Home / Browse projects / Thane, Maharashtra / DGT - Sector 3A - Cluster 2 - Phase 3

Registered Litigation declared Residential / Group Housing project

DGT - Sector 3A - Cluster 2 - Phase 3

By ADRIKA DEVELOPERS PRIVATE LIMITED

RG-MH-49493 · RERA P51700048333 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • Rs 50.00 crore secured on the land, in favour of kotak mahindra invesments ltd

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Staircases, 39%
6 of 710Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 143 documents Report an error

DGT - Sector 3A - Cluster 2 - Phase 3 is a Residential / Group Housing project by ADRIKA DEVELOPERS PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700048333 on 26 Dec 2022. Possession is promised by 30 Jun 2028. 704 of the 710 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameDGT - Sector 3A - Cluster 2 - Phase 3
  • TypeResidential / Group Housing
  • Location
    • Shree Umiya Compound
    • Kalher Junction
    • Purne (CT)
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700048333
  • ReraGenie IDRG-MH-49493

Builder

  • NameADRIKA DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200MH2006PTC158714
  • GSTIN27AAFCA5418G1ZT
  • DirectorsDEEPAK KISHAN GORADIA, RAJESH PREMJI SHAH, RAJUL VRAJLAL VORA
  • Other registrations8 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredDec 2022PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Dec 2022
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed143 files

Current status

99%704 of 710 units booked
68.9%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dosti Grace - Wing A - Tower T4-5 and Wing B - Tower T4-6NA31307100710

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 39%.

Dosti Grace - Wing A - Tower T4-5 and Wing B - Tower T4-6: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises28%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks39%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed341

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots341
Closed/Covered229
Open Space112

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,031 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofkotak mahindra invesments ltd
Secured amountRs 50.00 crore
CERSAI search filedYes
Declared on29 May 2026

Approvals and building plan

Sanctioning authorityMMRDA
Permissible FSI53688.14
Proposed, not sanctioned46,165 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchFort , Mumbai
Estimated costRs 163.73 cr
Cost incurredRs 112.76 cr
Work done68.87%
BuildingWingEstimatedIncurred
Dosti Grace - Wing A - Tower T4-5 and Wing B - Tower T4-6NARs 153.73 crRs 108.02 cr
-NARs 10.00 crRs 4.74 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSpaceage Consultants
ArchitectNEERJA PURANDARE
ArchitectArchitect Kaustubh J Satam
ArchitectARCHITECT JAY R VORA
EngineerParas R Vishwakarma
EngineerSWAPNIL RAMESH LONDHE
EngineerVaibhav Raghunath Kalambate
Chartered AccountantManish Bardia & Co
Chartered AccountantBagade & Associates
PartnerRole in project
ADRIKA DEVELOPERS PRIVATE LIMITED-

Litigation declared6

CaseCourtStatus
444/2019Civil Judge Junior Division BhiwandiOngoing
119/2019Civil Judge Junior Division BhiwandiOngoing
63/2017SDO BhiwandiClosed
381/2010Civil Judge Junior Division BhiwandiOngoing
444/2019CIVIL JUDGE JUNIOR DIVISION BHIWANDIOngoing
01/2023Additional Collector, ThaneClosed

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed143

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 143 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A - DGT Cl 2 Ph 3.pdf22 Jun 2026
Withdrawal Update Form 1File: Adrika DGT Sec 3A Cluster 2 Ph 3 Form 1 Mar26.pdf2 May 2026
Withdrawal Update Form 2File: Adrika DGT Sec 3A Cluster 2 Ph 3 Form 2 Mar26.pdf2 May 2026
Withdrawal Update Form 3File: Adrika DGT Sec 3A Cluster 2 Ph 3 Form 3 Mar26_compressed (1).pdf2 May 2026
Withdrawal Update Form 1File: Adrika DGT Sec 3A Cluster 2 Ph 3 Grace Architect Certificate 1.pdf27 Jan 2026
Withdrawal Update Form 2File: Adrika DGT Sec 3A Cluster 2 Ph 3 Form 2 Dec25.pdf27 Jan 2026
Withdrawal Update Form 3File: Adrika DGT Sec 3A Cluster 2 Ph 3 Form 3 Dec25compressed.pdf27 Jan 2026
Withdrawal Update Form 1File: Adrika DGT Sec 3A Cluster 2 Ph 3 Form 1 Sept25.pdf29 Nov 2025
Withdrawal Update Form 2File: Adrika DGT Sec 3A Cluster 2 Ph 3 Form 2 Sept25.pdf29 Nov 2025
Withdrawal Update Form 3File: Adrika DGT Sec3A CL2, PH3 CA Certificate 1Oct 25.pdf29 Nov 2025
Form 5 (FY 2024-2025)File: Adrika DGT Sec3A CL2 PH3.pdf12 Nov 2025
Form 1File: DGT Sec 3A CL2 PH3 ARCH Certificate June2025.pdf25 Jul 2025
Form 2File: DGT Sec 3A CL2 PH3 ENGG Certificate June2025.pdf25 Jul 2025
Form 3File: DGT Sec 3A CL2 PH3 CA Certificate June2025.pdf25 Jul 2025
Disclosure of Sold and Booked InventoryFile: DGT SEC3A CL2 PH3 Sold Unsold June2025_compressed.pdf25 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DGT Sec 3A CL2 PH3 ARCH Certificate.pdf14 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DGT Sec 3A CL2 PH3 CA Certificate.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DGT Sec 3A CL2 PH3 Engg Certificate.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: ADPL DGT Sec 3A CL2 PH 3.pdf14 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: DGT Sec 3A CL2 PH3 Quality Certificate.pdf14 Apr 2025
Disclosure of sold/ booked inventoryFile: ADPL DGT Sector 3A Cl 2 Ph 2 Grace.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DGT Sec3A, CL2, PH3 Grace Form1 Dec2024.pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DGT Sec3A, CL2, PH3 Grace Form3 Dec2024.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DGT Sec3A, CL2, PH3 Grace Form2 Dec2024.pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: DGT Sec3A CL2 PH3.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DGT SEC3A CL2 PH3 Grace Form1 Sep24.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DGT Sec3A CL2 PH3 Grace Form3 Sep24.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DGT Sec3A CL2 PH3 Grace Form2 Se24.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DGT Sec 3A CL2 PH3.pdf7 Oct 2024
Disclosure of sold/ booked inventoryFile: 7-3 DGT SEC3A CL2 PH3 Grace.pdf9 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DGT SC3A CL2 PH3 Grace -Form1 Arch Cert June 2024.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DGT SC3A CL2 PH3 Grace -Form2 Engg Cert June 2024.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DGT SC3A CL2 PH3 Grace -Form2 Engg Cert June 2024.pdf22 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DGT SC3A CL2 PH3 Grace -Form3 CA Cert June 2024.pdf22 Jul 2024
Disclosure of sold/ booked inventoryFile: DGT SEC3A CL2 Phase-3 Grace.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 DGT Sector 3A Cluster 2 Phase3.pdf26 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DGT Dosti Grace Sec 3A Clu 2 Phase 3.pdf26 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: DGT SECTOR3A CLUSTER2 Phase3.pdf24 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DGT Sector 3A Cluster 2 Phase 3.pdf23 Apr 2024
Disclosure of sold/ booked inventoryFile: Dosti Grace A B.pdf5 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate DGT Sector 3A Cluster 2 -Ph-3-Grace A ,B.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate DGT Dosti Grace Sec 3A Clu 2 Phase 3.pdf17 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Dosti Grrater Thane Sector 3A Cluster 2 Phase 3.pdf15 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Annual Report DGT Sector 3A Cluster 2 Phase 3.pdf26 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg- Form-DGT-Sector-3A-CL-2-PH-III.pdf13 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form-3-DGT-Sector-3A- CL-II-PH-III.pdf13 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DGT Sector 3A Cluster 2 Phase 3 Dosti Grace.pdf23 Oct 2023
Disclosure of sold/ booked inventoryFile: DGT CL 2 PH 3 Grace.pdf20 Oct 2023
Layout approvalFile: AMENDED LAYOUT 3A CLUSTER 2 PHASE 3-Model.pdf22 Aug 2023
Copy of Layout Approval (in case of layout)File: AMENDED LAYOUT 3A CLUSTER 2 PHASE 3-Model.pdf22 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: Amended CC Highlighted Final.pdf22 Aug 2023
Declaration about Commencement CertificateFile: Declaration about CC - Phase 3.pdf22 Aug 2023
Other - TechnicalFile: Format C - Phase 3.pdf22 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: GetUserDocumentFileContent (1).pdf16 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 DGT sector 3A -cluster 2 -Ph 3.pdf5 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 DGT sector 3A -cluster 2 -Ph 3.pdf5 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 DGT sector 3A -cluster 2 -Ph 3.pdf5 Aug 2023
Layout approvalFile: 1 Amended CC layout.pdf4 Aug 2023
Layout approvalFile: 2 Amended Floor Plan.pdf4 Aug 2023
Layout approvalFile: 3 Amended Floor Plan.pdf4 Aug 2023
Layout approvalFile: 4 Amended Floor Plan.pdf4 Aug 2023
Layout approvalFile: 5 Amended Floor Plan.pdf4 Aug 2023
Layout approvalFile: 6 Amended Floor Plan.pdf4 Aug 2023
Layout approvalFile: 7 Amended Floor Plan.pdf4 Aug 2023
Copy of Layout Approval (in case of layout)File: 1 Amended CC layout.pdf4 Aug 2023
Copy of Layout Approval (in case of layout)File: 2 Amended Floor Plan.pdf4 Aug 2023
Copy of Layout Approval (in case of layout)File: 3 Amended Floor Plan.pdf4 Aug 2023
Copy of Layout Approval (in case of layout)File: 4 Amended Floor Plan.pdf4 Aug 2023
Copy of Layout Approval (in case of layout)File: 5 Amended Floor Plan.pdf4 Aug 2023
Copy of Layout Approval (in case of layout)File: 6 Amended Floor Plan.pdf4 Aug 2023
Copy of Layout Approval (in case of layout)File: 7 Amended Floor Plan.pdf4 Aug 2023
Other - TechnicalFile: Declaration - Grace - Amendment.pdf4 Aug 2023
Building plan approvalFile: DGT Sector 3A Amended Layout Approval letter.pdf3 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: DGT Sector 3A Amended Layout Approval letter.pdf3 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: DGT Sector 3A -Ammended CC New.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate DGT sec 3 Phase 3.pdf21 Jul 2023
Disclosure of sold/ booked inventoryFile: DGT - Grace.pdf7 Jul 2023
Disclosure of sold/ booked inventoryFile: Dosti Grace Phase 3.pdf5 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate DGT Sector 3A Cluster 2 Phase 3.pdf20 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 DGT Sector 3 A cluster 2 Ph3.pdf19 Apr 2023

How this compares with Thane

99%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DGT - Sector 3A - Cluster 2 - Phase 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalher Junction7,600+ in Thane

Builder: ADRIKA DEVELOPERS PRIVATE LIMITED

ADRIKA DEVELOPERS PRIVATE LIMITED has 9 registrations on MahaRERA, including DOSTI GREATER THANE - PHASE 1 and DOSTI GREATER THANE- PHASE 1 - DOSTI PARADISE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DGT - Sector 3A - Cluster 2 - Phase 3 is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DGT - Sector 3A - Cluster 2 - Phase 3?

The registered promoter entity is ADRIKA DEVELOPERS PRIVATE LIMITED, a company as per the filing. Its CIN U45200MH2006PTC158714 and GSTIN 27AAFCA5418G1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DGT - Sector 3A - Cluster 2 - Phase 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DGT - Sector 3A - Cluster 2 - Phase 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DGT - Sector 3A - Cluster 2 - Phase 3?

The professionals named in the filing: Architect: Spaceage Consultants; Architect: NEERJA PURANDARE; Architect: Architect Kaustubh J Satam; Architect: ARCHITECT JAY R VORA; Engineer: Paras R Vishwakarma; Engineer: SWAPNIL RAMESH LONDHE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DGT - Sector 3A - Cluster 2 - Phase 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DGT - Sector 3A - Cluster 2 - Phase 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DGT - Sector 3A - Cluster 2 - Phase 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.