Home / Browse projects / Aurangabad, Maharashtra / DISHA VINAYAK PHASE 2
DISHA VINAYAK PHASE 2
By DNK COMBINES
RG-MH-00837 · RERA P51500001666 · Last updated on MahaRERA portal: 14 Jan 2023
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 46 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DISHA VINAYAK PHASE 2 is a Residential / Group Housing project by DNK COMBINES in Aurangabad, Maharashtra, registered with MahaRERA as P51500001666 on 29 Jul 2017. Possession was promised by 30 Dec 2022 and is now 46 months past that date.
At a glance
Project
- NameDISHA VINAYAK PHASE 2
- TypeResidential / Group Housing
- Location
- Satara (CT)
- Aurangabad
- 431010
- Pincode431010
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51500001666
- ReraGenie IDRG-MH-00837
Builder
- NameDNK COMBINES
- Entity typePartnership
- PartnersANITA DEVANAND KOTGIRE, Pratik Rajkumar Agrawal, Ajay Devanand Kotgire, Ajinkya Naresh Sikchi
- Other registrations2 more →
- Completed1 of 3
- No longer live2 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on29 Jul 2017
- Promised completion30 Dec 2022
- Revised completionNone
- Buildings1 building record
- Documents filed57 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING A2 | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 14 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
BUILDING A2: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 14 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed42
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | AJAYKUMAR NARAYAN THAKUR |
| Engineer | ABHAY PATIL |
| Partner | Role in project |
|---|---|
| DNK COMBINES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed57
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Foreclosure of the ProjectFile: 1 Other.pdf | 14 Jan 2023 |
| OtherFile: DNK-COMBINE-RERA.PDF | 10 Jul 2021 |
| Certificates of CA (Form 3)File: DEC-19- FORM 03 - Phase -2 CA Certificate Disha Vinayak - Copy - Copy.pdf | 15 May 2021 |
| Certificates of CA (Form 3)File: MAR-20- FORM 03 - Phase -2 CA Certificate Disha Vinayak.pdf | 15 May 2021 |
| Certificates of CA (Form 3)File: JUN-20- FORM 03 - Phase -2 CA Certificate Disha Vinayak.pdf | 15 May 2021 |
| Certificates of CA (Form 3)File: SEP-19- FORM 03 - Phase -2 CA Certificate Disha Vinayak - Copy - Copy.pdf | 15 May 2021 |
| Certificates of CA (Form 3)File: SEP-20- FORM 03 - Phase -2 CA Certificate Disha Vinayak.pdf | 15 May 2021 |
| Certificates of CA (Form 3)File: DEC-20- FORM 03 - Phase -2 CA Certificate Disha Vinayak.pdf | 15 May 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DVII -Architech Certificate - MARCH 2020.pdf | 23 Mar 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DVII -Architech Certificate - JULY 2020.pdf | 23 Mar 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DVII -Architech Certificate - SEPT 2020.pdf | 23 Mar 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DVII - Engineer Certificate - MARCH 2020.pdf | 23 Mar 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DVII - Engineer Certificate - jULY 2020.pdf | 23 Mar 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DVII - Engineer Certificate - SEPT 2020.pdf | 23 Mar 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 DNK Combines 1666 phase 2.pdf | 10 Jun 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DNKC-DV P2-RERA-Q1-FY1920-Arct Cert.PDF | 15 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DNKC-DV P2-RERA-Q2-FY1920-Arct Cert.PDF | 15 Feb 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DNKC-DV P2-RERA-Q3-FY1920-Arct Cert.pdf | 15 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DNKC-DV P2-RERA-Q1-FY1920-Engg Cert.PDF | 15 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DNKC-DV P2-RERA-Q2-FY1920-Engg Cert.pdf | 15 Feb 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DNKC-DV P2-RERA-Q3-FY1920-Engg Cert.pdf | 15 Feb 2020 |
| Certificates of CA (Form 3)File: CA Certificate Disha Vinayak phase ii.pdf | 29 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DNKC-Architect Cert Mar19.pdf | 14 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DNKC-Engg Cert Mar19.pdf | 14 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DNKC-Engineer Cert Dec 18.pdf | 20 Mar 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DNKC-Architect Cert_0001.pdf | 27 Feb 2019 |
| Certificates of CA (Form 3)File: Disha vinayak Phase-II Date 20-01-19.pdf | 16 Feb 2019 |
| Certificates of CA (Form 3)File: DISHA VINAYAK PHASE-II DATE 8-7-18.pdf | 27 Dec 2018 |
| Certificates of CA (Form 3)File: DISHA VINAYAK PHASE-II DATE 9-10-18.pdf | 27 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DV Phase II -Arch Certi 30-06-18.PDF | 25 Dec 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DV Phase II -Arch Certi 30-10-18.PDF | 25 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DV PHASE II - Engg.PDF | 25 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DV Phase II -Engg Certi 30-06-18.PDF | 25 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DV Phase II -Engg Certi 30-10-18.PDF | 25 Dec 2018 |
| Certificates of CA (Form 5)File: disha vinayak phase II.pdf | 4 Nov 2018 |
| Certificates of CA (Form 3)File: Disha Vinayak Phase - ii.pdf | 25 Aug 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DV PHASE II - aRC.PDF | 28 May 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DV Phase II - Arch Certificate.PDF | 16 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DV Phase II - Engg Certificate.PDF | 16 Feb 2018 |
| Certificates of CA (Form 3)File: Disha Vinayak Phase 2.pdf | 1 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DV_PHASE_II_-_Architect_Certifiacte.pdf | 10 Nov 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DV_PHASE_II_-_Engg_Certificate.pdf | 10 Nov 2017 |
| Certificates of CA (Form 3)File: Disha Vinayak Phase 2.pdf | 10 Nov 2017 |
| Declaration in FORM BFile: FORM B VINAYAK PS 2.pdf | 27 Jul 2017 |
| Commencement Certificates / NA Order for plotted developmentFile: DV_Commencement_certificate.pdf | 26 Jul 2017 |
| Certificates of CA (Form 3)File: DNK COMBINES pHASE II.pdf | 26 Jul 2017 |
| Layout approvalFile: VINAYAK LAYOUT.pdf | 25 Jul 2017 |
| Building plan approvalFile: VINAYAK PHASE 2 BUILDING A.pdf | 25 Jul 2017 |
| PAN CardFile: PAN_CARD_-_DNK_Combines.pdf | 25 Jul 2017 |
| Copy of the legal title reportFile: DV - tiltle cum search REport.pdf | 25 Jul 2017 |
| Details of encumbrancesFile: DV_INDEX_II.pdf | 25 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: VINAYAK LAYOUT.pdf | 25 Jul 2017 |
| Building Plan Approval (IOD)File: VINAYAK PHASE 2 BUILDING A.pdf | 25 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DV phase 2 architect certificate.pdf | 25 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DV_Engineer_Cerificate_Phase_II.pdf | 25 Jul 2017 |
| Proforma of Allotment letterFile: DV_Allottment_letter.pdf | 25 Jul 2017 |
| Proforma of Allotment letterFile: DV Agreement to Sale Part 2 (1- 10).pdf | 25 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 57 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep DISHA VINAYAK PHASE 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Satara (CT)1,400+ in Aurangabad
Filed coordinates, straight-line distance. 69 registered projects within 2 km.
Saffron Landmarks
Saffron Associates
MANISHAS WHISPER VALLEY
MANISHA'S WHISPER VALLEY
Kirtiban
Piyush Infratech Private Limited
Saffron Landscape Phase I
Saffron Associates
JABINDA GRANDEUR
JABINDA REALTY
DURGA HEIGHTS
VARAD DEVELOPERS
See every Aurangabad project, with the district possession charts
Builder: DNK COMBINES
DNK COMBINES has 3 registrations on MahaRERA, including DISHA VINAYAK PHASE 1 and DISHA VINAYAK PHASE 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What does it mean that DISHA VINAYAK PHASE 2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if DISHA VINAYAK PHASE 2 is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DISHA VINAYAK PHASE 2?
The registered promoter entity is DNK COMBINES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DISHA VINAYAK PHASE 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DISHA VINAYAK PHASE 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DISHA VINAYAK PHASE 2?
The professionals named in the filing: Architect: AJAYKUMAR NARAYAN THAKUR; Engineer: ABHAY PATIL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DISHA VINAYAK PHASE 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback