De-registered No litigation declared Commercial project

Dominion Park

By Amalfi Realty Pvt Ltd

RG-MH-15367 · RERA P52100024698 · Last updated on MahaRERA portal: 18 Apr 2024

Source: official MahaRERA filing

Red flags

  • De-registered
  • Possession 34 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 10%
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

Dominion Park is a Commercial project by Amalfi Realty Pvt Ltd in Pune, Maharashtra, registered with MahaRERA as P52100024698 on 28 Feb 2020. Possession was promised by 30 Dec 2023 and is now 34 months past that date.

At a glance

Project

  • NameDominion Park
  • TypeCommercial
  • Location
    • NH 48
    • Near PCMC water tank
    • Punawale
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024698
  • ReraGenie IDRG-MH-15367

Builder

  • NameAmalfi Realty Pvt Ltd
  • Entity typeCompany
  • DirectorsJaved Faizullah Tapia, Farokh Kekhushroo Banatwalla

Key dates

34 months past promisethis monthRegisteredFeb 2020PromisedDec 2023

Key facts

Registration and timeline

  • StatusDe-registered
  • Registered on28 Feb 2020
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block BNA70000
Block CNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 10%.

Block B11%
ActivityProgress
Excavation100%
Basement (if any)10%
Podiums (if any)0%
Plinth10%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Block C10%
ActivityProgress
Excavation100%
Basement (if any)5%
Podiums (if any)0%
Plinth5%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed128

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots128
Open Space128
BuildingOpen SpaceTotal
Block B1010
Block C118118

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,245 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Nandakumar Bhalchandra BhondveRajpuriPune

Approvals and building plan

Permissible FSI13008.23
Proposed, not sanctioned13,008 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Manikchand Icon Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSupriya Jadhav
EngineerKiran Chavan
Chartered AccountantRupak Jain and Company
Chartered AccountantCNK P D Kudva & Company
PartnerRole in project
Amalfi Realty Pvt Ltd-

Litigation declared4

CaseCourtStatus
117/2001Pimpri Civil CourtCounter claim is pending for evidence
606/2016Civil Court PunePending for Services to Defendants and hearing of Order seven Rule eleven Application
750/2012Civil Court PunePending for Return of Summons Notices and hearing of Order Seven Rule Eleven Application
515/2018Civil Court PuneReturn of Summons and Notices

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Jan 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DP Form 1 31 3 22.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DP Form 1 31 12 21.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DP form 1 30 6 22.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DP Form 1 30 9 22.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DP FORM 2 31 12 21.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DP FORM 2 31 3 22.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DP FORM 2 30 6 22.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DP FORM 2 30 9 22.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARPL - DP - Form - 3 - Apr to June 2022.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARPL - DP - Form - 3 - Jan to Mar 2022.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARPL - DP - Form - 3 - July to Sept 2021.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: ilovepdf_merged (4).pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DP form 1 4-09-23.pdf1 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DP FORM 2 31 03 21.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DP form 2 4 9 23 (2).pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 4 9 23_compressed.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 31 03 21_compressed.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 - 31 3 2022_compressed.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 30 06 2022_compressed.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 - 31 3 2022_compressed.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - 30 06 2022_compressed.pdf22 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DP form 1 31 03 21.pdf2 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DP form 2 4 9 23.pdf2 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ARPL DP Form 5 FY2022-23.pdf28 Sep 2023
Disclosure of sold/ booked inventoryFile: Dominion Park 30-06-2023 B and C Block.pdf31 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARPL - DP - Block B C - Form 3 - 30-06-2023_compressed.pdf30 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DP form 1 june 2023.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DP form 2 june 2023.pdf19 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: DP Form 2A FY 2022-23.pdf19 Jul 2023
Disclosure of sold/ booked inventoryFile: Dominion Park Block B_Rera Updates_31-03-2023.pdf11 May 2023
Disclosure of sold/ booked inventoryFile: Dominion Park Block C_Rera Updates_31-03-2023.pdf11 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Block B-C - 31-03-2023.pdf11 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf21 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 Engineer Certificate.pdf21 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A Quality Assurance.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf11 Mar 2023
Disclosure of sold/ booked inventoryFile: Dominion Park Block B_Rera Updates.pdf2 Mar 2023
Disclosure of sold/ booked inventoryFile: Dominion Park_Rera Updates_-2-4_compressed.pdf2 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf4 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf4 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a.pdf4 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (2).pdf8 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Dominion Park Form 5 2021 22.pdf15 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf11 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf11 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a.pdf11 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certiifcate Form 3 DP_compressed.pdf29 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf5 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf5 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: DP Form 2A.pdf23 Jul 2022
Disclosure of sold/ booked inventoryFile: Sold unsold (B).pdf27 Apr 2022
Disclosure of sold/ booked inventoryFile: Sold unsold (c).pdf27 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer certificate (3).pdf20 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate DP_compressed.pdf14 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A DP sept 2021.pdf14 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DP Form 1 31-12-21.pdf29 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 DP 31-12-2021.pdf29 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A sept 2021.pdf29 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Dominion park form 2a sept 2020.pdf29 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ARPL - DP - Form - 3 - compressed.pdf28 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ARPL - DP - Form 5 - FY 2020-21.pdf28 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 19-20.pdf12 Aug 2021
PAN CardFile: PAN Amalfi Realty.pdf26 Feb 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Dominion Park Block B and C.pdf28 Jan 2020
Layout approvalFile: Layout B and C.pdf16 Jan 2020
Building plan approvalFile: block B 1.pdf16 Jan 2020
Building plan approvalFile: block b 2.pdf16 Jan 2020
Building plan approvalFile: block c1.pdf16 Jan 2020
Building plan approvalFile: block c2.pdf16 Jan 2020
Building plan approvalFile: block c3.pdf16 Jan 2020
Building plan approvalFile: block C5.pdf16 Jan 2020
Building plan approvalFile: block c4.pdf16 Jan 2020
Copy of the legal title reportFile: Title Certificate.pdf16 Jan 2020
Copy of the legal title reportFile: Supplimentary Tittle report.pdf16 Jan 2020
Copy of the legal title reportFile: Search and Title Report.pdf16 Jan 2020
Details of encumbrancesFile: No Encumburance.pdf16 Jan 2020
Copy of Layout Approval (in case of layout)File: Layout B and C.pdf16 Jan 2020

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dominion Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near PCMC water tank13,700+ in Pune

2 kmDominion ParkCompleted 78Lapsed / revoked 26Other 114Dot size: filed unitsN

Filed coordinates, straight-line distance. 218 registered projects within 2 km.

Builder: Amalfi Realty Pvt Ltd

Amalfi Realty Pvt Ltd has 1 registration on MahaRERA, including Dominion Park. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Dominion Park shows as de-registered on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Dominion Park is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dominion Park?

The registered promoter entity is Amalfi Realty Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dominion Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dominion Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dominion Park?

The professionals named in the filing: Architect: Supriya Jadhav; Engineer: Kiran Chavan; Chartered Accountant: Rupak Jain and Company; Chartered Accountant: CNK P D Kudva & Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dominion Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dominion Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dominion Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.