ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / DEVBHOOMI

Registered No litigation declared Residential / Group Housing project

DEVBHOOMI

By METRO CAPITAL

RG-MH-05342 · RERA P51800050788 · Last updated on MahaRERA portal: 1 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
11 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 95%
115 of 152Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 119 documents Report an error

DEVBHOOMI is a Residential / Group Housing project by METRO CAPITAL in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050788 on 3 May 2023. Possession is promised by 31 Dec 2026. 37 of the 152 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete.

At a glance

Project

  • NameDEVBHOOMI
  • TypeResidential / Group Housing
  • Location
    • MOGRA NATWAR NAGAR RAOD NO 1
    • JOGESHWARI EAST
    • Mogra
    • Andheri
    • Mumbai Suburban
    • 400060
  • Pincode400060
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800050788
  • ReraGenie IDRG-MH-05342

Builder

  • NameMETRO CAPITAL
  • Entity typePartnership
  • PartnerHARESH JESHA RAVARIA
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredMay 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on3 May 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed119 files

Current status

24%37 of 152 units booked
94.0%Work done, per cost certificate

Figures as on 1 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DEVBHOOMI WING ANA181466066
DEVBHOOMI WING BNA13086086

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 95%.

DEVBHOOMI WING A90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
DEVBHOOMI WING B70%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises72%
Sanitary Fittings within the flats / premises35%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes20%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes25%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes60%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed160

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots160
Closed/Covered29
Open Space131
BuildingClosed/CoveredOpen SpaceTotal
DEVBHOOMI WING A95059
DEVBHOOMI WING B2081101

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,889 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
GARHWAL SAHAKARI BHAVAN SAMITI LTDMograMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8815.64
Proposed, not sanctioned6,555 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalachowky Branch
Estimated costRs 37.88 cr
Cost incurredRs 35.60 cr
Work done93.97%
BuildingWingEstimatedIncurred
DEVBHOOMI WING ANARs 18.94 crRs 17.80 cr
DEVBHOOMI WING BNARs 18.94 crRs 17.80 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS P SHEVADE & ASSOCIATES
EngineerEPICONS CONSULTANTS PVT LTD
EngineerSukanya Vithoba Jivle
Chartered AccountantGADA & CO
Chartered AccountantTodi Tulsyan co
Chartered AccountantPreeti Chaudhary
Chartered AccountantManish B Ranpariya
PartnerRole in project
METRO CAPITAL-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed119

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 119 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 as on 31032026.pdf1 Jun 2026
Withdrawal Update Form 1File: Form 1 as on 31032026.pdf1 Jun 2026
Withdrawal Update Form 2File: Form 2 as on 31122025.pdf1 Jun 2026
Withdrawal Update Form 2File: Form 2 as on 31032026.pdf1 Jun 2026
Withdrawal Update Form 3File: FORM 3 31122025_compressed.pdf1 Jun 2026
Withdrawal Update Form 3File: Form 3 as on 31032026_compressed.pdf1 Jun 2026
Form 5 (FY 2024-2025)File: form 5.pdf27 May 2026
Withdrawal Update Form 1File: Form 1 as on 31122025.pdf24 Jan 2026
Withdrawal Update Form 2File: Form 2 as on 31122025.pdf24 Jan 2026
Withdrawal Update Form 3File: FORM 3 31122025_compressed.pdf24 Jan 2026
Withdrawal Update Form 1File: Form 1 as on 30062025.pdf3 Jan 2026
Withdrawal Update Form 1File: Form 1 as on 30062025.pdf3 Jan 2026
Withdrawal Update Form 1File: Form 1 as on 30092025.pdf3 Jan 2026
Withdrawal Update Form 2File: Form 2 as on 30062025.pdf3 Jan 2026
Withdrawal Update Form 2File: Form 2 as on 30062025.pdf3 Jan 2026
Withdrawal Update Form 2File: Form 2 as on 30092025.pdf3 Jan 2026
Withdrawal Update Form 3File: Form 3 as on 30062025 updated.pdf3 Jan 2026
Withdrawal Update Form 3File: Form 3 as on 30062025 updated.pdf3 Jan 2026
Withdrawal Update Form 3File: Form 3 as on 30092025.pdf3 Jan 2026
Withdrawal Update Form 1File: Form 1 as on 30062025.pdf8 Sep 2025
Withdrawal Update Form 2File: Form 2 as on 30062025.pdf8 Sep 2025
Withdrawal Update Form 3File: Form 3 as on 30062025 updated.pdf8 Sep 2025
Withdrawal Update Form 1File: Form 1 as on 30062025.pdf12 Aug 2025
Withdrawal Update Form 1File: Form 1 as on 30062025.pdf12 Aug 2025
Withdrawal Update Form 2File: Form 2 as on 30062025.pdf12 Aug 2025
Withdrawal Update Form 2File: Form 2 as on 30062025.pdf12 Aug 2025
Withdrawal Update Form 3File: Form 3 as on 30062025 updated.pdf12 Aug 2025
Withdrawal Update Form 3File: Form 3 as on 30062025 updated.pdf12 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 as on 31032025.pdf7 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 as on 31032025.pdf4 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 as on 31122024.pdf4 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 as on 310325.pdf4 Jul 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 as on 3103025.pdf4 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory 31122024.pdf4 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory 31032025.pdf4 Jul 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Project Information (2).pdf25 Jun 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 1 Project Information (2).pdf25 Jun 2025
Details of encumbrances concerned to FinanceFile: Devbhoomi - Encumbrance Self Declaration.pdf27 Jan 2025
Details of encumbrances concerned to LegalFile: Devbhoomi - Encumbrance Self Declaration.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE R-7 20-01-2025.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Q3.pdf21 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1_engineer certificate_Jan_25 (1).pdf21 Jan 2025
Details of encumbrances concerned to FinanceFile: 2 (3).pdf11 Dec 2024
Details of encumbrances concerned to LegalFile: 2 (3).pdf11 Dec 2024
Details of encumbrances concerned to FinanceFile: rera encumbrance.pdf6 Dec 2024
Details of encumbrances concerned to FinanceFile: rera encumbrance.pdf6 Dec 2024
Details of encumbrances concerned to LegalFile: rera encumbrance.pdf6 Dec 2024
Details of encumbrances concerned to LegalFile: rera encumbrance.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE q2 fy 24-25.pdf22 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Q2.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 engineer certificate_Oct_24 q2.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate Q1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate July 24.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate FY 24 25 Q1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate_Apr_24 (1).pdf10 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Metro 1.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Metro Q2.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: metro Q3.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Metro Q4.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: engineer certificate Q4.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate Q1.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate Q1.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate Q2.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate Q3.pdf7 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality assurance certificate 23-24.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CARTIFICATE FY 23-24 Q1.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CARTIFICATE FY 23-24 Q1.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CARTIFICATE FY 23-24 Q1.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CARTIFICATE FY 23-24 Q1.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FY 23-24 Q2.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CARTIFICATE FY 23-24 Q3.pdf7 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FY 23-24 Q4.pdf7 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FINAL.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE 2 18-03-2024.pdf26 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA CERTIFICATE 2 16-03-2024.pdf17 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality assurance certificate 11032024.pdf17 Mar 2024
Details of encumbrances concerned to FinanceFile: Financial Encumbrance on Project.pdf21 Apr 2023
Details of encumbrances concerned to LegalFile: Financial Encumbrance on Project.pdf21 Apr 2023
Other - TechnicalFile: Drawing1.pdf21 Apr 2023
Other - TechnicalFile: Drawing2.pdf21 Apr 2023

How this compares with Mumbai Suburban

24%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DEVBHOOMI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JOGESHWARI EAST6,700+ in Mumbai Suburban

2 kmDEVBHOOMICompleted 44Lapsed / revoked 22Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: METRO CAPITAL

METRO CAPITAL has 2 registrations on MahaRERA, including Tulsi Elanza and DEVBHOOMI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if DEVBHOOMI is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEVBHOOMI?

The registered promoter entity is METRO CAPITAL, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEVBHOOMI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DEVBHOOMI?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DEVBHOOMI?

The professionals named in the filing: Architect: S P SHEVADE & ASSOCIATES; Engineer: EPICONS CONSULTANTS PVT LTD; Engineer: Sukanya Vithoba Jivle; Chartered Accountant: GADA & CO; Chartered Accountant: Todi Tulsyan co; Chartered Accountant: Preeti Chaudhary. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DEVBHOOMI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEVBHOOMI. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEVBHOOMI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.