DHEERAJ HEIGHTS-PHASE-1

By SASHWAT HOME

RG-MH-05458 · RERA P51700051830 · Last updated on MahaRERA portal: 1 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 24 months from the original
9 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 90%
0 of 288Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

DHEERAJ HEIGHTS-PHASE-1 is a Residential / Group Housing project by SASHWAT HOME in Thane, Maharashtra, registered with MahaRERA as P51700051830 on 7 Jul 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 24 months from the original filing. 288 of the 288 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameDHEERAJ HEIGHTS-PHASE-1
  • TypeResidential / Group Housing
  • Location
    • OPP POLYMATH SCHOOL
    • ANJURPHATA
    • NARPOLI
    • BHIWANDI
    • Bhiwandi (M Corp.)
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700051830
  • ReraGenie IDRG-MH-05458

Builder

  • NameSASHWAT HOME
  • Entity typePartnership
  • PartnersDILIPKUMAR NAVALMAL SHAH, MEHUL SANDEEP AGARWAL, ARHAM VINOD JAIN, VIKRAM GAUTAM SHRISHRIMAL
  • Other registrations1 more →

Key dates

this monthRegisteredJul 2023First promiseDec 2024Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on7 Jul 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2024)
  • Buildings2 building records
  • Documents filed108 files

Current status

100%288 of 288 units booked
71.3%Work done, per cost certificate

Figures as on 1 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA15151440144
BUILDING NO 2NA15151440144

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 1 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 90%.

BUILDING NO 173%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
BUILDING NO 282%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 1 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed304

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots304
Open Space304
BuildingOpen SpaceTotal
BUILDING NO 1152152
BUILDING NO 2152152

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area5,527 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on17 Apr 2026

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI13432.69
Proposed, not sanctioned13,433 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 2,3,4,5, PRIDE PARK, OPP LAWKIM COMPANY, GHIDBUNDER ROAD, MANPADA THANE
Estimated costRs 38.76 cr
Cost incurredRs 27.64 cr
Work done71.32%
BuildingWingEstimatedIncurred
BUILDING NO 1NARs 17.88 crRs 13.82 cr
BUILDING NO 2NARs 17.88 crRs 13.82 cr
-NARs 3.00 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRADDHA PRANJAPE
EngineerNEELESH D DABHOLKAR
Chartered AccountantMUKESH S SONI
Chartered AccountantNITIN BALAJI DHAVAN
PartnerRole in project
SASHWAT HOME-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700025005Dec 2024 → Dec 2025

Reason as filed by the promoterTHIS PROJECT IS APPROVED UNDER PMAY SCHEME WHICH WAS APPROVED BY COMPETETN AUTHORITY ON DATED 31/03/2022 AND SHOULD BE COMPLETED WITHIN 5 YEAR FROM DATE OF APPROVAL. WE HAVE STARTED CONSTRUCTION ALSO HENCE IT WILL TAKE ANOTHER 12 MONTH TO COMPLETE

EA23122518920Dec 2024 → Dec 2026

Reason as filed by the promoterDelays in the delivery of construction materials (e.g., steel, lumber, cement). Price volatility and shortages of key materials lead to project delays, as we wait for resources to arrive. our work is also mostly done but due to some work we require extension.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE PHASE 1.pdf1 Aug 2026
Withdrawal Update Form 2File: ENGINEER CERTIFICATE PHASE 1.pdf1 Aug 2026
Withdrawal Update Form 3File: SASHWAT HOME -1 FORM 3 JUNE 2026_11zon.pdf1 Aug 2026
Withdrawal Update Form 1File: PHASE 1 FORM 1 MARCH 2026 DATE WRONG..pdf2 May 2026
Withdrawal Update Form 2File: PHASE 1 FORM 2 MARCH 2026..pdf2 May 2026
Withdrawal Update Form 3File: FORM 3 SASHWAT PHASE 1 MARCH 2611zon.pdf2 May 2026
Withdrawal Update Form 1File: form 1 dec 25 date corrected.pdf17 Apr 2026
Withdrawal Update Form 1File: form 1 dec 25 date corrected.pdf17 Apr 2026
Withdrawal Update Form 1File: form 1 dec 25 date corrected.pdf17 Apr 2026
Withdrawal Update Form 1File: form 1 dec 25 date corrected.pdf17 Apr 2026
Withdrawal Update Form 1File: form 1 dec 25 date corrected.pdf17 Apr 2026
Withdrawal Update Form 1File: form 1 dec 25 date corrected.pdf17 Apr 2026
Withdrawal Update Form 2File: FORM 2 PHASE 1 SASHWAT DEC 25.pdf17 Apr 2026
Withdrawal Update Form 2File: FORM 2 PHASE 1 SASHWAT DEC 25.pdf17 Apr 2026
Withdrawal Update Form 2File: FORM 2 PHASE 1 SASHWAT DEC 25.pdf17 Apr 2026
Withdrawal Update Form 2File: FORM 2 PHASE 1 SASHWAT DEC 25.pdf17 Apr 2026
Withdrawal Update Form 2File: FORM 2 PHASE 1 SASHWAT DEC 25.pdf17 Apr 2026
Withdrawal Update Form 2File: FORM 2 PHASE 1 SASHWAT DEC 25.pdf17 Apr 2026
Withdrawal Update Form 3File: from 3 dec 25 pahe 1.pdf17 Apr 2026
Withdrawal Update Form 3File: from 3 dec 25 pahe 1.pdf17 Apr 2026
Withdrawal Update Form 3File: from 3 dec 25 pahe 1.pdf17 Apr 2026
Withdrawal Update Form 3File: from 3 dec 25 pahe 1.pdf17 Apr 2026
Withdrawal Update Form 3File: from 3 dec 25 pahe 1.pdf17 Apr 2026
Withdrawal Update Form 3File: from 3 dec 25 pahe 1.pdf17 Apr 2026
Form 1File: form 1 phase 1 sept 25.pdf18 Nov 2025
Form 2File: form 2 phase 1 sept 25.pdf18 Nov 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 25.pdf18 Nov 2025
Form 3File: FORM 3 SASHWAT PHASE 1 SEPT 25 SIGNED.pdf18 Nov 2025
Form 1File: FORM 1 SASHWAT PHASE-1 JUNE 25.pdf31 Jul 2025
Form 2File: FORM 2 SASHWAT PHASE-1 JUNE 25.pdf31 Jul 2025
Form 3File: FORM 3 SASHWAT PHASE-1 JUNE 25_11zon.pdf31 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DISCLOSURE JUNE 25.pdf31 Jul 2025
Form 1File: ARCHITECT'S CERTIFICATE PHASE 1 MARCH 25.pdf4 Jul 2025
Form 2File: FROM 2 PHASE 1 MARCH 25.pdf4 Jul 2025
Form 3File: from 3 march 25 sashwat phase 1 signed_11zon.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold declaration signed phase 1.pdf4 Jul 2025
Form 1File: FROM 1 SEPT 24.pdf19 May 2025
Form 2File: FORM 2 SIGNED-SEPT 24.pdf19 May 2025
Form 3File: SASHWAT HOME FORM 3 PHASE-1_11zon.pdf19 May 2025
Form 1File: FORM 2 SIGNED-SEPT 24.pdf19 May 2025
Form 2File: FROM 1 SEPT 24.pdf19 May 2025
Form 3File: SASHWAT HOME FORM 3 PHASE-1_11zon.pdf19 May 2025
Disclosure of Sold and Booked InventoryFile: FORM 1 - JUNE 24 - SASHWAT PHASE 1.pdf19 May 2025
Form 1File: FORM 1 SASHWAT PHASE 1 DEC 24.pdf17 May 2025
Form 2File: FORM 2 SASHWAT PHASE 1 DEC 24.pdf17 May 2025
Form 3File: FORM 3 SASHWAT PHASE 1 DEC 24_11zon.pdf17 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DISCLSOURE.pdf17 May 2025
Self-declaration of Quarterly ProgressFile: FORM 1 SASHWAT PHASE 1 DEC 24.pdf17 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SASHWAT HOME FORM 3 PHASE-1_11zon.pdf6 Nov 2024
Declaration in FORM BFile: FORM B SASHWAT.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - MARCH 24 - SASHWAT PHASE 1.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - JUNE 24 - SASHWAT PHASE 1.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 SEPT 24.pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - MARCH 24 - PHASE 1_11zon.pdf5 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - JUNE 24 - PHASE 1_11zon.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - MARCH 24 - SASHWAT PHASE 1.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - JUNE 24 - SASHWAT PHASE 1.pdf5 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SIGNED-SEPT 24.pdf5 Nov 2024
Disclosure of sold/ booked inventoryFile: DISCLOSURE FOR SOLD UNSOLF SASHWAT PHASE 1.pdf5 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A- FY 23-24- SASHWAT PHASE 1.pdf5 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 SASHWAT PHASE 1 MARCH 2024.pdf5 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SASHWAT PHASE 1 FORM 1 SEPT 23.pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SASHWAT PHASE-1 FORM 1 DEC 23.pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Sashwat Home PHASE 1 SEPT23.pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SASHWAT PHASE 1 DEC 23.pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 2023 SASHWAT SEPT 23 PHASE 1_11zon.pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM SHAHWAT DEC 2023 PHASE 1_11zon.pdf3 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 july 23.pdf21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 PHASE 1 SASHWAT_2_11zon.pdf21 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A PHASE 1.pdf21 Aug 2023
Declaration about Commencement CertificateFile: FORMAT-D-28062023- DHEERAJ PHASE-1.pdf28 Jun 2023
Proforma of Agreement for saleFile: DRAFT AGREEMENT PHASE 1 05062023.pdf5 Jun 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT TO SALE PHASE 1 05062023.pdf5 Jun 2023
Other - TechnicalFile: LAYOUT WITH MARKING 05062023.pdf5 Jun 2023
Other - TechnicalFile: DECLARATION FOR PLOT AREA 05062023.pdf5 Jun 2023
Other - TechnicalFile: CC.pdf5 Jun 2023
Layout approvalFile: PLAN SHEET 1 LAYOIT_7_11zon.pdf11 May 2023
Building plan approvalFile: PLAN SHEET 2 PARKING_9_11zon.pdf11 May 2023
Building plan approvalFile: PLAN SHEET 3 BUIDING 1_4_11zon.pdf11 May 2023
Building plan approvalFile: PLAN SHEET 5 BUILDING 2 PLAN_3_11zon.pdf11 May 2023

How this compares with Thane

100%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 24 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DHEERAJ HEIGHTS-PHASE-1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHIWANDI7,600+ in Thane

Builder: SASHWAT HOME

SASHWAT HOME has 2 registrations on MahaRERA, including DHEERAJ HEIGHTS-PHASE-1 and DHEERAJ HEIGHTS- PHASE-II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DHEERAJ HEIGHTS-PHASE-1 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DHEERAJ HEIGHTS-PHASE-1?

The registered promoter entity is SASHWAT HOME, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DHEERAJ HEIGHTS-PHASE-1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DHEERAJ HEIGHTS-PHASE-1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DHEERAJ HEIGHTS-PHASE-1?

The professionals named in the filing: Architect: SHRADDHA PRANJAPE; Engineer: NEELESH D DABHOLKAR; Chartered Accountant: MUKESH S SONI; Chartered Accountant: NITIN BALAJI DHAVAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DHEERAJ HEIGHTS-PHASE-1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DHEERAJ HEIGHTS-PHASE-1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DHEERAJ HEIGHTS-PHASE-1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.