Home / Browse projects / Thane, Maharashtra / Dharmavihar C Wing

Registered No litigation declared Residential / Group Housing project

Dharmavihar C Wing

By MKY Infrastructure

RG-MH-99251 · RERA P51700019748 · Last updated on MahaRERA portal: 24 Jul 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 15 months from the original
9 of 11Construction stages donefurthest along: Basement (if any), 0%
38 of 134Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Dharmavihar C Wing is a Residential / Group Housing project by MKY Infrastructure in Thane, Maharashtra, registered with MahaRERA as P51700019748 on 5 Mar 2019. Possession is promised by 31 Mar 2027. The completion date has moved by 15 months from the original filing. 96 of the 134 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameDharmavihar C Wing
  • TypeResidential / Group Housing
  • Location
    • BHIWANDI
    • Bhiwandi (M Corp.)
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700019748
  • ReraGenie IDRG-MH-99251

Builder

  • NameMKY Infrastructure
  • Entity typePartnership
  • PartnerDarwin Parshottam Patel
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2019First promiseDec 2025Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Mar 2019
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Dec 2025)
  • Buildings1 building record
  • Documents filed79 files

Current status

72%96 of 134 units booked
100.0%Work done, per cost certificate

Figures as on 24 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DHARMA VIHAR C WINGNA19171340134

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

DHARMA VIHAR C WING: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered1
Open Space18

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,008 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityBhiwandi Nizampur Mahanagarpalika
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMUMBAI
Estimated costRs 32.92 cr
Cost incurredRs 32.92 cr
Work done100.0%
BuildingWingEstimatedIncurred
DHARMA VIHAR C WINGNARs 30.65 crRs 30.65 cr
-NARs 2.27 crRs 2.27 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectK K AND ASSOCIATES
EngineerKK ASSOCIATES
Chartered AccountantANKIT PIPARA AND COMPANY
Chartered Accountantatul kumar gokhru
Chartered AccountantNB Sayed & Associates
PartnerRole in project
MKY Infrastructure-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28022620048Dec 2025 → Mar 2027

Reason as filed by the promoter1. Impact of the COVID-19 Pandemic The project commenced prior to the outbreak of the COVID-19 pandemic. However, from March 2020 to February 2022, construction activities were severely affected due to nationwide lockdowns, movement restrictions, and mandatory safety protocols. The pandemic caused widespread disruption in the availability of skilled and unskilled labour, as well as in the supply chain for construction materials and equipment. These constraints resulted in prolonged inactivity and slow progress on site. Despite these unprecedented conditions, continuous efforts were made to sus

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12500259ATUL BALENDRA TIWARIMKY Infrastructure24/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Feb 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Feb 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Feb 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Dharmavihar C Wing as on June 2026.pdf24 Jul 2026
Withdrawal Update Form 2File: Dharmavihar_C_Wing_Form2_Q1_2026-27_15-07-2026_12-30.pdf24 Jul 2026
Withdrawal Update Form 3File: Dharmavihar_C_Wing_Form3_Q1_2026-27_24-07-2026_12-12_doc1.pdf24 Jul 2026
Withdrawal Update Form 1File: Form 1 - Dharmavihar C Wing as on March 2026.pdf27 May 2026
Withdrawal Update Form 2File: Form 2 - Dharmavihar C Wing as on March 2026.pdf27 May 2026
Withdrawal Update Form 3File: Form 3 - Dharmvihar C Wing as on March 2026.pdf27 May 2026
Form 2A (FY 2025-2026)File: Form 2A - Dharmavihar C Wing as on 2025-26.pdf27 May 2026
Form 2A (FY 2024-2025)File: 2A 24-25.pdf24 Mar 2026
Form 5 (FY 2024-2025)File: Form 5 24-25.pdf24 Mar 2026
Withdrawal Update Form 1File: Form 1 - Dharmavihar C Wing as on Dec 2025.pdf14 Feb 2026
Withdrawal Update Form 2File: Form 2 - Dharmavihar C Wing as on Dec 2025.pdf14 Feb 2026
Withdrawal Update Form 3File: Form 3 - Dharmvihar C Wing as on Dec 2025.pdf14 Feb 2026
Form 1File: Form 1 - Dharmavihar C Wing as on June 2025.pdf23 Dec 2025
Form 2File: Form 2 - Dharmavihar C Wing as on June 2025.pdf23 Dec 2025
Form 3File: Form 3 - Dharmavihar C Wing as on June 2025.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Dharmavihar C Wing as on June 2025.pdf23 Dec 2025
Form 1File: Form 1 - Dharmavihar C Wing as on Sep 2025.pdf23 Dec 2025
Form 2File: Form 2 - Dharmavihar C Wing as on Sep 2025.pdf23 Dec 2025
Form 3File: Form 3 - Dharmavihar C Wing as on Sep 2025.pdf23 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Dharmavihar C Wing as on Sep 2025.pdf23 Dec 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf14 Jul 2025
CERSAI detailsFile: CERSAI.pdf14 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE ADP.pdf14 Jul 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A-GHANSHYAMBHAI N PATEL.pdf14 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY CERTIFICATE FY2022-23.pdf14 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERTIFICATE FT2023-24.pdf14 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH 06-01-2025.pdf11 Jul 2025
Certificates of CA (Form 3)File: Form3MKYDec2024.pdf11 Jul 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG 06-01-2025.pdf11 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTCERTIFICATE30 JUNE 2022.pdf9 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE30JUNE2022.pdf9 Dec 2022
Disclosure of sold/ booked inventoryFile: Booked Inventory.pdf9 Dec 2022
Certificates of CA (Form 3)File: mky rera 310322_compressed.pdf9 Dec 2022
Certificates of CA (Form 3)File: mky rera 3006_compressed.pdf9 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: mky infra form 5.pdf9 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECTCERTIFICATE.pdf7 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf7 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSORANCE CERTIFICATE.pdf7 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf5 Mar 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE.pdf5 Mar 2022
Certificates of CA (Form 3)File: form 3 rera certificTe_compressed.pdf5 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: CCREVISED17thfloor.pdf25 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE JUNE 2021_compressed.pdf25 Feb 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEERS CERTIFICATE JUNE 2021_compressed.pdf25 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE DATED31032021.pdf29 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_3012_compressed.pdf29 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1_30092020_compressed.pdf29 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1306_compressed.pdf29 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE DATED 31032021.pdf29 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_3012_compressed.pdf29 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_3092020_compressed.pdf29 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2_3006_compressed.pdf29 Sep 2021
Disclosure of sold/ booked inventoryFile: Spld Inventoru C Wing.pdf29 Sep 2021
Certificates of CA (Form 3)File: Rera 1 MKY_compressed.pdf29 Sep 2021
Certificates of CA (Form 3)File: Rera 2 MKY_compressed.pdf29 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: mky rera 2021 final form 5.pdf29 Sep 2021
Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf31 Aug 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMNT CERTIFICATE.pdf6 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate as on 30th March 2021_compressed.pdf6 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: NO Project.pdf6 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5.pdf6 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Adobe Scan 6 Aug 2021.pdf6 Aug 2021
Form 2AFile: Form 2A pressed.pdf1 Aug 2019
Certificates of CA (Form 3)File: MKY Rera Certificate Form 3.pdf19 Feb 2019
Building plan approvalFile: ilovepdf_jpg_to_pdf (7).pdf18 Feb 2019
Layout approvalFile: MYSCAN_20190207_0004 (1)-ilovepdf-compressed (1)-ilovepdf-compressed.pdf18 Feb 2019
Layout approvalFile: MYSCAN_20190207_0004 (1)-ilovepdf-compressed (1).pdf18 Feb 2019
PAN CardFile: PN CARD.pdf18 Feb 2019
Copy of the legal title reportFile: Title Reprot (1).pdf18 Feb 2019
Details of encumbrancesFile: MKY Infrastructure.pdf18 Feb 2019
Copy of Layout Approval (in case of layout)File: MYSCAN_20190207_0004 (1)-ilovepdf-compressed (1)-ilovepdf-compressed.pdf18 Feb 2019
Copy of Layout Approval (in case of layout)File: MYSCAN_20190207_0004 (1)-ilovepdf-compressed (1).pdf18 Feb 2019
Building Plan Approval (IOD)File: ilovepdf_jpg_to_pdf (7).pdf18 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: CC C Wing-ilovepdf-compressed-ilovepdf-compressed.pdf18 Feb 2019
Declaration in FORM BFile: ilovepdf_merged (4)-ilovepdf-compressed-ilovepdf-compressed.pdf18 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arc.pdf18 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ilovepdf_jpg_to_pdf (6).pdf18 Feb 2019
Proforma of Allotment letterFile: Allotment Letter.pdf18 Feb 2019
Proforma of Allotment letterFile: AGREEMENT DRAFT (1).pdf18 Feb 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
MOUNT VIEWMOUNT VIEW KOSWAD VILLAGE113CompletedMar 2017Mar 2017

How this compares with Thane

72%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 15 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Dharmavihar C Wing on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHIWANDI7,600+ in Thane

2 kmDharmavihar C WingCompleted 29Lapsed / revoked 24Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 88 registered projects within 2 km.

Builder: MKY Infrastructure

MKY Infrastructure has 2 registrations on MahaRERA, including DHARMAVIHAR and Dharmavihar C Wing. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Dharmavihar C Wing is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dharmavihar C Wing?

The registered promoter entity is MKY Infrastructure, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dharmavihar C Wing?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Dharmavihar C Wing?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Dharmavihar C Wing?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dharmavihar C Wing?

The professionals named in the filing: Architect: K K AND ASSOCIATES; Engineer: KK ASSOCIATES; Chartered Accountant: ANKIT PIPARA AND COMPANY; Chartered Accountant: atul kumar gokhru; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dharmavihar C Wing?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dharmavihar C Wing. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dharmavihar C Wing to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.