DHANASHREE APARTMENT
By SHREE EKVIRA DEVELOPERS LLP
RG-MH-28137 · RERA P52000026541 · Last updated on MahaRERA portal: 19 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 46 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DHANASHREE APARTMENT is a Residential / Group Housing project by SHREE EKVIRA DEVELOPERS LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000026541 on 2 Oct 2020. Possession is promised by 30 Apr 2028. The completion date has moved by 46 months from the original filing. 0 of the 83 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.
At a glance
Project
- NameDHANASHREE APARTMENT
- TypeResidential / Group Housing
- Location
- Plot No 33 Sector 52
- Dronagiri
- Dongari
- Uran
- Raigarh
- 400702
- Pincode400702
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000026541
- ReraGenie IDRG-MH-28137
Builder
- NameSHREE EKVIRA DEVELOPERS LLP
- Entity typePartnership
- PartnersOMKAR RAJENDRA SHINDE, RAJENDRA BHASKAR SHINDE, ARCHANA GANESH SHINDE
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on2 Oct 2020
- Promised completion30 Apr 2028
- Revised completionRevised to 30 Apr 2028 (originally 30 Jun 2024)
- Buildings1 building record
- Documents filed84 files
Current status
Figures as on 19 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DHANASHREE APARTMENT | NA | 8 | 8 | 83 | 0 | 83 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
DHANASHREE APARTMENT: 9% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 19 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed24
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| DHANASHREE APARTMENT | NA | Rs 8.50 cr | Rs 2.12 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATUL PATEL ARCHITECTS |
| Engineer | IMPACT DESIGNERR |
| Engineer | B.S. SUKHTANKAR & ASSOCIATES |
| Engineer | SHAHAJI TANPURE |
| Chartered Accountant | S V TAWADE & ASSOCIATES |
| Chartered Accountant | MANISH RAMAVATI AND COMPANY |
| Partner | Role in project |
|---|---|
| SHREE EKVIRA DEVELOPERS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe delay in the completion of the project “DHANASHREE APARTMENT” is primarily due to unforeseen changes in the regulatory and development framework, which impacted our project timeline significantly. Increase in Permissible FSI: The permissible Floor Space Index (FSI) for our project location was revised, allowing for greater development potential. This necessitated a complete redesign of the architectural and structural plans to optimize the revised FSI while ensuring compliance with all applicable building regulations and planning norms. Revision and Approval of Plans: Post revision, the up
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 29 Feb 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Feb 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 29 Feb 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2028
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 - MARCH 2026.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: FORM 1 - MARCH 2026.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: FORM 1 Sept 25.pdf | 19 May 2026 |
| Withdrawal Update Form 1File: FORM 1 Dec 25.pdf | 19 May 2026 |
| Withdrawal Update Form 2File: FORM 2 - MARCH 2026.pdf | 19 May 2026 |
| Withdrawal Update Form 2File: FORM 2 - MARCH 2026.pdf | 19 May 2026 |
| Withdrawal Update Form 2File: FORM 2 Sept 25.pdf | 19 May 2026 |
| Withdrawal Update Form 2File: FORM 2 Dec 25.pdf | 19 May 2026 |
| Withdrawal Update Form 3File: FORM 3 - MARCH 2026.pdf | 19 May 2026 |
| Withdrawal Update Form 3File: FORM 3 - MARCH 2026.pdf | 19 May 2026 |
| Withdrawal Update Form 3File: FORM 3 Sept 25.pdf | 19 May 2026 |
| Withdrawal Update Form 3File: FORM 3 Dec 25.pdf | 19 May 2026 |
| Form 2A (FY 2024-2025)File: Form 2A - 2024 - 25.pdf | 30 Dec 2025 |
| Withdrawal Update Form 1File: FORM 1 final.pdf | 11 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2 final.pdf | 11 Sep 2025 |
| Withdrawal Update Form 3File: form3- 30-06-2025.pdf | 11 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1 (2).pdf | 1 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2 DHANSHREE APARTMENT P52000026541 14_08_2025.pdf | 1 Sep 2025 |
| Withdrawal Update Form 3File: FORM 3 jUNE 2025.pdf | 1 Sep 2025 |
| Withdrawal Update Form 1File: Form 1 Architect’s Certificat March 22.pdf | 29 Aug 2025 |
| Withdrawal Update Form 2File: FORM 2 DHANSHREE APARTMENT P52000026541 14_08_2025.pdf | 29 Aug 2025 |
| Withdrawal Update Form 3File: FORM 3 jUNE 2025.pdf | 29 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 - Jun 22.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - Mar 22.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 Form 1 - Mar 25.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 Form 1 - Dec 24.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Form 1 - Sep 24.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form 1 - Jun 24.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1 - Mar 24.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Form 1 - Dec 23.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Form 1 - Sep 23.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Form 1 - Jun 23.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 - Mar 23.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 - Dec 22.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 - Sep 22.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 Form 3 - Dec 24.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 Form 3 - Sep 24.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 Form 3 - Jun 24.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 Form 3 - Mar 24.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 - Jun 23.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Form 3 - Dec 23.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 Form 3 - Sep 23.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 - Mar 23.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - Dec 22.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 - Sep 22.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form 3 - Jun 22_compressed.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Form 2 - Jun 22.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Sep 22.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 - Dec 22.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 - Mar 23.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 - Jun 23.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form 2 - Sep 23.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form 2 - Dec 23.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Form 2 - Mar 24.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Form 2 - Jun 24.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 - Sep 24.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 2 - Dec 24.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect’s Certificat March 22.pdf | 31 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 21.pdf | 25 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 21.pdf | 25 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 22.pdf | 25 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Signed Form 5 March 21.pdf | 25 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Signed Form 5 March 22.pdf | 25 Mar 2023 |
| Declaration in FORM BFile: formB28092020c1.pdf | 28 Sep 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Certificate_EkviraEnclavePG1.pdf | 4 Sep 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_Certificate_EkviraEnclaveP2.pdf | 4 Sep 2020 |
| Proforma of Allotment letterFile: AGREEMENT FOR SALE EKVEERA.pdf | 4 Sep 2020 |
| Layout approvalFile: Self Declaration layout plan.pdf | 29 Feb 2020 |
| Building plan approvalFile: Approved CC Plan-1.pdf | 29 Feb 2020 |
| Building plan approvalFile: Approved CC Plan-3.pdf | 29 Feb 2020 |
| Building plan approvalFile: page2_n.pdf | 29 Feb 2020 |
| PAN CardFile: Company Pan Card SEDL.pdf | 29 Feb 2020 |
| PAN CardFile: Pan Card Ganesh Shinde.pdf | 29 Feb 2020 |
| PAN CardFile: RAJENDRA SHINDEPAN CARD.pdf | 29 Feb 2020 |
| PAN CardFile: Pan Card Omkar Shinde.pdf | 29 Feb 2020 |
| PAN CardFile: Pan Card Archana Shinde.pdf | 29 Feb 2020 |
| Copy of the legal title reportFile: Title Report3352.pdf | 29 Feb 2020 |
| Details of encumbrancesFile: Self Declaration Legal encumbrances.pdf | 29 Feb 2020 |
| Copy of Layout Approval (in case of layout)File: Self Declaration layout plan.pdf | 29 Feb 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Approved CC Plan-1.pdf | 29 Feb 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep DHANASHREE APARTMENT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dronagiri5,900+ in Raigarh
Filed coordinates, straight-line distance. 119 registered projects within 2 km.
VILLA ONE
Khodiyar Realtech LLP
Gami Bianca
LAL GEBI INFRA PRIVATE LIMITED
MAHAAVIR LABDHI PHASE 1
MAHAAVIR BUILDCON LLP
Siddhivinayak- Anaya
DIVYADRISHTI BUILDCON PRIVATE LIMITED
Horizon Landmark
GREENSCAPE KALPANA STRUCT CON
Grand Uran Central
Tycoons Altofin Realty
See every Raigarh project, with the district possession charts
Builder: SHREE EKVIRA DEVELOPERS LLP
SHREE EKVIRA DEVELOPERS LLP has 1 registration on MahaRERA, including DHANASHREE APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if DHANASHREE APARTMENT is delayed beyond 30 Apr 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DHANASHREE APARTMENT?
The registered promoter entity is SHREE EKVIRA DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DHANASHREE APARTMENT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for DHANASHREE APARTMENT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DHANASHREE APARTMENT?
The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: IMPACT DESIGNERR; Engineer: B.S. SUKHTANKAR & ASSOCIATES; Engineer: SHAHAJI TANPURE; Chartered Accountant: S V TAWADE & ASSOCIATES; Chartered Accountant: MANISH RAMAVATI AND COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DHANASHREE APARTMENT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback