ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Deepjyoti Chs Ltd

Registered No litigation declared Others project

Deepjyoti Chs Ltd

By Borkar Realty

RG-MH-07315 · RERA P51700054974 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 40%
76 of 94Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Deepjyoti Chs Ltd is a Others project by Borkar Realty in Thane, Maharashtra, registered with MahaRERA as P51700054974 on 21 Feb 2024. Possession is promised by 30 Jun 2028. 18 of the 94 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameDeepjyoti Chs Ltd
  • TypeOthers
  • Location
    • Panchpakhadi
    • Thane
    • Thane (M Corp.)
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700054974
  • ReraGenie IDRG-MH-07315

Builder

  • NameBorkar Realty
  • Entity typePartnership
  • GSTIN27ABAFB5134F1ZU
  • PartnersMahesh Shriram Borkar, Manisha Mahesh Borkar, Vibhav Sanjay Borkar, Nandini Mahesh Borkar
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2024PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Feb 2024
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

19%18 of 94 units booked
4.2%Work done, per cost certificate

Figures as on 12 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Deepjyoti Chs LtdNA2120682694

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 40%.

Deepjyoti Chs Ltd: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.6%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed151

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots151
Closed/Covered111
Open Space40

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,700 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on10 Mar 2026
LandownerVillageDistrict
Deep Jyoti Co-Operative Housing Society LtdThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI5998.0
Proposed, not sanctioned5,998 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShankeshwer Arcade, Ram Ganesh Gadkari Path, Ram Maruti Cross Road, Thane-400602
Estimated costRs 49.00 cr
Cost incurredRs 2.04 cr
Work done4.17%
BuildingWingEstimatedIncurred
Deepjyoti Chs LtdNARs 49.00 crRs 2.04 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSaakaar Architects (Arch Sandeep Prabhu & Arch Makarand Parange)
EngineerR. C. Tipnis
EngineerRohit Birwadkar
Chartered AccountantM/s Pratik D.Jain & Associates
Chartered AccountantDinesh Kori
Chartered AccountantDeepak Gage
PartnerRole in project
Borkar Realty-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: AR - Deep jyoti - March 26 .pdf12 May 2026
Withdrawal Update Form 2File: Deepjyoti - Form 2 Engg Certificate March 26.pdf12 May 2026
Withdrawal Update Form 3File: Form 3 CA Certificate March 2026 Deepjyoti.pdf12 May 2026
Withdrawal Update Form 1File: AR - Deep jyoti - Dec 25 .pdf9 May 2026
Withdrawal Update Form 2File: Form 2 Engg Certificate Dec 25.pdf9 May 2026
Withdrawal Update Form 3File: Form 3.pdf9 May 2026
Form 2A (FY 2025-2026)File: Form 2A Engineers Certificate - Deep Jyoti March 26.pdf6 Apr 2026
Form 2A (FY 2023-2024)File: Form 2A Engineers Certificate - Deep Jyoti March 24.pdf6 Apr 2026
Form 2A (FY 2024-2025)File: Form 2A Engineers Certificate - Deep Jyoti March 25.pdf6 Apr 2026
Form 1File: Architect Cert - Deepjyoti.pdf1 Apr 2026
Form 2File: Form 2 Engg Certificate March 25.pdf1 Apr 2026
Form 3File: Form 3 deep jyoti March 2025.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Deep Jyoti March 2025.pdf1 Apr 2026
Form 5 (FY 2024-2025)File: Form 5 Deep Jyoti.pdf1 Apr 2026
Form 1File: Architect certificate Work Completion Cert..pdf13 Nov 2025
Form 2File: Engg Certificate Sept 25.pdf13 Nov 2025
Form 3File: CA Certificates Sept 25_C.pdf13 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure September 2025.pdf13 Nov 2025
Form 1File: AR - June 25_compressed.pdf3 Oct 2025
Form 2File: Engg Certificate June 25.pdf3 Oct 2025
Form 3File: CA Certificate June 25.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Deep Jyoti June 2025.pdf3 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR- Deepjyoti CHS.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 deep jyoti March 2025.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certificate March 25.pdf26 Apr 2025
Other - TechnicalFile: Quality Assurance Certificate Form 2A- Deepjyoti.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Deep Jyoti March 2025.pdf25 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR -.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Deep Jyoti March 2025.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Deep Jyoti 23 Jan 2025.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - Sept.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA -Dec 24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certificate Dec 24.pdf19 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engg Certificate Sept 24.pdf19 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Letter Deep Jyoti.pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure (2).pdf14 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory Deep Jyoti December 2024.pdf14 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Deep Jyoti CA Certificate-09022024 - converted.pdf10 Feb 2024
Copy of the legal title reportFile: Deepjyoti Search report (1).pdf13 Jan 2024
Other - LegalFile: Partnership Deed - Borkar Realty (1).pdf13 Jan 2024
Other - LegalFile: Borkar Realty-Clarification Letter (1).pdf13 Jan 2024
Other - TechnicalFile: CC.pdf13 Jan 2024
Other - TechnicalFile: Borkar Realty-Clarification Letter (1).pdf13 Jan 2024
Proforma of Agreement for saleFile: Deepjyoti Agreement To Sale.pdf4 Jan 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf21 Dec 2023
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf21 Dec 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Finance.pdf21 Dec 2023
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf21 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: DEEP JYOTI CC - Initial.pdf21 Dec 2023
CERSAI detailsFile: CERSAI Search Report.pdf21 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation for Agreement For Sale.pdf21 Dec 2023
Layout approvalFile: Building Plan APPROVED PLAN-1.pdf20 Dec 2023
Layout approvalFile: Building Plan APPROVED PLAN-2.pdf20 Dec 2023
Layout approvalFile: Building Plan APPROVED PLAN-3.pdf20 Dec 2023
Layout approvalFile: Building Plan APPROVED PLAN-4.pdf20 Dec 2023
Layout approvalFile: Building Plan APPROVED PLAN-5.pdf20 Dec 2023
Building plan approvalFile: Building Plan APPROVED PLAN-1.pdf20 Dec 2023
Building plan approvalFile: Building Plan APPROVED PLAN-2.pdf20 Dec 2023
Building plan approvalFile: Building Plan APPROVED PLAN-3.pdf20 Dec 2023
Building plan approvalFile: Building Plan APPROVED PLAN-4.pdf20 Dec 2023
Building plan approvalFile: Building Plan APPROVED PLAN-5.pdf20 Dec 2023
Copy of the legal title reportFile: Legal Title Report - Maha RERA-com.pdf20 Dec 2023
Copy of Layout Approval (in case of layout)File: Building Plan APPROVED PLAN-1.pdf20 Dec 2023
Copy of Layout Approval (in case of layout)File: Building Plan APPROVED PLAN-2.pdf20 Dec 2023
Copy of Layout Approval (in case of layout)File: Building Plan APPROVED PLAN-3.pdf20 Dec 2023
Copy of Layout Approval (in case of layout)File: Building Plan APPROVED PLAN-4.pdf20 Dec 2023
Copy of Layout Approval (in case of layout)File: Building Plan APPROVED PLAN-5.pdf20 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan APPROVED PLAN-1.pdf20 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan APPROVED PLAN-2.pdf20 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan APPROVED PLAN-3.pdf20 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan APPROVED PLAN-4.pdf20 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Building Plan APPROVED PLAN-5.pdf20 Dec 2023
Declaration about Commencement CertificateFile: Form D - Deepjyoti Chs Ltd pdf.pdf20 Dec 2023
Declaration in FORM BFile: Form B Deep Jyoti.pdf20 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf20 Dec 2023
Proforma of Allotment letterFile: Allotment Letter - Deepjyoti Chs Ltd DRAFT.pdf20 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration - Deepjyoti Chs Ltd pdf.pdf20 Dec 2023
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter-Deep Jyoti.pdf20 Dec 2023
PAN CardFile: Borkar Realty - Pan Card 01.pdf16 Dec 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
WindsorP51700079914Near New Girls English School, Thane90Mar 2025OngoingDec 2028Not due yet

How this compares with Thane

19%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Deepjyoti Chs Ltd on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane7,600+ in Thane

2 kmDeepjyoti Chs LtdCompleted 111Lapsed / revoked 76Other 153Dot size: filed unitsN

Filed coordinates, straight-line distance. 340 registered projects within 2 km.

Builder: Borkar Realty

Borkar Realty has 2 registrations on MahaRERA, including Deepjyoti Chs Ltd and Windsor. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Deepjyoti Chs Ltd is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Deepjyoti Chs Ltd?

The registered promoter entity is Borkar Realty, a partnership as per the filing. Its GSTIN 27ABAFB5134F1ZU can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Deepjyoti Chs Ltd?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Deepjyoti Chs Ltd?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Deepjyoti Chs Ltd?

The professionals named in the filing: Architect: Saakaar Architects (Arch Sandeep Prabhu & Arch Makarand Parange); Engineer: R. C. Tipnis; Engineer: Rohit Birwadkar; Chartered Accountant: M/s Pratik D.Jain & Associates; Chartered Accountant: Dinesh Kori; Chartered Accountant: Deepak Gage. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Deepjyoti Chs Ltd?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Deepjyoti Chs Ltd. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Deepjyoti Chs Ltd to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.