DINKAR PRASAD BUILDING
RG-MH-68724 · RERA P51800047066 · Last updated on MahaRERA portal: 25 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 36 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DINKAR PRASAD BUILDING is a Residential / Group Housing project by DESAI AND VARMA ASSOCIATES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800047066 on 29 Sep 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 4 of the 24 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameDINKAR PRASAD BUILDING
- TypeResidential / Group Housing
- Location
- MAHADEV PANDLOSKAR MARG
- DINKAR PRASAD BUILDING
- PLOT BEARING CTS 743
- 743/1 TO 8
- VILE PARLE EAST
- Andheri
- Mumbai Suburban
- 400057
- Pincode400057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800047066
- ReraGenie IDRG-MH-68724
Builder
- NameDESAI AND VARMA ASSOCIATES
- Entity typePartnership
- PartnersLAXMIKANT NAGESH DESAI, BALKRISHNA NAGESH DESAI, JAGDISH PRASAD NATHMAL VARMA, NEMICHAND VARMA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on29 Sep 2022
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2023)
- Buildings1 building record
- Documents filed48 files
Current status
Figures as on 25 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DINKAR PRASAD BUILDING | NA | 7 | 7 | 24 | 0 | 24 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
DINKAR PRASAD BUILDING: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| DESAI AND VARMA ASSOCIATES | Mumbai City | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DINKAR PRASAD BUILDING | NA | Rs 6.69 cr | Rs 6.69 cr |
| - | NA | Rs 4.81 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | NEOCON INFRASTRUCTURE SERVICES PVT LTD |
| Engineer | SHASHIKANT S THATTE |
| Engineer | Impact Designerr |
| Chartered Accountant | SHARMA SHAH & ASSOCIATES |
| Chartered Accountant | RSL & CO |
| Partner | Role in project |
|---|---|
| DESAI AND VARMA ASSOCIATES | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe project has now been completed, and we have successfully reached the final stages. We have applied for the NOC and Occupancy Certificate (OC) and are currently awaiting its issuance. While there were earlier delays, all construction and finishing work has been completed. As of now, we have initiated the handover process for the rehabilitation units, though no units have been sold to date. • Initiation of Handover Process: We have already begun the handover process for the rehab units to the allottees, in line with the project’s commitments. The handover is progressing smoothly, and we are
Reason as filed by the promoterThe building completion process is still pending. The Occupancy Certificate has not yet been issued. The correction application is pending and will be proceeded shortly.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Aug 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Aug 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed48
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Dinkar Prasad - Q4 - Form 1.pdf | 25 May 2026 |
| Withdrawal Update Form 2File: Dinkar Prasad - Q4 - Form 2.pdf | 25 May 2026 |
| Withdrawal Update Form 3File: Dinkar Prasad - Q4 - Form 3.pdf | 25 May 2026 |
| Form 5 (FY 2024-2025)File: KUSUM RESIDENCY - 2024-25 - FORM 5.pdf | 3 Apr 2026 |
| Form 2A (FY 2024-2025)File: DINKAR PRASAD - FORM 2A.pdf | 13 Mar 2026 |
| Withdrawal Update Form 1File: DINKAR PRASAD - Q3 - FORM 1.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: DINKAR PRASAD - Q3 - FORM 2.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: DINKAR PRASAD - Q3 - FORM 3.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: DINKAR PRASAD - Q1 - FORM 1.pdf | 5 Mar 2026 |
| Withdrawal Update Form 1File: DINKAR PRASAD - Q1 - FORM 1.pdf | 5 Mar 2026 |
| Withdrawal Update Form 1File: DINKAR PRASAD - Q2 - FORM 1.pdf | 5 Mar 2026 |
| Withdrawal Update Form 2File: DINKAR PRASAD - Q1 - FORM 2.pdf | 5 Mar 2026 |
| Withdrawal Update Form 2File: DINKAR PRASAD - Q1 - FORM 2 (FINAL).pdf | 5 Mar 2026 |
| Withdrawal Update Form 2File: DINKAR PRASAD - Q2 - FORM 2 (FINAL).pdf | 5 Mar 2026 |
| Withdrawal Update Form 3File: DINKAR PRASAD - Q1 - FORM 3.pdf | 5 Mar 2026 |
| Withdrawal Update Form 3File: DINKAR PRASAD - Q1 - FORM 3.pdf | 5 Mar 2026 |
| Withdrawal Update Form 3File: DINKAR PRASAD - Q2 - FORM 3.pdf | 5 Mar 2026 |
| Proforma of Allotment letterFile: DRAFT SALE AGREEMENT.pdf | 14 Sep 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: 1 PAN CARD.pdf | 14 Sep 2022 |
| Other - LegalFile: DRAFT ALLOTMENT LETTER.pdf | 14 Sep 2022 |
| Other - LegalFile: DRAFT SALE AGREEMENT.pdf | 14 Sep 2022 |
| Other - LegalFile: 36 Deviation Report with respect to model copy of Agreement.pdf | 14 Sep 2022 |
| Other - TechnicalFile: DRAFT SALE AGREEMENT.pdf | 3 Sep 2022 |
| Layout approvalFile: APPROVED PLAN BMC_compressed.pdf | 22 Aug 2022 |
| Building plan approvalFile: APPROVED PLAN BMC_compressed.pdf | 22 Aug 2022 |
| Copy of Layout Approval (in case of layout)File: APPROVED PLAN BMC_compressed.pdf | 22 Aug 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: APPROVED PLAN BMC_compressed.pdf | 22 Aug 2022 |
| Proforma of Allotment letterFile: DRAFT ALLOTMENT LETTER.pdf | 22 Aug 2022 |
| Deviation Report with respect to Allotment letterFile: 30 NO DEVIATION CERTIFICATE.pdf | 22 Aug 2022 |
| Deviation Report with respect to model copy of AgreementFile: 30 NO DEVIATION CERTIFICATE.pdf | 22 Aug 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 23 FORMAT A _SPERATE BANK AC NEW .pdf | 20 Aug 2022 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBERACNCE CENTIFICATE.pdf | 5 Aug 2022 |
| Declaration in FORM BFile: 6 SEEMA PATKI_compressed.pdf | 5 Aug 2022 |
| CERSAI detailsFile: 23 ASSET BASED SEARCH REPORT.pdf | 5 Aug 2022 |
| CERSAI detailsFile: 24 DEBTORS BASED SEARCH REPORT.pdf | 5 Aug 2022 |
| PAN CardFile: 01 PAN CARD DESAI AND VARMA ASSOC.pdf | 3 Aug 2022 |
| Copy of the legal title reportFile: 02 - LEGAL TITLE CERTIFICATE_.pdf | 3 Aug 2022 |
| Details of encumbrances concerned to FinanceFile: 04 DECLARATION OF ENCUMBRANCE.pdf | 3 Aug 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 06 COMMENCEMENT CERTIFICATE_UPDATED.pdf | 3 Aug 2022 |
| Declaration about Commencement CertificateFile: 09 DECLARATION ABOUT COMMENCEMENT CERTIFICATE .pdf | 3 Aug 2022 |
| Declaration in FORM BFile: 1 NALINI NAGESH DESAI_compressed.pdf | 3 Aug 2022 |
| Declaration in FORM BFile: 2 BALKRISHNA NAGESH DESAI.pdf | 3 Aug 2022 |
| Declaration in FORM BFile: 3 JAGISHPRASAD N VARMA.pdf | 3 Aug 2022 |
| Declaration in FORM BFile: 4 LAXMIKANT NAGESH DESAI.pdf | 3 Aug 2022 |
| Declaration in FORM BFile: 5 NEMICHAND S VARMA_compressed.pdf | 3 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 FORM 1 - ARCHITECT CERTIFICATE _compressed.pdf | 3 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 14 FORM 2 - ENGINEER'S CERTIFICATE_compressed.pdf | 3 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 15 FORM 3 - CHARTERED ACCOUNTANT CERTIFICATE_.pdf | 3 Aug 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 48 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DINKAR PRASAD BUILDING on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DINKAR PRASAD BUILDING , PLOT BEARING CTS 743,743/1 TO 8 , VILE PARLE EAST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 342 registered projects within 2 km.
Vijayraj Residency
Vijayraj Realtors
ZEE HAPPY VEENA
ZEE LIFESPACES
Romell Espalier
ROMELL REAL ESTATE PRIVATE LIMITED
ZEE SHAAN
TRISUL DEVELOPERS
SALE BUILDING 1 - CHAMUNDA CROWN AND SALE BUIL
Chamunda Builders & Developers
ARKADE PEARL 1
ARKADE DEVELOPERS LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: DESAI AND VARMA ASSOCIATES
DESAI AND VARMA ASSOCIATES has 1 registration on MahaRERA, including DINKAR PRASAD BUILDING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if DINKAR PRASAD BUILDING is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DINKAR PRASAD BUILDING?
The registered promoter entity is DESAI AND VARMA ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DINKAR PRASAD BUILDING?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DINKAR PRASAD BUILDING?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DINKAR PRASAD BUILDING?
The professionals named in the filing: Architect: NEOCON INFRASTRUCTURE SERVICES PVT LTD; Engineer: SHASHIKANT S THATTE; Engineer: Impact Designerr; Chartered Accountant: SHARMA SHAH & ASSOCIATES; Chartered Accountant: RSL & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DINKAR PRASAD BUILDING?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback