ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / DEVKRUPA HEIGHTS

Registered No litigation declared Others project

DEVKRUPA HEIGHTS

By NILESH SATISH PATIL

RG-MH-05761 · RERA P51700053954 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 78%
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

DEVKRUPA HEIGHTS is a Others project by NILESH SATISH PATIL in Thane, Maharashtra, registered with MahaRERA as P51700053954 on 18 Dec 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameDEVKRUPA HEIGHTS
  • TypeOthers
  • Location
    • BHIWANDI WADA ROAD
    • VILLAGE AMBADI BHIWANDI
    • Ambadi
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700053954
  • ReraGenie IDRG-MH-05761

Builder

  • NameNILESH SATISH PATIL
  • Entity typeIndividual

Key dates

this monthRegisteredDec 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Dec 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA70000
BUILDING BNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 78%.

BUILDING A43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure78%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed63

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots63
Open Space63

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,052 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on5 Oct 2024
LandownerVillageDistrict
SUNIL RAMCHANDRA PATILDakivaliPalghar
ARUN VASANT MHATREDighashiThane
AMIT VIJAY BHOIRDighashiThane

Approvals and building plan

Sanctioning authorityCOLLECTOR OF THANE
Permissible FSI4594.46
Proposed, not sanctioned4,594 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHIVAJI CHOWK BHIWANDI

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANDAR JAYANT LELE
EngineerAKSHAY RAVINDRA THAKARE
Chartered AccountantMUKESH S SONI
Chartered AccountantNITIN BALAJI DHAVAN
PartnerRole in project
NILESH SATISH PATIL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 3File: DEVKRUPA FORM 3 MARCH 26.pdf29 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD DISCLSOURE.pdf29 Apr 2026
Form 1File: FROM 1 DEVKRUPA MARCH 26_11zon.pdf29 Apr 2026
Form 2File: FORM 2 DEVKRUPA MARCH 26_11zon.pdf29 Apr 2026
Form 1File: Devkrupa Form - 1 Dec 25.pdf2 Feb 2026
Form 2File: Devkrupa Form - 2 Dec 25.pdf2 Feb 2026
Form 3File: devkrupa dec 25 form 3.pdf2 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf2 Feb 2026
Form 1File: Form 1 devkrupa sept 25.pdf8 Nov 2025
Form 2File: Form 2 devkrupa sept 25.pdf8 Nov 2025
Form 3File: FORM 3 DEVKRUPA SIGNED COPY.pdf8 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold disclosure.pdf8 Nov 2025
Form 5 (FY 2024-2025)File: DEVKRUPA FORM 5 FY 24-25.pdf4 Nov 2025
Form 1File: form 1 june 25.pdf5 Aug 2025
Form 2File: form 2 june 25.pdf5 Aug 2025
Form 3File: form 3 devkrupa june 25.pdf5 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold unsold disclosure.pdf5 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DEVKRUPA_FORM-1_UPTO MARCH-25.pdf7 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEVKRUPA FORM 3 MARCH 25.pdf7 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DEVKRUPA_FORM-2_UPTO MARCH-25.pdf7 May 2025
Form 1File: DEVKRUPA_FORM-1_UPTO MARCH-25.pdf7 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEVKRUPA MARCH 25.pdf24 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEVKRUPA FORM 3 MARCH 25.pdf24 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEVKRUPA MARCH 25.pdf24 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: DEVKRUPA FORM 5 FY 24-25.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEVKRUPA DEC 24.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEVKRUPA FORM 3 DEC 24_11zon.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEVKRUPA DEC 24.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - JUNE 24- DEVKRUPA.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ANNEXURE-A_CONSULTING ENGINEER CERTIFICATE.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 24 DEVKRUPA_11zon.pdf14 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: devkrupa form 3 september 2024.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - JUNE 24- DEVKRUPA.pdf14 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2ANNEXURE-B_ENGINEER CERTIFICATE.pdf14 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- DEVKRUPA MARCH 2024.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- DEVKRUPA MARCH 2024.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A - DEVKRUPA 23-24.pdf21 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- DEVKRUPA MARCH 2024_11zon.pdf21 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5- DEVKRUPA MARCH 2024.pdf21 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 signed.pdf4 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: from 1.pdf4 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: from 2 signed.pdf4 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2signed.pdf4 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: from 3 dec 23.pdf4 Feb 2024
Declaration about Commencement CertificateFile: format d devkrupa revised.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FROM 3 REVISED 28112023.pdf28 Nov 2023
Building plan approvalFile: PLAN FOR BUIDING A.pdf27 Nov 2023
Building plan approvalFile: PLAN FORM BUILDING B.pdf27 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN FOR BUIDING A.pdf27 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN FORM BUILDING B.pdf27 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: SKMBT_C36023103007210_11zon.pdf31 Oct 2023
Proforma of Agreement for saleFile: NEW CORRECTED DRAFT AGREEMENT.pdf15 May 2023
Details of encumbrances concerned to FinanceFile: LEGAL AND FINANCE.pdf8 May 2023
Details of encumbrances concerned to LegalFile: LEGAL AND FINANCE.pdf8 May 2023
Layout approvalFile: LAYOUT.pdf1 May 2023
PAN CardFile: NILESH PAN CARD.pdf1 May 2023
Copy of the legal title reportFile: TITLE REPORT.pdf1 May 2023
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf1 May 2023
Commencement Certificates / NA Order for plotted developmentFile: TOWN PLANNING ORDER_1_11zon.pdf1 May 2023
Declaration in FORM BFile: FORM B DEVELOPERS_7_11zon.pdf1 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 RERA AMBADI_10_11zon.pdf1 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 RERA AMBADI_11_11zon.pdf1 May 2023
CERSAI detailsFile: CERSAI DECLARATION.pdf1 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF PROMOTER.pdf1 May 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER_3_11zon.pdf1 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A SEPARATE BANK ACCOUNT.pdf1 May 2023
Deviation Report with respect to Allotment letterFile: DEVIATION ALLOTMENT.pdf1 May 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT.pdf1 May 2023

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DEVKRUPA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLAGE AMBADI BHIWANDI7,600+ in Thane

Builder: NILESH SATISH PATIL

NILESH SATISH PATIL has 1 registration on MahaRERA, including DEVKRUPA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DEVKRUPA HEIGHTS is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEVKRUPA HEIGHTS?

The registered promoter entity is NILESH SATISH PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEVKRUPA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DEVKRUPA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DEVKRUPA HEIGHTS?

The professionals named in the filing: Architect: MANDAR JAYANT LELE; Engineer: AKSHAY RAVINDRA THAKARE; Chartered Accountant: MUKESH S SONI; Chartered Accountant: NITIN BALAJI DHAVAN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DEVKRUPA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEVKRUPA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEVKRUPA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.