Registration lapsed No litigation declared Residential / Group Housing project

DEOLALI MEADOWS D WING

By ATB SAMARTH LLP

RG-MH-70045 · RERA P51600053035 · Last updated on MahaRERA portal: 23 Feb 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
9 of 11Construction stages donefurthest along: Basement (if any), 0%
16 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

DEOLALI MEADOWS D WING is a Residential / Group Housing project by ATB SAMARTH LLP in Nashik, Maharashtra, registered with MahaRERA as P51600053035 on 10 Oct 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 8 of the 24 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameDEOLALI MEADOWS D WING
  • TypeResidential / Group Housing
  • Location
    • DEOLALI
    • SANSARI
    • Nashik
    • 422401
  • Pincode422401
  • RERA no.P51600053035
  • ReraGenie IDRG-MH-70045

Builder

  • NameATB SAMARTH LLP
  • Entity typeOthers
  • Named personsBHUSHAN BHAGWAN BHUTADA, ANSHUL CHHAGANLAL AGRAWAL, VISHNUKANT PRADIP TAPADIA, NITESH ASHOK TAPADIA

Key dates

10 months past promisethis monthRegisteredOct 2023PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on10 Oct 2023
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed108 files

Current status

33%8 of 24 units booked
58.4%Work done, per cost certificate

Figures as on 23 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DEOLALI MEADOWS D WINGNA4424024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

DEOLALI MEADOWS D WING: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Closed/Covered1
Open Space51

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,898 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
VASTU REALTORSDeolali (CB)Nashik

Approvals and building plan

Permissible FSI1474.12
Proposed, not sanctioned1,474 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDEVLALI, NASHIK
Estimated costRs 4.50 cr
Cost incurredRs 2.63 cr
Work done58.44%
BuildingWingEstimatedIncurred
DEOLALI MEADOWS D WINGNARs 4.30 crRs 2.63 cr
-NARs 20.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHARAM PAPNEJA
EngineerCHANDRASHEKHAR CHANDANKHEDE
Chartered AccountantPIYUSH LALIT VERMA
Chartered AccountantBHUSHAN BHARAT GOSAR
PartnerRole in project
ATB SAMARTH LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf23 Feb 2026
Form 2File: Form 2.pdf23 Feb 2026
Form 3File: Form 3.pdf23 Feb 2026
Disclosure of Sold and Booked InventoryFile: Dec 2023.pdf23 Feb 2026
Withdrawal Update Form 1File: Architect Cert 1.pdf23 Feb 2026
Withdrawal Update Form 1File: Architect Cert 2.pdf23 Feb 2026
Withdrawal Update Form 2File: Form 2 Sept 25.pdf23 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec 25 Signed.pdf23 Feb 2026
Withdrawal Update Form 3File: Form 3 Sept 25.pdf23 Feb 2026
Withdrawal Update Form 3File: Form 3 Dec 25.pdf23 Feb 2026
Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf23 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf23 Feb 2026
Form 2A (FY 2025-2026)File: Form 2A 25-26.pdf23 Feb 2026
Form 5 (FY 2023-2024)File: ATB Samarth LLP_Form 5_FY 2023-24.pdf4 Feb 2026
Form 5 (FY 2024-2025)File: ATB Samarth LLP_Form 5_FY 2024-25.pdf4 Feb 2026
Form 1File: Form 1 March 2024.pdf10 Jun 2025
Form 2File: Form 2 march 2024.pdf10 Jun 2025
Form 3File: Form 3 March 24.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: March 2024.pdf10 Jun 2025
Form 1File: Form 1 June 24.pdf10 Jun 2025
Form 2File: Form 2 June 24.pdf10 Jun 2025
Form 3File: Form 3 June 24.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: June 2024.pdf10 Jun 2025
Form 1File: Form 1 June 24.pdf10 Jun 2025
Form 2File: Form 2 June 24.pdf10 Jun 2025
Form 3File: Form 3 June 24.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: June 2024.pdf10 Jun 2025
Form 1File: Form 1 sept 2024.pdf10 Jun 2025
Form 2File: Form 2 Sept 2024.pdf10 Jun 2025
Form 3File: ATB Form 3 Sept 24.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sept 2024.pdf10 Jun 2025
Form 1File: Form 1 Dec 2024.pdf10 Jun 2025
Form 2File: Form 2 Dec 2024.pdf10 Jun 2025
Form 3File: ATB Form 3 Dec 24.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: Dec 2024.pdf10 Jun 2025
Form 1File: Form 1 March 2025.pdf10 Jun 2025
Form 2File: Form 2 March 2025.pdf10 Jun 2025
Form 3File: ATB Form 3 March 25.pdf10 Jun 2025
Disclosure of Sold and Booked InventoryFile: March 2025.pdf10 Jun 2025
Layout approvalFile: Building Plan Deolali Meadows.pdf28 Apr 2025
Building plan approvalFile: Building Plan Deolali Meadows.pdf28 Apr 2025
Copy of Layout Approval (in case of layout)File: Building Plan Deolali Meadows.pdf28 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: DEOLALI MEADOWS COMMENCEMENT.pdf28 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Deolali Meadows.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 march 2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-34.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 24.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 march 2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-34.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 24.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 march 2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-34.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 24.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 June 24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 24.pdf6 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 24.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 march 2024.pdf6 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf6 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-34.pdf6 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ATB Architect Certificate.pdf19 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ATB Engineer Certificate.pdf19 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf19 Jul 2023
Layout approvalFile: scan0149.pdf16 Jul 2023
Layout approvalFile: Sign on back side of plan.pdf16 Jul 2023
Layout approvalFile: Sign 1.pdf16 Jul 2023
Layout approvalFile: Sign 2.pdf16 Jul 2023
Building plan approvalFile: scan0150_compressed (1).pdf16 Jul 2023

How this compares with Nashik

33%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is among them

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DEOLALI MEADOWS D WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DEOLALI4,100+ in Nashik

Builder: ATB SAMARTH LLP

ATB SAMARTH LLP has 1 registration on MahaRERA, including DEOLALI MEADOWS D WING. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What does it mean that DEOLALI MEADOWS D WING shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if DEOLALI MEADOWS D WING is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DEOLALI MEADOWS D WING?

The registered promoter entity is ATB SAMARTH LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DEOLALI MEADOWS D WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DEOLALI MEADOWS D WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DEOLALI MEADOWS D WING?

The professionals named in the filing: Architect: DHARAM PAPNEJA; Engineer: CHANDRASHEKHAR CHANDANKHEDE; Chartered Accountant: PIYUSH LALIT VERMA; Chartered Accountant: BHUSHAN BHARAT GOSAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DEOLALI MEADOWS D WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DEOLALI MEADOWS D WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DEOLALI MEADOWS D WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.