Home / Browse projects / Mumbai Suburban, Maharashtra / DEVRAJ RESIDENCY

Completed No litigation declared Residential / Group Housing project

DEVRAJ RESIDENCY

By SHAMS ENTREPRISES

RG-MH-85831 · RERA P51800051682 · Last updated on MahaRERA portal: 13 Oct 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
57 of 62Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

DEVRAJ RESIDENCY is a Residential / Group Housing project by SHAMS ENTREPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051682 on 27 Jun 2023. The registration is recorded completed; possession was promised by 30 Jun 2026. The completion date has moved by 24 months from the original filing. 5 of the 62 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameDEVRAJ RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • S V Road
    • Malad - West
    • Malad
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800051682
  • ReraGenie IDRG-MH-85831

Builder

  • NameSHAMS ENTREPRISES
  • Entity typePartnership
  • PartnersShamshul Ala Israr Ahmed Khan, SHAHAB SHAMSUL KHAN, GAZALA SHAMSUL KHAN, ZAIBUNNISA MOHD YAKUB BAKERYWALA

Key dates

this monthRegisteredJun 2023First promiseJun 2024Revised toJun 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Jun 2023
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed113 files

Current status

8%5 of 62 units booked
100.0%Work done, per cost certificate

Figures as on 13 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DEVRAJ RESIDENCY Wing A and Wing BNA121260262

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

DEVRAJ RESIDENCY Wing A and Wing B: 89% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 13 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered25

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area930 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Jun 2025
LandownerVillageDistrict
Harish V Patel and Neela P PatelMaladMumbai Suburban
Valji H Patel and Purshottam D PatelMaladMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI3012.88
Proposed, not sanctioned2,726 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLokhandwala Complex , Andheri -West Mumbai -400053
Estimated costRs 7.00 cr
Cost incurredRs 7.00 cr
Work done100.0%
BuildingWingEstimatedIncurred
DEVRAJ RESIDENCY Wing A and Wing BNARs 6.30 crRs 6.30 cr
-NARs 70.00 lakhRs 70.00 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSarang Architect
EngineerSupercons Consultants
EngineerTristar Engineering Consultants
Chartered AccountantFA Ansari & Associates Chartered Accountants
Chartered AccountantV S Patangia & Co
Chartered AccountantVUDN & Associates LLP
PartnerRole in project
SHAMS ENTREPRISES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800019654Jun 2024 → Jun 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons.

EA23062501713Jun 2024 → Jun 2026

Reason as filed by the promoterI, Shamshul Ala Israr Ahmed Khan, hereby declare the following with respect to the project “DEVRAJ RESIDENCY” bearing registration number P51800051682 registered under MahaRERA 1. Status of Work Completed: We are pleased to inform you that we have completed the full RCC (Reinforced Cement Concrete) work for the building. Currently, we are undertaking the finishing work, which includes plastering, flooring, electrical fittings, and other essential internal and external works. 2. Expected Timeline for Completion: We are committed to completing all balance works and applying for the Occupation Ce

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: 2487063_OC_signed.pdf13 Oct 2025
Withdrawal Update Form 1File: Form 1 Devraj Residency as on June 2025 Final Certified.pdf19 Jul 2025
Withdrawal Update Form 2File: Form 2 Devraj Residency as on June 2025 Final Certified.pdf19 Jul 2025
Withdrawal Update Form 3File: Form 3 Shams Enterprises 30 06 2025.pdf19 Jul 2025
Form 2A (FY 2023-2024)File: Form 2A 2023-24.pdf13 Jun 2025
Form 2A (FY 2024-2025)File: Form 2A 2024-25.pdf13 Jun 2025
Form 1File: Form 1 Devraj Residency as on March 2025.pdf12 Jun 2025
Form 2File: Form 2 Shams Enterprises 31 03 2025.pdf12 Jun 2025
Form 3File: Form 3 Shams Enterprises 31 03 2025.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 31-03-2025.pdf12 Jun 2025
Form 1File: form 1 as on date 12 24.pdf12 Jun 2025
Form 2File: Form 2 Devraj Residency as on 31-12-2024.pdf12 Jun 2025
Form 3File: form 3 as on dec 2024.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 31-12-2024.pdf12 Jun 2025
Form 1File: Form 1 Devraj Residency as on 30-09-2024.pdf12 Jun 2025
Form 2File: Form 2 Devraj Residency as on 30-09-2024 Final.pdf12 Jun 2025
Form 3File: Form 3 Shams Enterprises 30 09 2024 Final.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 30-09-2024.pdf12 Jun 2025
Form 1File: Form 1 Shams Enterprises June 2024_compressed.pdf12 Jun 2025
Form 2File: Form 2 Shams Enterprises June 2024 Final.pdf12 Jun 2025
Form 3File: Form 3 Shams Enterprises June 2024 1.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 30-06-2024.pdf12 Jun 2025
Form 1File: form 1 March 2024.pdf12 Jun 2025
Form 2File: Form 2 Devraj Residency as on 31-03-2024.pdf12 Jun 2025
Form 3File: Form 3 March 2024.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 31-03-2024.pdf12 Jun 2025
Form 1File: Form 1 December 2023.pdf12 Jun 2025
Form 2File: Form 2 Devraj Residency as on 31-12-2023.pdf12 Jun 2025
Form 3File: Form 3 December 2023.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 31-12-2023.pdf12 Jun 2025
Form 1File: form 1 sep 2023.pdf12 Jun 2025
Form 2File: Form 2 Devraj Residency as on 30-09-2023.pdf12 Jun 2025
Form 3File: Form 3 September 2023.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 30-09-2023.pdf12 Jun 2025
Form 1File: Form 1 2023.pdf12 Jun 2025
Form 2File: Form 2 June 2023.pdf12 Jun 2025
Form 3File: Form 3 DEVRAJ RESIDENCY SEP 30-06-2023.pdf12 Jun 2025
Disclosure of Sold and Booked InventoryFile: CIRCULAR 29 as on dated 30-06-2023.pdf12 Jun 2025
Form 5 (FY 2023-2024)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf12 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Devraj Residency as on March 2025.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shams Enterprises 31 03 2025.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shams Enterprises 31 03 2025.pdf24 Apr 2025
Layout approvalFile: Devraj Residency Approved Plan 23 04 25.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: Devraj Residency Approved Plan 23 04 25.pdf23 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: 2431551_FurtherCC_signed_240612_171258 23 04 25.pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 as on dec 2024.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Devraj Residency as on 31-12-2024.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 as on date 12 24.pdf16 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Devraj Residency as on 30-09-2024.pdf21 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shams Enterprises 30 09 2024 Final.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Devraj Residency as on 30-09-2024 Final.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shams Enterprises June 2024_compressed.pdf6 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shams Enterprises June 2024 1.pdf6 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shams Enterprises June 2024 1.pdf6 Aug 2024
Layout approvalFile: Drawing New Latest Final.pdf15 Jun 2024
Building plan approvalFile: Drawing New Latest Final.pdf15 Jun 2024
Copy of Layout Approval (in case of layout)File: Drawing New Latest Final.pdf15 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing New Latest Final.pdf15 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: 2431551_FurtherCC_signed_240612_171258 Full New.pdf15 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 A.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized Form 3 for September 2023.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized Form 3 for December 2023.pdf16 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized Form 3 for March 2024.pdf16 Apr 2024
Declaration about Commencement CertificateFile: CC Declaration Devraj Residency.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 Devraj Residency.pdf15 Apr 2024
Layout approvalFile: Drawing.pdf13 Apr 2024
Building plan approvalFile: Drawing.pdf13 Apr 2024
Copy of Layout Approval (in case of layout)File: Drawing.pdf13 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: Drawing.pdf13 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 sep.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 feb.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 feb.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Devraj Residency as on 30-09-2023.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Devraj Residency as on 31-12-2023.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Devraj Residency as on 31-03-2024.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf28 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: new form 3.pdf10 Oct 2023

How this compares with Mumbai Suburban

8%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 24 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DEVRAJ RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad - West6,700+ in Mumbai Suburban

2 kmDEVRAJ RESIDENCYCompleted 113Lapsed / revoked 71Other 143Dot size: filed unitsN

Filed coordinates, straight-line distance. 327 registered projects within 2 km.

Builder: SHAMS ENTREPRISES

SHAMS ENTREPRISES has 1 registration on MahaRERA, including DEVRAJ RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if DEVRAJ RESIDENCY is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEVRAJ RESIDENCY?

The registered promoter entity is SHAMS ENTREPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEVRAJ RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DEVRAJ RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DEVRAJ RESIDENCY?

The professionals named in the filing: Architect: Sarang Architect; Engineer: Supercons Consultants; Engineer: Tristar Engineering Consultants; Chartered Accountant: FA Ansari & Associates Chartered Accountants; Chartered Accountant: V S Patangia & Co; Chartered Accountant: VUDN & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DEVRAJ RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEVRAJ RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEVRAJ RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.