DHANASHREE SVASTI
RG-MH-31670 · RERA P53000080005 · Last updated on MahaRERA portal: 18 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 3 completed earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DHANASHREE SVASTI is a Others project by BEDEKAR LIFESPACES LLP in Kolhapur, Maharashtra, registered with MahaRERA as P53000080005 on 17 Apr 2025. Possession is promised by 31 Dec 2028. 12 of the 43 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.
At a glance
Project
- NameDHANASHREE SVASTI
- TypeOthers
- Location
- CIRCUIT HOUSE ROAD
- E WARD
- TARABAI PARK
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416003
- Pincode416003
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000080005
- ReraGenie IDRG-MH-31670
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Apr 2025
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings3 building records
- Documents filed47 files
Current status
Figures as on 18 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BUILDING B | NA | 8 | 7 | 18 | 0 | 18 |
| BUILDING C | NA | 9 | 7 | 0 | 14 | 14 |
| BUILDING A | NA | 8 | 7 | 10 | 1 | 11 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 60%.
BUILDING B43%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING C42%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
BUILDING A42%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 20% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed84
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| BUILDING B | 41 | 41 |
| BUILDING C | 13 | 13 |
| BUILDING A | 30 | 30 |
Land and ownership18
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Anil Bapurao Kurane | Kolhapur (M Corp.) | Kolhapur |
| Vasant Narayan Mutalik and Other 1 | Kolhapur (M Corp.) | Kolhapur |
| Kishor Apparao Jadhav | Kolhapur (M Corp.) | Kolhapur |
| Mahesh Gopalkrishna Kashid | Kolhapur (M Corp.) | Kolhapur |
| Rajeev Madhukar Jajal | Kolhapur (M Corp.) | Kolhapur |
| Geetanjali Tatyasaheb Londhe | Kolhapur (M Corp.) | Kolhapur |
| Sunita Yashwant Deval | Kolhapur (M Corp.) | Kolhapur |
| Uttamrao Naryanrao Patil and Other 1 | Kolhapur (M Corp.) | Kolhapur |
| Major Milind DeodattaTungar | Kolhapur (M Corp.) | Kolhapur |
| Bahirji Baburao Londhe | Kolhapur (M Corp.) | Kolhapur |
| Seema Avinash Sawant and Other 2 | Kolhapur (M Corp.) | Kolhapur |
| Arun Balkrishna Kulkarni | Kolhapur (M Corp.) | Kolhapur |
| Gopichand Bilandrai Lalwani | Kolhapur (M Corp.) | Kolhapur |
| Savita Manikrao Pote | Kolhapur (M Corp.) | Kolhapur |
| Uma Ravindra Naik Satam and Other 2 | Kolhapur (M Corp.) | Kolhapur |
| Dilip Ganpatrao Shinde | Kolhapur (M Corp.) | Kolhapur |
| Niranjan Bhaskar Sohoni and Other 1 | Kolhapur (M Corp.) | Kolhapur |
| Avinash Tukaram Latke | Kolhapur (M Corp.) | Kolhapur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BUILDING A | NA | Rs 23.50 cr | Rs 5.00 cr |
| - | NA | Rs 1.50 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Sahas Patil |
| Engineer | Sunil Desai |
| Engineer | Sandeep Borchate |
| Engineer | Vidyanand Bedekar |
| Chartered Accountant | Nitish Shivprasad Vandure Patil |
| Partner | Role in project |
|---|---|
| BEDEKAR LIFESPACES LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 3 Apr 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed47
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: SVASTI FORM 1 Q4FY2025-26 - SIGNED.pdf | 18 May 2026 |
| Withdrawal Update Form 2File: SVASTI FORM 2 Q4FY2025-26 SIGNED.pdf | 18 May 2026 |
| Withdrawal Update Form 3File: SVASTI FORM 3 Q4FY2025-26 SIGNED.pdf | 18 May 2026 |
| Withdrawal Update Form 1File: SVASTI FORM 1 Q3FY2025-26.pdf | 29 Mar 2026 |
| Withdrawal Update Form 1File: SVASTI FORM 1 Q3FY2025-26.pdf | 29 Mar 2026 |
| Withdrawal Update Form 1File: SVASTI FORM 1 Q3FY2025-26.pdf | 29 Mar 2026 |
| Withdrawal Update Form 2File: SVASTI FORM 2 Q3FY2025-26.pdf | 29 Mar 2026 |
| Withdrawal Update Form 2File: SVASTI FORM 2 Q3FY2025-26.pdf | 29 Mar 2026 |
| Withdrawal Update Form 2File: SVASTI FORM 2 Q3FY2025-26.pdf | 29 Mar 2026 |
| Withdrawal Update Form 3File: SVASTI FORM 3_.pdf | 29 Mar 2026 |
| Withdrawal Update Form 3File: SVASTI FORM 3_.pdf | 29 Mar 2026 |
| Withdrawal Update Form 3File: SVASTI FORM 3 Q3FY2025-26_.pdf | 29 Mar 2026 |
| Copy of the legal title reportFile: Search Report Format 03042025.pdf | 3 Apr 2025 |
| Copy of the legal title reportFile: Search Report Detailed_.pdf | 3 Apr 2025 |
| Proforma of Allotment letterFile: Allottment Letter - SVASTI.pdf | 3 Apr 2025 |
| Declaration about Commencement CertificateFile: Declaration Comm Cert SVASTI 02042025.pdf | 3 Apr 2025 |
| Other - TechnicalFile: KMC Application for Email.pdf | 3 Apr 2025 |
| Other - TechnicalFile: Proposed Floors Dhanshree SVASTI_.pdf | 3 Apr 2025 |
| Proforma of Agreement for saleFile: Agreement for Sale Draft SVASTI.pdf | 3 Apr 2025 |
| CERSAI detailsFile: CERSAI Search Report SVASTI 02042025.pdf | 2 Apr 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Form B - DCB Bank Letter for RERA Account.pdf | 2 Apr 2025 |
| Other - LegalFile: Authority Letter.pdf | 26 Mar 2025 |
| Other - TechnicalFile: Annexure A - Declaration cum Undertaking.pdf | 26 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SVASTI FORM 3_.pdf | 25 Mar 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement - SVASTI_.pdf | 25 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrances Concerned to Finance -SVASTI.pdf | 24 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Encumbrances Concerned to Legal - SVASTI.pdf | 24 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SVASTI FORM 1.pdf | 24 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SVASTI FORM 2.pdf | 24 Mar 2025 |
| Other - LegalFile: Declaration Regarding Allocation of Units.pdf | 24 Mar 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Form A Declaration - RERA Account SVASTI.pdf | 24 Mar 2025 |
| Deviation Report with respect to Allotment letterFile: No Deviation Report - Allotment Letter - SVASTI.pdf | 24 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrances Concerned to Finance -SVASTI.pdf | 24 Mar 2025 |
| Details of encumbrances concerned to LegalFile: Encumbrances Concerned to Legal - SVASTI.pdf | 24 Mar 2025 |
| Other - FinanceFile: Declaration Regarding Allocation of Units.pdf | 24 Mar 2025 |
| Other - FinanceFile: Landowner_Declaration -B1.pdf | 24 Mar 2025 |
| Other - FinanceFile: Landowner_Declaration B2.pdf | 24 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure related to Bank Finance.pdf | 24 Mar 2025 |
| Layout approvalFile: Mojani Map.pdf | 11 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Mojani Map.pdf | 11 Mar 2025 |
| Declaration in FORM BFile: Form B Promoter.pdf | 11 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of Interest AB.pdf | 11 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of Interest VB.pdf | 11 Mar 2025 |
| Building plan approvalFile: Dhanashree SVASTI revised Sanction plans.pdf | 7 Mar 2025 |
| PAN CardFile: Bedekar Lifespaces PAN.pdf | 7 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Dhanashree SVASTI revised CC.pdf | 7 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Dhanashree SVASTI revised Sanction plans.pdf | 7 Mar 2025 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| EVANTHAP53000054599 | BEHIND ASTER ADHAR HOSPITAL, Kolhapur | 14 | Jan 2024 | Ongoing | Dec 2027 | Not due yet |
| ARAVALIP53000034228 | PACHGAON, Kolhapur | 37 | Mar 2022 | Completed | Mar 2026 | Oct 2025 |
| BEEZHIVEP53000029433 | E WARD, SHAHUPURI, Kolhapur | 106 | May 2021 | Completed | Dec 2025 | Dec 2025 |
| NOVO Satyashree | C.S.No. 517A/1, Plot No. 40, Shaahji Ganj, Shivaji Park, Kolhapur | 6 | - | Completed | Sep 2023 | Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 47 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DHANASHREE SVASTI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near E WARD, TARABAI PARK880+ in Kolhapur
Filed coordinates, straight-line distance. 146 registered projects within 2 km.
24 KEYWEST EAST AND WEST AVENUE
KEYWEST INFRA
Loknagari Karande Mala
VIKESH ABHAYKUMAR OSWAL
KRYSTAL TOWERS
RAYSONS CONSTRUCTIONS
GAYATRI-BHAWANI APARTMENT
Vijaykumar Vasudev Patki
EMINENT VISION TOWER
ACE DEVELOPERS
THE PARKSIDE
DESHPANDE INFRA
See every Kolhapur project, with the district possession charts
Builder: BEDEKAR LIFESPACES LLP
BEDEKAR LIFESPACES LLP has 4 registrations on MahaRERA, including BEEZHIVE and ARAVALI. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What are my rights if DHANASHREE SVASTI is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DHANASHREE SVASTI?
The registered promoter entity is BEDEKAR LIFESPACES LLP, a limited liability partnership as per the filing. Its LLPIN AAR-4492 and GSTIN 27AAVFB8074A1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DHANASHREE SVASTI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DHANASHREE SVASTI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DHANASHREE SVASTI?
The professionals named in the filing: Architect: Sahas Patil; Engineer: Sunil Desai; Engineer: Sandeep Borchate; Engineer: Vidyanand Bedekar; Chartered Accountant: Nitish Shivprasad Vandure Patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DHANASHREE SVASTI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback