ReraGenieLog inGet a buyer report

Home / Browse projects / Ratnagiri, Maharashtra / Dattakrupa Complex

Completed No litigation declared Others project

Dattakrupa Complex

By Prasad Prabhakar Waghdhare

RG-MH-84127 · RERA P52800015815 · Last updated on MahaRERA portal: 13 Sep 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 8 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
Apr 2023Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

Dattakrupa Complex is a Others project by Prasad Prabhakar Waghdhare in Ratnagiri, Maharashtra, registered with MahaRERA as P52800015815 on 26 Mar 2018. The registration is recorded completed; possession was promised by 30 Apr 2023.

At a glance

Project

  • NameDattakrupa Complex
  • TypeOthers
  • Location
    • Nachane
    • Nachane (CT)
    • Ratnagiri
    • 415612
  • Pincode415612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52800015815
  • ReraGenie IDRG-MH-84127

Builder

  • NamePrasad Prabhakar Waghdhare
  • Entity typeIndividual
  • GSTIN27AAEPW0124D1Z2
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Other registrations9 more →
  • Completed9 of 10
  • Declared earlier projects8 →

Key dates

this monthRegisteredMar 2018PromisedApr 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Mar 2018
  • Promised completion30 Apr 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA70000
Wing BNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Sep 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities16

As on 13 Sep 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Land DevelopmentYes100%

Parking filed2

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots2
Closed/Covered2
BuildingClosed/CoveredTotal
Wing A11
Wing B11

Land and ownership12

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,309 sq m
Land owned byThe promoter, with other names on the file
Named landowners12
LandownerVillageDistrict
Sulbha Manohar KolekarNachane (CT)Ratnagiri
Unnati Umesh KolekarNachane (CT)Ratnagiri
Shubham Umesh kolekarNachane (CT)Ratnagiri
Vijay Monohar KolekarNachane (CT)Ratnagiri
Varsha Vinayak KolekarNachane (CT)Ratnagiri
Aparna Vinayak KolekarNachane (CT)Ratnagiri
Dipti Dilip MudraleTareleSindhudurg
Dipali Chandrkant DambeTareleSindhudurg
Bhakti Bhagwan VinchuNachane (CT)Ratnagiri
Sangita Manohar KolekarNachane (CT)Ratnagiri
Shardanand Bhalchandra BakreChiplun (M Cl)Ratnagiri
Utkarsh Umesh KolekarNachane (CT)Ratnagiri

Approvals and building plan

Permissible FSI1959.97
Proposed, not sanctioned1,934 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShivajinagar Ratnagiri

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGeetanjali V Mote
EngineerSandeep Shetye
PartnerRole in project
Prasad Prabhakar Waghdhare-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Jul 2020

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
PAN CardFile: Pan Card.pdf13 Sep 2021
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf13 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf13 Sep 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf13 Sep 2021
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - BOOKED INVENTORY.pdf13 Sep 2021
Certificates of CA (Form 3)File: C A Certificate.pdf13 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 19 20.pdf13 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20 21.pdf13 Sep 2021
Architect’s Certificate on Completion of Project (Form 4)File: Architect Certificate - Form - 4.pdf13 Sep 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society formation Certificate Dattakrupa Complex.pdf16 Aug 2021
Status of ConveyanceFile: Part 1.pdf10 May 2021
Status of ConveyanceFile: Part 2.pdf10 May 2021
Status of ConveyanceFile: Part 3.pdf10 May 2021
Status of ConveyanceFile: Part 4.pdf10 May 2021
Status of ConveyanceFile: Part 5.pdf10 May 2021
Status of ConveyanceFile: Part 6.pdf10 May 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate.pdf15 Jul 2020
Details of Restarting of Construction work post lockdownFile: Dattakrupa Complex - Covid 19.pdf15 Jul 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf6 Mar 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf6 Mar 2020
Certificates of CA (Form 3)File: C A Certificate.pdf6 Mar 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archtect Certificate.pdf5 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf5 Dec 2019
Certificates of CA (Form 3)File: C A Certificate.pdf5 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf8 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf8 Aug 2019
Certificates of CA (Form 3)File: C A Certificate.pdf8 Aug 2019
Certificates of CA (Form 5)File: Dattakrupa Complex(1).pdf29 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf4 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf4 Feb 2019
Certificates of CA (Form 3)File: C A Certificate.pdf4 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf27 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf27 Oct 2018
Certificates of CA (Form 3)File: CA Certificate.pdf27 Oct 2018
Certificates of CA (Form 5)File: Dattakrupa Complex.pdf29 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate.pdf10 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf10 Jul 2018
Certificates of CA (Form 3)File: C A Certificate.pdf10 Jul 2018
OtherFile: Plinth Complition.pdf10 Jul 2018
Building plan approvalFile: N Permission.pdf17 Mar 2018
Layout approvalFile: Layout A.pdf17 Mar 2018
Layout approvalFile: Layout B.pdf17 Mar 2018
Copy of the legal title reportFile: N search Bakare.pdf17 Mar 2018
Copy of the legal title reportFile: N searchone Kolekar.pdf17 Mar 2018
Details of encumbrancesFile: encumbrance.pdf17 Mar 2018
Copy of Layout Approval (in case of layout)File: Layout A.pdf17 Mar 2018
Copy of Layout Approval (in case of layout)File: Layout B.pdf17 Mar 2018
Building Plan Approval (IOD)File: N Permission.pdf17 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: N Permission.pdf17 Mar 2018
Declaration in FORM BFile: form B.pdf17 Mar 2018
Certificates of CA (Form 3)File: Form 3 CA.pdf17 Mar 2018
Proforma of Allotment letterFile: Agreement to Sale Draft.pdf17 Mar 2018
Proforma of Allotment letterFile: Allotment Letter.pdf17 Mar 2018

Promoter's earlier projects8

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

8 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Suresh SmrutiTilak Ali Ratnagiri20CompletedJan 2018Oct 2017
Omkar SanjivaneeJoshi Paland Ratnagiri29CompletedMay 2017Feb 2017
Vikram prasad ArcadeTilka Lane Ratnagiri43CompletedApr 2017Oct 2016
Vishnupant Jogalekar sankulNear Damale school Maruti mandir Ratnagiri71CompletedMar 2017Jun 2016
Omkar ChaitanyaS V Road Maruti mandir Ratnagiri26CompletedMay 2016Oct 2015
Ganga Niwas AppartmnetShere Naka Ratnagiri37CompletedMay 2014Oct 2013
Omkar Swaroop ApartmentJoshi paland Ratnagiri20CompletedMay 2014Mar 2014
Rukmini ArcadeSahakar nagar Nachane Ratnagiri12CompletedDec 2013Mar 2013

How this compares with Ratnagiri

15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep Dattakrupa Complex on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nachane1,100+ in Ratnagiri

2 kmDattakrupa ComplexCompleted 53Lapsed / revoked 15Other 36Dot size: filed unitsN

Filed coordinates, straight-line distance. 104 registered projects within 2 km.

Builder: Prasad Prabhakar Waghdhare

Prasad Prabhakar Waghdhare has 10 registrations on MahaRERA, including Suresh smruti and D. A. BHOSALE PLAZA. Its filings disclose 8 earlier MahaRERA projects: declares 8 of 8 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if Dattakrupa Complex is delayed beyond 30 Apr 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Dattakrupa Complex?

The registered promoter entity is Prasad Prabhakar Waghdhare, an individual as per the filing. Its GSTIN 27AAEPW0124D1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Dattakrupa Complex?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Dattakrupa Complex?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Dattakrupa Complex?

The professionals named in the filing: Architect: Geetanjali V Mote; Engineer: Sandeep Shetye. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Dattakrupa Complex?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Dattakrupa Complex. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Dattakrupa Complex to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.