Completed No litigation declared Mixed project

DODKE PALAZZO

By DODKE LANDMARKS

RG-MH-22233 · RERA P52100031044 · Last updated on MahaRERA portal: 4 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 18 months
  • 3 extensions taken
  • Rs 55.00 crore secured on the land, in favour of ADITYA BIRLA HOUSING FINANCE LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
17 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
30 of 134Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 200 documents Report an error

DODKE PALAZZO is a Mixed project by DODKE LANDMARKS in Pune, Maharashtra, registered with MahaRERA as P52100031044 on 1 Oct 2021. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 18 months from the original filing. 104 of the 134 units on this registration are recorded sold or booked, and 17 of 22 construction stages are filed complete.

At a glance

Project

  • NameDODKE PALAZZO
  • TypeMixed
  • Location
    • KOTHRUD
    • KOTHRUD-EXT
    • Haveli
    • Pune
    • 411038
  • Pincode411038
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100031044
  • ReraGenie IDRG-MH-22233

Builder

  • NameDODKE LANDMARKS
  • Entity typePartnership
  • PartnersYOGESH LAXMAN DODKE, ANKUSH DNYANOBA DODKE

Key dates

this monthRegisteredOct 2021First promiseDec 2024Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on1 Oct 2021
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2024)
  • Buildings2 building records
  • Documents filed200 files

Current status

78%104 of 134 units booked
98.7%Work done, per cost certificate

Figures as on 4 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DODKE PALAZZO A WINGNA1715442266
DODKE PALAZZO B WINGNA1715452368

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

17 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

DODKE PALAZZO A WING90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
DODKE PALAZZO B WING90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes95%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes85%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed459

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots459
Closed/Covered459
BuildingClosed/CoveredTotal
DODKE PALAZZO A WING247247
DODKE PALAZZO B WING212212

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,900 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA HOUSING FINANCE LIMITED
Secured amountRs 55.00 crore
CERSAI search filedYes
Declared on3 Jul 2025

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI13960.82
Proposed, not sanctioned13,944 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Patil Palace, S No 2 1, Nda Pashan Road, Bavdhan, Pune, Maharashtra 411021
Estimated costRs 37.20 cr
Cost incurredRs 36.71 cr
Work done98.68%
BuildingWingEstimatedIncurred
DODKE PALAZZO B WINGNARs 16.66 crRs 16.49 cr
DODKE PALAZZO A WINGNARs 16.60 crRs 16.44 cr
-NARs 3.94 crRs 3.78 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANKUR ASSOCIATES
EngineerK P BADGUJAR CONSULTANCY PVT LTD
Chartered AccountantSBH AND COMPANY
Chartered AccountantPATEL AND SHARMA
Chartered AccountantAgarwal Sarawgi and Associates
PartnerRole in project
DODKE LANDMARKS-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025257Dec 2024 → Jun 2025

Reason as filed by the promoterThat 77% of the work is completed and the same is reflecting on the Form 1 Architect Certificate dated 27/12/2024 uploaded on the RERA website. We need 6 months extension to complete the pending work of the said project. This is the first extension, earlier we have never applied for the extension.

EA03072501934Dec 2024 → Dec 2025

Reason as filed by the promoter1.The project was registered on 01/10/2021 and proposed date of completion was 30/06/2025. 2. The delay was caused due to the work stop order dated 18/12/2024 issued by Pune Municipal Corporation, resulting in the suspension of all construction activities related to the said project. Therefore, the pending work was halted. 3. Because of the unforeseen circumstances the project work was completely on hold and the promoter suffered heavy financial setback for removing the said the project from work stop order. 4.On 03/06/2025 the said work stop order was revoked by the Pune Municipal Corporation

EA30122519151Dec 2024 → Jun 2026

Reason as filed by the promoterConstruction of the said project is 100% completed. We have received the Part Occupancy Certificate on 16/10/2025. Awaiting for the Full Occupancy Certificate.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Sep 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed200

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 200 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: PROJECT -FINAL OC.pdf4 Jun 2026
Occupational CertificateFile: OC Verification.pdf4 Jun 2026
Occupational CertificateFile: PMC Occupancy Certificate 16-10-2025 (1).pdf4 Jun 2026
Layout approvalFile: Layout Plan.pdf2 Jun 2026
Building plan approvalFile: Sanctioned plan 3-7.pdf2 Jun 2026
Building plan approvalFile: Sanctioned plan 4-7.pdf2 Jun 2026
Withdrawal Update Form 1File: form 1- Q4.pdf13 May 2026
Withdrawal Update Form 2File: Form 2 -Q4.pdf13 May 2026
Withdrawal Update Form 3File: Form 3 -Q4.pdf13 May 2026
Building plan approvalFile: Parking Floor Plan.pdf31 Mar 2026
Building plan approvalFile: Floor Plan 4.pdf31 Mar 2026
Building plan approvalFile: Floor Plan 5.pdf31 Mar 2026
Building plan approvalFile: Floor Plan 6.pdf31 Mar 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3 (2).pdf20 Jan 2026
Withdrawal Update Form 1File: Architect Certificate - 30-09-25 Sign.pdf15 Oct 2025
Withdrawal Update Form 2File: FORM 2 FINAL.pdf15 Oct 2025
Withdrawal Update Form 3File: Form 03 dodke landmarks- Sept 25 - Sign.pdf15 Oct 2025
Form 5 (FY 2024-2025)File: Dodke Form 5.pdf8 Oct 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE - 30-06-2025.pdf29 Jul 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate 30-06-2025.pdf29 Jul 2025
Withdrawal Update Form 3File: Form 03 CA CERTIFICATE 30-06-2025.pdf29 Jul 2025
Form 1File: f1 dec 21.pdf30 Jun 2025
Form 2File: f2 dec 21.pdf30 Jun 2025
Form 3File: f3 dec21.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold dec 21.pdf30 Jun 2025
Form 1File: f1 mar 22.pdf30 Jun 2025
Form 2File: f2 mar 22.pdf30 Jun 2025
Form 3File: f3 mar 22.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold mar 22.pdf30 Jun 2025
Form 1File: f1 jun 22.pdf30 Jun 2025
Form 2File: f2 jun 22.pdf30 Jun 2025
Form 3File: f3 jun22.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold jun 22.pdf30 Jun 2025
Form 1File: f1 sep 22.pdf30 Jun 2025
Form 2File: f2 sep 22.pdf30 Jun 2025
Form 3File: f3sep22.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold sep 22.pdf30 Jun 2025
Form 1File: f1 dec 22.pdf30 Jun 2025
Form 2File: f2 (1).pdf30 Jun 2025
Form 3File: f3 dec 22.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD CIRCULAR 29 (1).pdf30 Jun 2025
Form 1File: f1 mar 23.pdf30 Jun 2025
Form 2File: f2mar 23.pdf30 Jun 2025
Form 3File: f3mar 23.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD CIRCULAR 29 (2) (1).pdf30 Jun 2025
Form 1File: f1 jun 23.pdf30 Jun 2025
Form 2File: f2 jun 23.pdf30 Jun 2025
Form 3File: f3jun 23.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold jun 23.pdf30 Jun 2025
Form 1File: f1 sep 23 dod.pdf30 Jun 2025
Form 2File: f2 sep 23 dod.pdf30 Jun 2025
Form 3File: f3sep 23.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold sep 23.pdf30 Jun 2025
Form 1File: f1 dec 23.pdf30 Jun 2025
Form 2File: f2 dec 23 dod.pdf30 Jun 2025
Form 3File: f3 dec 23.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold dec 23.pdf30 Jun 2025
Form 1File: f1 mar 24.pdf30 Jun 2025
Form 2File: f2 mar 24.pdf30 Jun 2025
Form 3File: f3 mar 24.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold mar 24.pdf30 Jun 2025
Form 1File: f1 jun 24.pdf30 Jun 2025
Form 2File: f2 jun 24.pdf30 Jun 2025
Form 3File: f3 jun 24.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold jun 24.pdf30 Jun 2025
Form 1File: f1 sep 24.pdf30 Jun 2025
Form 2File: f2 sep 24.pdf30 Jun 2025
Form 3File: f3sep 24.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold sep 24 dod.pdf30 Jun 2025
Form 1File: f1 dec 24.pdf30 Jun 2025
Form 2File: f2 dec 24.pdf30 Jun 2025
Form 3File: f3 dec 24.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold dec 24 dod.pdf30 Jun 2025
Form 1File: f1 mar 25.pdf30 Jun 2025
Form 2File: f2 mar 25.pdf30 Jun 2025
Form 3File: f3mar 25.pdf30 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold mar 25.pdf30 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - 01-04-2025.pdf12 Apr 2025

How this compares with Pune

78%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DODKE PALAZZO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOTHRUD13,700+ in Pune

2 kmDODKE PALAZZOCompleted 98Lapsed / revoked 49Other 156Dot size: filed unitsN

Filed coordinates, straight-line distance. 303 registered projects within 2 km.

Builder: DODKE LANDMARKS

DODKE LANDMARKS has 1 registration on MahaRERA, including DODKE PALAZZO. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if DODKE PALAZZO is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DODKE PALAZZO?

The registered promoter entity is DODKE LANDMARKS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DODKE PALAZZO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DODKE PALAZZO?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DODKE PALAZZO?

The professionals named in the filing: Architect: ANKUR ASSOCIATES; Engineer: K P BADGUJAR CONSULTANCY PVT LTD; Chartered Accountant: SBH AND COMPANY; Chartered Accountant: PATEL AND SHARMA; Chartered Accountant: Agarwal Sarawgi and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DODKE PALAZZO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DODKE PALAZZO. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DODKE PALAZZO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.