Home / Browse projects / Thane, Maharashtra / DATTU ENCLAVE

Registered No litigation declared Others project

DATTU ENCLAVE

By YASH ENTERPRISES

RG-MH-06799 · RERA P51700054489 · Last updated on MahaRERA portal: 18 Jan 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
3 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 60%
48 of 50Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 101 documents Report an error

DATTU ENCLAVE is a Others project by YASH ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700054489 on 25 Jan 2024. Possession is promised by 31 Dec 2028. 2 of the 50 units on this registration are recorded sold or booked, and 3 of 22 construction stages are filed complete.

At a glance

Project

  • NameDATTU ENCLAVE
  • TypeOthers
  • Location
    • POONA LINK ROAD
    • KATEMANEVALI
    • Kalyan
    • Thane
    • 421306
  • Pincode421306
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700054489
  • ReraGenie IDRG-MH-06799

Builder

  • NameYASH ENTERPRISES
  • Entity typePartnership
  • PartnersYASHWANT SITLAPRASAD YADAV, RADHESHYAM RAMLAKHAN YADAV, DEVENDRA NATHUSINGH GODARA, ASHISH SABHAJEET YADAV
  • Other registrations7 more →
  • Completed3 of 8
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed101 files

Current status

4%2 of 50 units booked
38.3%Work done, per cost certificate

Figures as on 18 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA9937542
WING BNA33448

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 60%.

WING A44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)60%
Plinth100%
Stilt Floor50%
Slabs of Super Structure52%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks26%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed178

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots178
Open Space178
BuildingOpen SpaceTotal
WING A165165
WING B1313

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,020 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on24 Nov 2025
LandownerVillageDistrict
SUDAM DATTU PAWSHEKATEMANEVALIThane

Approvals and building plan

Sanctioning authorityKDMC
Permissible FSI6011.94
Proposed, not sanctioned2,735 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, SAIDHAM APARTMENT, NEAR KANEMANIVALI NAKA, KALYAN EAST 421306
Estimated costRs 12.00 cr
Cost incurredRs 4.60 cr
Work done38.33%
BuildingWingEstimatedIncurred
WING ANARs 9.50 crRs 4.60 cr
WING BNARs 2.00 cr-
-NARs 50.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCREATIONS
EngineerDHOKLE & ASSOCIATES
EngineerSANDEEP V KHANDODE
EngineerMUKUND WAGHMARE
Chartered AccountantASPG & CO
Chartered Accountantpooja jain associates
PartnerRole in project
YASH ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Nov 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed101

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1-31-12-2025.pdf18 Jan 2026
Withdrawal Update Form 2File: FORM 2 ENGINEERS CERT.pdf18 Jan 2026
Withdrawal Update Form 3File: form 3 31-12-2025.pdf18 Jan 2026
Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE-1.pdf14 Jan 2026
Withdrawal Update Form 2File: FORM 2 ENGINEERS CERT.pdf14 Jan 2026
Withdrawal Update Form 3File: CA CERT FORM 3.pdf14 Jan 2026
Form 5 (FY 2024-2025)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf29 Oct 2025
Form 1File: form 1-30-09-2025.pdf17 Oct 2025
Form 2File: form 2 30-09-2025.pdf17 Oct 2025
Form 3File: form 3 sept 2025.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold inventory 30th sep 2025.pdf17 Oct 2025
OthersFile: form 2A- 30th sep 2025.pdf17 Oct 2025
Form 1File: form no 1 MARCH 2024.pdf7 Aug 2025
Form 2File: FORM 2 (01-01-2024 TO 31-03-2024).pdf7 Aug 2025
Form 3File: FORM 3 MAR24.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold - unsold inventory (period jan to mar 2024).pdf7 Aug 2025
OthersFile: FORM 2A 1st jan to 31st mar 2024.pdf7 Aug 2025
Form 1File: Form 1 jun 2024.pdf7 Aug 2025
Form 2File: FORM 2 (01-04-2024 TO 30-06-2024).pdf7 Aug 2025
Form 3File: form 3 (1st april 2024 to 30th june 2024 ) (1).pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold - unsold inventory (period apr to jun 2024).pdf7 Aug 2025
OthersFile: FORM 2A JUN 24.pdf7 Aug 2025
Form 1File: Form 1 September 2024.pdf7 Aug 2025
Form 2File: FORM 2 (01-07-2024 TO 30-09-2024).pdf7 Aug 2025
Form 3File: form 3 (1st july to 30th September 2024) (1).pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold -unsold inventory (period jul to sep 2024).pdf7 Aug 2025
OthersFile: FORM 2A 1ST JULY TO 30TH SEP 2024.pdf7 Aug 2025
Form 1File: FORM 1 ( 31-12-2024) (1).pdf7 Aug 2025
Form 2File: FORM 2 OCT2024 to DEC2024.pdf7 Aug 2025
Form 3File: FORM 3 (FOR OCTOBER 2024 TO DECEMBER 2023.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: sold - unsold inventory (period oct to dec).pdf7 Aug 2025
OthersFile: FORM 2A 1ST OCT TO 31ST DEC 2024.pdf7 Aug 2025
Form 1File: FORM 1 1ST JAN TO 25th MAR 25.pdf7 Aug 2025
Form 2File: FORM 2 JAN -MAR 2025.pdf7 Aug 2025
Form 3File: FORM 3 JAN 2025 TO mar 2025.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY (PERIOD 1ST JAN TO 31ST MARCH 2025).pdf7 Aug 2025
OthersFile: FORM 2A 1ST JAN TO 31ST MAR 2025.pdf7 Aug 2025
Form 5 (FY 2023-2024)File: form 5 (26-10-24) (1).pdf7 Aug 2025
Form 2A (FY 2023-2024)File: FORM 2A 1ST OCT TO 31ST DEC 2023.pdf22 Jul 2025
Form 1File: FORM 1 JUN 2025.pdf15 Jul 2025
Form 2File: form 2 apr-jun 2025.pdf15 Jul 2025
Form 3File: FORM 3 JUN 2025.pdf15 Jul 2025
Disclosure of Sold and Booked InventoryFile: SPLD UNSOLD JUN 2025.pdf15 Jul 2025
Form 2A (FY 2024-2025)File: FORM 2A 1st jan to 31st mar 2024.pdf15 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 2 JAN -MAR 2025.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 OCT2024 to DEC2024.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 JAN -MAR 2025.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: YASHENTERPRISES FORM3 Q4 FY 2024-25.pdf13 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: YASHENTERPRISES_FORM5 FY2024-25.pdf13 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 1ST JAN TO 25th MAR 25.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 Yash Ent.pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: sold - unsold inventory (period jan to mar 2024).pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: sold - unsold inventory (period apr to jun 2024).pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: sold - unsold inventory (period oct to dec).pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold inventory (period - jan to march 2024).pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY (PERIOD 1ST JAN TO 31ST MARCH 2025).pdf7 Apr 2025
Disclosure of sold/ booked inventoryFile: sold -unsold inventory (period jul to sep 2024).pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 1ST APR TO 3OTH JUNE.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 1st jan to 31st mar 2024.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 1ST JAN TO 31ST MAR 2025.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 1ST JULY TO 30TH SEP 2024.pdf7 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 1ST OCT TO 31ST DEC 2023.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ( 31-12-2024).pdf13 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (FOR OCTOBER 2024 TO DECEMBER 2024 (1).pdf13 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (01-01-2024 TO 31-03-2024).pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (01-04-2024 TO 30-06-2024).pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (01-07-2024 TO 30-09-2024).pdf16 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form no 3 (25th jan to 31st march 2024) (1).pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (1st april 2024 to 30th june 2024 ) (1).pdf12 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 (1st july to 30th September 2024) (1).pdf12 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 (26-10-24) (1).pdf12 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 jun 2024.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 September 2024.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form no 1 MARCH 2024.pdf25 Oct 2024
Layout approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf27 Nov 2023
Copy of Layout Approval (in case of layout)File: 1 Building Plan Approval _ NA Order for plotted development.pdf27 Nov 2023
Proforma of Agreement for saleFile: Yash Enterprises Agreement for Sale.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT FORM 3.pdf26 Nov 2023
Copy of the legal title reportFile: title certificate yash ent_3-5.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERT.pdf23 Nov 2023

How this compares with Thane

4%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DATTU ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KATEMANEVALI7,600+ in Thane

2 kmDATTU ENCLAVECompleted 44Lapsed / revoked 37Other 87Dot size: filed unitsN

Filed coordinates, straight-line distance. 168 registered projects within 2 km.

Builder: YASH ENTERPRISES

YASH ENTERPRISES has 8 registrations on MahaRERA, including TULIP HOMES and NOVELTY HEIGHTS. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DATTU ENCLAVE is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DATTU ENCLAVE?

The registered promoter entity is YASH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DATTU ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DATTU ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DATTU ENCLAVE?

The professionals named in the filing: Architect: CREATIONS; Engineer: DHOKLE & ASSOCIATES; Engineer: SANDEEP V KHANDODE; Engineer: MUKUND WAGHMARE; Chartered Accountant: ASPG & CO; Chartered Accountant: pooja jain associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DATTU ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DATTU ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DATTU ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.