Home / Browse projects / Thane, Maharashtra / Dharmavihar C Wing
Dharmavihar C Wing
RG-MH-99251 · RERA P51700019748 · Last updated on MahaRERA portal: 24 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 15 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Dharmavihar C Wing is a Residential / Group Housing project by MKY Infrastructure in Thane, Maharashtra, registered with MahaRERA as P51700019748 on 5 Mar 2019. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 96 of the 134 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameDharmavihar C Wing
- TypeResidential / Group Housing
- Location
- BHIWANDI
- Bhiwandi (M Corp.)
- Thane
- 421302
- Pincode421302
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700019748
- ReraGenie IDRG-MH-99251
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Mar 2019
- Promised completion31 Mar 2027
- Revised completionRevised to 31 Mar 2027 (originally 30 Dec 2025)
- Buildings1 building record
- Documents filed79 files
Current status
Figures as on 24 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DHARMA VIHAR C WING | NA | 19 | 17 | 134 | 0 | 134 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
DHARMA VIHAR C WING: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed19
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DHARMA VIHAR C WING | NA | Rs 30.65 cr | Rs 30.65 cr |
| - | NA | Rs 2.27 cr | Rs 2.27 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | K K AND ASSOCIATES |
| Engineer | KK ASSOCIATES |
| Chartered Accountant | ANKIT PIPARA AND COMPANY |
| Chartered Accountant | atul kumar gokhru |
| Chartered Accountant | NB Sayed & Associates |
| Partner | Role in project |
|---|---|
| MKY Infrastructure | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. Impact of the COVID-19 Pandemic The project commenced prior to the outbreak of the COVID-19 pandemic. However, from March 2020 to February 2022, construction activities were severely affected due to nationwide lockdowns, movement restrictions, and mandatory safety protocols. The pandemic caused widespread disruption in the availability of skilled and unskilled labour, as well as in the supply chain for construction materials and equipment. These constraints resulted in prolonged inactivity and slow progress on site. Despite these unprecedented conditions, continuous efforts were made to sus
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12500259 | ATUL BALENDRA TIWARI | MKY Infrastructure | 24/01/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Feb 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 18 Feb 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Feb 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Dharmavihar C Wing as on June 2026.pdf | 24 Jul 2026 |
| Withdrawal Update Form 2File: Dharmavihar_C_Wing_Form2_Q1_2026-27_15-07-2026_12-30.pdf | 24 Jul 2026 |
| Withdrawal Update Form 3File: Dharmavihar_C_Wing_Form3_Q1_2026-27_24-07-2026_12-12_doc1.pdf | 24 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 - Dharmavihar C Wing as on March 2026.pdf | 27 May 2026 |
| Withdrawal Update Form 2File: Form 2 - Dharmavihar C Wing as on March 2026.pdf | 27 May 2026 |
| Withdrawal Update Form 3File: Form 3 - Dharmvihar C Wing as on March 2026.pdf | 27 May 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - Dharmavihar C Wing as on 2025-26.pdf | 27 May 2026 |
| Form 2A (FY 2024-2025)File: 2A 24-25.pdf | 24 Mar 2026 |
| Form 5 (FY 2024-2025)File: Form 5 24-25.pdf | 24 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 - Dharmavihar C Wing as on Dec 2025.pdf | 14 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 - Dharmavihar C Wing as on Dec 2025.pdf | 14 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 - Dharmvihar C Wing as on Dec 2025.pdf | 14 Feb 2026 |
| Form 1File: Form 1 - Dharmavihar C Wing as on June 2025.pdf | 23 Dec 2025 |
| Form 2File: Form 2 - Dharmavihar C Wing as on June 2025.pdf | 23 Dec 2025 |
| Form 3File: Form 3 - Dharmavihar C Wing as on June 2025.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Dharmavihar C Wing as on June 2025.pdf | 23 Dec 2025 |
| Form 1File: Form 1 - Dharmavihar C Wing as on Sep 2025.pdf | 23 Dec 2025 |
| Form 2File: Form 2 - Dharmavihar C Wing as on Sep 2025.pdf | 23 Dec 2025 |
| Form 3File: Form 3 - Dharmavihar C Wing as on Sep 2025.pdf | 23 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Dharmavihar C Wing as on Sep 2025.pdf | 23 Dec 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 14 Jul 2025 |
| CERSAI detailsFile: CERSAI.pdf | 14 Jul 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE ADP.pdf | 14 Jul 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A-GHANSHYAMBHAI N PATEL.pdf | 14 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY CERTIFICATE FY2022-23.pdf | 14 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERTIFICATE FT2023-24.pdf | 14 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH 06-01-2025.pdf | 11 Jul 2025 |
| Certificates of CA (Form 3)File: Form3MKYDec2024.pdf | 11 Jul 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 06-01-2025.pdf | 11 Jul 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTCERTIFICATE30 JUNE 2022.pdf | 9 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE30JUNE2022.pdf | 9 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf | 9 Dec 2022 |
| Certificates of CA (Form 3)File: mky rera 310322_compressed.pdf | 9 Dec 2022 |
| Certificates of CA (Form 3)File: mky rera 3006_compressed.pdf | 9 Dec 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: mky infra form 5.pdf | 9 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTCERTIFICATE.pdf | 7 Dec 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf | 7 Dec 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSORANCE CERTIFICATE.pdf | 7 Dec 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf | 5 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf | 5 Mar 2022 |
| Certificates of CA (Form 3)File: form 3 rera certificTe_compressed.pdf | 5 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CCREVISED17thfloor.pdf | 25 Feb 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE JUNE 2021_compressed.pdf | 25 Feb 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE JUNE 2021_compressed.pdf | 25 Feb 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE DATED31032021.pdf | 29 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_3012_compressed.pdf | 29 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_30092020_compressed.pdf | 29 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1306_compressed.pdf | 29 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE DATED 31032021.pdf | 29 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_3012_compressed.pdf | 29 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_3092020_compressed.pdf | 29 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_3006_compressed.pdf | 29 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Spld Inventoru C Wing.pdf | 29 Sep 2021 |
| Certificates of CA (Form 3)File: Rera 1 MKY_compressed.pdf | 29 Sep 2021 |
| Certificates of CA (Form 3)File: Rera 2 MKY_compressed.pdf | 29 Sep 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: mky rera 2021 final form 5.pdf | 29 Sep 2021 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf | 31 Aug 2021 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf | 6 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate as on 30th March 2021_compressed.pdf | 6 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: NO Project.pdf | 6 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf | 6 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Adobe Scan 6 Aug 2021.pdf | 6 Aug 2021 |
| Form 2AFile: Form 2A pressed.pdf | 1 Aug 2019 |
| Certificates of CA (Form 3)File: MKY Rera Certificate Form 3.pdf | 19 Feb 2019 |
| Building plan approvalFile: ilovepdf_jpg_to_pdf (7).pdf | 18 Feb 2019 |
| Layout approvalFile: MYSCAN_20190207_0004 (1)-ilovepdf-compressed (1)-ilovepdf-compressed.pdf | 18 Feb 2019 |
| Layout approvalFile: MYSCAN_20190207_0004 (1)-ilovepdf-compressed (1).pdf | 18 Feb 2019 |
| PAN CardFile: PN CARD.pdf | 18 Feb 2019 |
| Copy of the legal title reportFile: Title Reprot (1).pdf | 18 Feb 2019 |
| Details of encumbrancesFile: MKY Infrastructure.pdf | 18 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20190207_0004 (1)-ilovepdf-compressed (1)-ilovepdf-compressed.pdf | 18 Feb 2019 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20190207_0004 (1)-ilovepdf-compressed (1).pdf | 18 Feb 2019 |
| Building Plan Approval (IOD)File: ilovepdf_jpg_to_pdf (7).pdf | 18 Feb 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CC C Wing-ilovepdf-compressed-ilovepdf-compressed.pdf | 18 Feb 2019 |
| Declaration in FORM BFile: ilovepdf_merged (4)-ilovepdf-compressed-ilovepdf-compressed.pdf | 18 Feb 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arc.pdf | 18 Feb 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ilovepdf_jpg_to_pdf (6).pdf | 18 Feb 2019 |
| Proforma of Allotment letterFile: Allotment Letter.pdf | 18 Feb 2019 |
| Proforma of Allotment letterFile: AGREEMENT DRAFT (1).pdf | 18 Feb 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MOUNT VIEW | MOUNT VIEW KOSWAD VILLAGE | 113 | Completed | Mar 2017 | Mar 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Dharmavihar C Wing on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHIWANDI7,600+ in Thane
Filed coordinates, straight-line distance. 88 registered projects within 2 km.
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: MKY Infrastructure
MKY Infrastructure has 2 registrations on MahaRERA, including DHARMAVIHAR and Dharmavihar C Wing. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Dharmavihar C Wing is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Dharmavihar C Wing?
The registered promoter entity is MKY Infrastructure, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Dharmavihar C Wing?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Dharmavihar C Wing?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Dharmavihar C Wing?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Dharmavihar C Wing?
The professionals named in the filing: Architect: K K AND ASSOCIATES; Engineer: KK ASSOCIATES; Chartered Accountant: ANKIT PIPARA AND COMPANY; Chartered Accountant: atul kumar gokhru; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Dharmavihar C Wing?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback