form 1 2022-23 Q4 RERA.pdf | 19 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DOODLE HOMES LLP Form 2 2022-23 Q4 RERA.pdf | 19 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DOODLE HOMES LLP Form 3 2022-23 Q4 RERA 190523 SIGN_compressed.pdf | 19 May 2023 |
| Details of encumbrances concerned to FinanceFile: Adobe Scan 08-Feb-2023.pdf | 8 Feb 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 116 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DOODLE HOMES on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near PUNE13,700+ in Pune
Filed coordinates, straight-line distance. 433 registered projects within 2 km.
CANARY FARMS
CANARY FARMS
HRIDAAN HEIGHTS
R SQUARE BUILDERS AND DEVELOPERS
Amoda Reserve - South Park
Kalpataru Properties (Thane) Private Limit
Nakshatra Valley
Hariom Sai Developers
MANTRA DIVINE PHASE 2
MANTRA UNIVERSE PRIVATE LIMITED
EMERALD VILLAS
ASHWIN ARVIND SANGHVI
Builder: DOODLE HOMES LLP
DOODLE HOMES LLP has 1 registration on MahaRERA, including DOODLE HOMES. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if DOODLE HOMES is delayed beyond 3 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DOODLE HOMES?
The registered promoter entity is DOODLE HOMES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DOODLE HOMES?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DOODLE HOMES?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DOODLE HOMES?
The professionals named in the filing: Architect: Kanhaiya Associates Architects; Architect: ABHISHEK PANSE; Engineer: Romit Varia; Engineer: ASSOCIATED STRUCTURAL ENGINEERS LLP; Engineer: PANKAJ RAVINDRANATH SAWANT; Chartered Accountant: DINESH J POKAR & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DOODLE HOMES?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback