Home / Browse projects / Pune, Maharashtra / DESTINATION HINJAWADI
DESTINATION HINJAWADI
RG-MH-95214 · RERA P52100017252 · Last updated on MahaRERA portal: 9 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
DESTINATION HINJAWADI is a Others project by PRIME SMP DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100017252 on 24 Jul 2018. Possession was promised by 30 Dec 2024 and is now 22 months past that date. 1 complaint is on record with the regulator.
At a glance
Project
- NameDESTINATION HINJAWADI
- TypeOthers
- Location
- MAAN ROAD
- HINJAWADI
- Hinjavadi (CT)
- Mulshi
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100017252
- ReraGenie IDRG-MH-95214
Builder
- NamePRIME SMP DEVELOPERS
- Entity typePartnership
- PartnersMONISH SHYAM AGARWAL, SHUBHAM SHYAMLAL AGARWAL
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Jul 2018
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings5 building records
- Documents filed108 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| DESTINATION HINJAWADI | NA | 6 | 0 | 0 | 0 | 0 |
| DESTINATION 2 | NA | 0 | 0 | 0 | 0 | 0 |
| DESTINATION 3 | NA | 0 | 0 | 0 | 0 | 0 |
| DESTINATION 4 | NA | 0 | 0 | 0 | 0 | 0 |
| DESTINATION 5 | NA | 0 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 9 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 5%.
DESTINATION HINJAWADI91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
DESTINATION 20%
| Activity | Progress |
|---|---|
| Excavation | 5% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
DESTINATION 30%
| Activity | Progress |
|---|---|
| Excavation | 5% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
DESTINATION 40%
| Activity | Progress |
|---|---|
| Excavation | 5% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
DESTINATION 50%
| Activity | Progress |
|---|---|
| Excavation | 5% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 9 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners2
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAVI KADAM |
| Chartered Accountant | R DKabra & Associates |
| Partner | Role in project |
|---|---|
| PRIME SMP DEVELOPERS | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000167584 | Gurpavit Singh | M/s. Prime SMP Developers | 14/09/2022 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jun 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 18 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Oct 2024
Documents filed108
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24 Destination Hinjewadi.pdf | 9 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form-4.pdf | 19 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate- Destination Hinjawadi.pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Dec 23.pdf | 8 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 March 24.pdf | 8 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Jun 24.pdf | 8 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Jun 24.pdf | 8 Aug 2024 |
| Certificates of CA (Form 3)File: Form-3 Dec 23.pdf | 8 Aug 2024 |
| Certificates of CA (Form 3)File: Form-3 March 24.pdf | 8 Aug 2024 |
| Certificates of CA (Form 3)File: Form-3 Jun 24.pdf | 8 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA form 2- Destination.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 March 24.pdf | 20 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 20 Jul 2024 |
| Details of encumbrancesFile: Encumbrances Letter- Prime smp 10Cr.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Rera Form 1- Destination.pdf | 31 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 24 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 24 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: Promoter Disclouser Sold Unsold unit list_compressed.pdf | 24 Nov 2023 |
| Certificates of CA (Form 3)File: Form 3_compressed.pdf | 24 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Destination.pdf | 12 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrances Letter- Prime smp 10Cr.pdf | 11 Oct 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrances Letter- Prime smp 10Cr.pdf | 11 Oct 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 5 (2).pdf | 11 Jul 2023 |
| Building plan approvalFile: First 0003_compressed.pdf | 18 May 2023 |
| Building plan approvalFile: Ground 0001_compressed.pdf | 18 May 2023 |
| Building plan approvalFile: Second 0004_compressed.pdf | 18 May 2023 |
| Building plan approvalFile: sheet 0002_compressed.pdf | 18 May 2023 |
| Building plan approvalFile: terrace Floor 0006_compressed.pdf | 18 May 2023 |
| Building plan approvalFile: Third 0005_compressed.pdf | 18 May 2023 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCES_Certifificate for legal.pdf | 18 May 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration regarding Encumbrance- Destination.pdf | 18 May 2023 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCES_Certifificate for legal.pdf | 18 May 2023 |
| Details of encumbrances concerned to LegalFile: Declaration regarding Encumbrance- Destination.pdf | 18 May 2023 |
| Building Plan Approval (IOD)File: First 0003_compressed.pdf | 18 May 2023 |
| Building Plan Approval (IOD)File: Ground 0001_compressed.pdf | 18 May 2023 |
| Building Plan Approval (IOD)File: Second 0004_compressed.pdf | 18 May 2023 |
| Building Plan Approval (IOD)File: sheet 0002_compressed.pdf | 18 May 2023 |
| Building Plan Approval (IOD)File: terrace Floor 0006_compressed.pdf | 18 May 2023 |
| Building Plan Approval (IOD)File: Third 0005_compressed.pdf | 18 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCMENT CERTIFICATE -2023_compressed.pdf | 18 May 2023 |
| Declaration about Commencement CertificateFile: Declaration of Commencement.pdf | 18 May 2023 |
| Declaration about Commencement CertificateFile: COMMENCMENT CERTIFICATE -2023_compressed.pdf | 18 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31_3_2023 JOYTOWN.pdf | 18 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - 31-3-2023- PRIME SMP DEV.pdf | 18 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - 31-3-2023 JOYTOWN.pdf | 18 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 31_3_23 DESTINATION.pdf | 18 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A 31_3_23.pdf | 18 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM- 2A- 31_3_23 DESTINATION.pdf | 18 May 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200267146867_For_Asset_Based_Search_27_04_2023_15_35_35_508.pdf | 18 May 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory final.pdf | 18 May 2023 |
| Certificates of CA (Form 3)File: FORM-3 joytown 31-3-23.pdf | 18 May 2023 |
| Certificates of CA (Form 3)File: FORM 3 OF 30-3-23 DESTI HINJEWADI_compressed.pdf | 18 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Esate Org- Destination.pdf | 18 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DH 30122022.pdf | 1 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Engineering Certificate.pdf | 28 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3 Prime SMP Dec 2022 (1).pdf | 28 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Prime SMP.pdf | 18 Jan 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200255433807_For_Asset_Based_Search_21_12_2022_13_07_25_098.pdf | 21 Dec 2022 |
| Layout approvalFile: 01.pdf | 16 Dec 2022 |
| Building plan approvalFile: 02.pdf | 16 Dec 2022 |
| Building plan approvalFile: 03.pdf | 16 Dec 2022 |
| Building plan approvalFile: 04.pdf | 16 Dec 2022 |
| Building plan approvalFile: 05.pdf | 16 Dec 2022 |
| Copy of Layout Approval (in case of layout)File: 01.pdf | 16 Dec 2022 |
| Building Plan Approval (IOD)File: 02.pdf | 16 Dec 2022 |
| Building Plan Approval (IOD)File: 03.pdf | 16 Dec 2022 |
| Building Plan Approval (IOD)File: 04.pdf | 16 Dec 2022 |
| Building Plan Approval (IOD)File: 05.pdf | 16 Dec 2022 |
| Proforma of Agreement for saleFile: Destination Final Regular Agreement to Sale - 01-11-2022- Munot Sir.pdf | 16 Dec 2022 |
| Details of encumbrancesFile: Declaration regarding encumbrance to finance.pdf | 9 Dec 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Architect Certificate- Destination.pdf | 9 Dec 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure Sold Unsold_DH.pdf | 9 Dec 2022 |
| Declaration about Commencement CertificateFile: Declaration about Commencement certificate- Destination.pdf | 7 Dec 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 20.pdf | 12 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate 21.pdf | 12 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Annexure B.pdf | 12 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Annexure C 2019.pdf | 12 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Annexure C 2020.pdf | 12 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Annexure C 2021.pdf | 12 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 108 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep DESTINATION HINJAWADI on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near HINJAWADI13,700+ in Pune
Filed coordinates, straight-line distance. 91 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: PRIME SMP DEVELOPERS
PRIME SMP DEVELOPERS has 1 registration on MahaRERA, including DESTINATION HINJAWADI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that DESTINATION HINJAWADI shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if DESTINATION HINJAWADI is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of DESTINATION HINJAWADI?
The registered promoter entity is PRIME SMP DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in DESTINATION HINJAWADI?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against DESTINATION HINJAWADI?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for DESTINATION HINJAWADI?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at DESTINATION HINJAWADI?
The professionals named in the filing: Architect: RAVI KADAM; Chartered Accountant: R DKabra & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in DESTINATION HINJAWADI?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback