DHOOMAVATHI PRIDE
By BALACHANDRA
RG-KA-70146 · RERA PRM/KA/RERA/1273/318/PR/160524/006875 · Last updated on RERA Karnataka portal: 8 May 2024
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
DHOOMAVATHI PRIDE is a Residential/Group Housing project by BALACHANDRA in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/160524/006875 on 16 May 2024. Possession is promised by 31 Dec 2027. 0 of the 13 units on this registration are recorded sold or booked, and 0 of 14 construction stages are filed complete.
At a glance
Project
- NameDHOOMAVATHI PRIDE
- TypeResidential/Group Housing
- Location
- Udupi
- 576105
- Pincode576105
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1273/318/PR/160524/006875
- ReraGenie IDRG-KA-70146
Builder
- NameBALACHANDRA
- Entity typeProprietorship
- Authorized SignatoryBALACHANDRA
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on16 May 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed88 files
Current status
Figures as on 8 May 2024, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DHOOMAVATHI PRIDE | - | - | - | 13 | 0 | 13 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 8 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 14 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.
Building: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | - |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 8 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | Yes | - |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | - |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | - |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | No | Not applicable |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | No | Not applicable |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| BALACHANDRA | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 1.60 cr | - |
| - | NA | Rs 42.00 lakh | - |
| - | NA | Rs 4.00 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YOGISHCHANDRA DHARA |
| Engineer | DILEEP PUTTUR |
| Chartered Accountant | VINEET N SHETTY |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed88
As listed on the registration, under the names the promoter filed them with; the newest 80 of 88 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/160524/006875 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| CDPFile: CDP plan.pdf | 8 May 2024 |
| village mapFile: village map.pdf | 8 May 2024 |
| commencement certificateFile: commencement certificate.pdf | 8 May 2024 |
| POLLUTION NOC NOTIFICATIONFile: pollution notification.pdf | 8 May 2024 |
| relinquishment deedFile: relinquishment deed.pdf | 8 May 2024 |
| Single siteFile: Single Layout.pdf | 8 May 2024 |
| all sanctioned drawings floor plan, sectional drawings and elevationsFile: all sanctioned drawings .pdf | 8 May 2024 |
| self attested copy of the Engineer license certificateFile: Engineer LBD Attested.pdf | 8 May 2024 |
| AMENTIES SELF ATTESTEDFile: Amenities - Attested.pdf | 8 May 2024 |
| WATER NOCFile: Water NOC - Attested.pdf | 8 May 2024 |
| MESCOM NOCFile: Mescom NOC - Attested.pdf | 8 May 2024 |
| CLARIFICATIONFile: clarification.pdf | 8 May 2024 |
| RTC, survey 171/6 | - |
| Mutation, survey 171/6 | - |
| Encumbrance Certificate, survey 171/6 | - |
| Conversion/Alienation Order, survey 171/6 | - |
| Sale/Title/Gift Deed, survey 171/6 | - |
| Khatha, survey 171/6 | - |
| Registration CertificateFile: MSME.pdf | - |
| Certificate issued by CA Form 1File: Form 1_Final.pdf | - |
| Certificate issued by Architect Form 2File: architect certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Engineers certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: litigation affidavit.pdf | - |
| Certificate from Chartered AccountFile: Form 1_Final.pdf | - |
| Balance Sheet 2022 - 2023File: BS AY 2023-24.pdf | - |
| Balance Sheet 2021 - 2022File: BS AY 2022-23.pdf | - |
| Balance Sheet 2020 - 2021File: BS AY 2021-22.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: PL AY 2023-24.pdf | - |
| Audited Profit and Loss Statement 2021 - 2022File: PL AY 2022-23.pdf | - |
| Audited Profit and Loss Statement 2020 - 2021File: PL AY 2021-22.pdf | - |
| Cash Flow Statement 2022 - 2023File: IS AY 2023-24.pdf | - |
| Cash Flow Statement 2021 - 2022File: IS AY 2022-23.pdf | - |
| Auditor's Report 2022 - 2023File: Clarification Letter relating to Audit-signed.pdf | - |
| Income Tax Return Acknowledgement 2022 - 2023File: ITR AY 2023-24.pdf | - |
| Income Tax Return Acknowledgement 2021 - 2022File: ITR AY 2022-23.pdf | - |
| Income Tax Return Acknowledgement 2020 - 2021File: ITR AY 2021-22.pdf | - |
| approved license | - |
| approved drawing | - |
| Single Layout | - |
| approved drawing | - |
| approved drawing | - |
| approved drawing | - |
| Specification | - |
| approved drawing | - |
| Single Layout | - |
| stability certificate | - |
| search report | - |
| title deed | - |
| Conversion Order | - |
| Conversion Order | - |
| mother deed | - |
| Proforma AOS | - |
| Proforma allotment letter | - |
| Brochure DP | - |
| form B | - |
| affidavit 3(1) | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| Unnamed document | - |
| danapatra | - |
| Estimate Cost | - |
| village map - Copy | - |
| septic tank and leach pit | - |
| Master Plan Mark | - |
| land calculation sheet | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Udupi
Computed across the 260+ Udupi projects on ReraGenie, from their own filings.
Keep DHOOMAVATHI PRIDE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Udupi260+ in Udupi
Filed coordinates, straight-line distance. 10 registered projects within 2 km.
KALKURA HEIGHTS
Kalkura Builders and Developers
SKYLINE
SHEYA DEVELOPERS
RUKMINI AVENUE
SURESH N GAMS
GRASSLANDS - LAKESIDE
GRAZLANZ PROPERTIES LLP
MANDAVI DOWNTOWN
MANDAVI CONSTRUCTIONS
KIRTHI PALMVILLE PHASE II
KIRTHI CONSTRUCTION
See every Udupi project, with the district possession charts
Builder: BALACHANDRA
BALACHANDRA has 1 registration on RERA Karnataka, including DHOOMAVATHI PRIDE. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Udupi district page.
Frequently asked questions
What are my rights if DHOOMAVATHI PRIDE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of DHOOMAVATHI PRIDE?
The registered promoter entity is BALACHANDRA, a proprietorship as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in DHOOMAVATHI PRIDE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at DHOOMAVATHI PRIDE?
The professionals named in the filing: Architect: YOGISHCHANDRA DHARA; Engineer: DILEEP PUTTUR; Chartered Accountant: VINEET N SHETTY. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DHOOMAVATHI PRIDE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback