Home / Browse projects / Thane, Maharashtra / DALAL SQUARE

Registered No litigation declared Others project

DALAL SQUARE

By ADVANCE BUILD TECH

RG-MH-58144 · RERA P51700080930 · Last updated on MahaRERA portal: 12 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Nov 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

DALAL SQUARE is a Others project by ADVANCE BUILD TECH in Thane, Maharashtra, registered with MahaRERA as P51700080930 on 20 Aug 2025. Possession is promised by 30 Nov 2027.

At a glance

Project

  • NameDALAL SQUARE
  • TypeOthers
  • Location
    • Plot No.:Plot no. 15
    • Village:Katraop
    • Society.:Sai Vishal
    • Survey No.:40/3/13
    • Pin Code:421503
    • Ambernath
    • Ambarnath(M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700080930
  • ReraGenie IDRG-MH-58144

Builder

  • NameADVANCE BUILD TECH
  • Entity typePartnership

Key dates

this monthRegisteredAug 2025PromisedNov 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Aug 2025
  • Promised completion30 Nov 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed95 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Dalal SquareNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Dalal Square: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered19

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area336 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SAI VISHAL CO-OP HOUSING SOCIETY LIMITEDBadlapur (M Cl)Thane

Approvals and building plan

Permissible FSI911.05
Proposed, not sanctioned911 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 63, Panvelkar Pride, M/G/ Road, Ambernath- 421501

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectspoc Architect
EngineerNitin Nandwani
Chartered AccountantSuresh Radhakrishnani
PartnerRole in project
ADVANCE BUILD TECH-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 May 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Nov 2027

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: archit.pdf12 May 2026
Form 2File: eng.pdf12 May 2026
Form 3File: dalal square form 3.pdf12 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD Unsold.pdf12 May 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD LIST OF DALAL SQUARE .pdf10 Mar 2026
Form 3File: Advance Builtech.pdf10 Mar 2026
Form 2File: FORM 2 .pdf10 Mar 2026
Form 1File: FORM- 1 .pdf10 Mar 2026
Copy of the legal title reportFile: Advocate_Contact-06-08-2025-17꞉50.pdf8 Aug 2025
Proforma of Agreement for saleFile: AGREEEMENT FOR SALE_RERA dalal.pdf8 Aug 2025
Copy of the legal title reportFile: Advocate_Contact-06-08-2025-17꞉50.pdf8 Aug 2025
Proforma of Agreement for saleFile: AGREEEMENT FOR SALE_RERA dalal.pdf8 Aug 2025
Copy of the legal title reportFile: Advocate_Contact-06-08-2025-17꞉50.pdf8 Aug 2025
Proforma of Agreement for saleFile: AGREEEMENT FOR SALE_RERA dalal.pdf8 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Jul 2025
CERSAI detailsFile: Cersai Declaration Foarmat Dalal Squere (1).pdf16 Jul 2025
Other - TechnicalFile: declaration annexure - A NEW.pdf16 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Jul 2025
CERSAI detailsFile: Cersai Declaration Foarmat Dalal Squere (1).pdf16 Jul 2025
Other - TechnicalFile: declaration annexure - A NEW.pdf16 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Jul 2025
CERSAI detailsFile: Cersai Declaration Foarmat Dalal Squere (1).pdf16 Jul 2025
Other - TechnicalFile: declaration annexure - A NEW.pdf16 Jul 2025
Disclosure for secured/unsecured finance availed for the projectFile: GetUserDocumentFileContent (4).pdf8 Jul 2025
Disclosure for secured/unsecured finance availed for the projectFile: GetUserDocumentFileContent (4).pdf8 Jul 2025
Disclosure for secured/unsecured finance availed for the projectFile: GetUserDocumentFileContent (4).pdf8 Jul 2025
Proforma of Allotment letterFile: allotment letter_11zon.pdf19 Jun 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: RERA BANK CER ON BUILDER LETTER HEAD.pdf19 Jun 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: NEW RERA ON BANK LETTER HEAD DALAL SQUARE.pdf19 Jun 2025
Proforma of Allotment letterFile: allotment letter_11zon.pdf19 Jun 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: RERA BANK CER ON BUILDER LETTER HEAD.pdf19 Jun 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: NEW RERA ON BANK LETTER HEAD DALAL SQUARE.pdf19 Jun 2025
Proforma of Allotment letterFile: allotment letter_11zon.pdf19 Jun 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: RERA BANK CER ON BUILDER LETTER HEAD.pdf19 Jun 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: NEW RERA ON BANK LETTER HEAD DALAL SQUARE.pdf19 Jun 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CONCERNED TO LEGAL.pdf5 May 2025
Declaration about Commencement CertificateFile: DECLARATION about commencement.pdf5 May 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CONCERNED TO LEGAL.pdf5 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: din sudhakar dalal.pdf5 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: din sonesh dalal.pdf5 May 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CONCERNED TO LEGAL.pdf5 May 2025
Declaration about Commencement CertificateFile: DECLARATION about commencement.pdf5 May 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CONCERNED TO LEGAL.pdf5 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: din sudhakar dalal.pdf5 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: din sonesh dalal.pdf5 May 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES CONCERNED TO LEGAL.pdf5 May 2025
Declaration about Commencement CertificateFile: DECLARATION about commencement.pdf5 May 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCES CONCERNED TO LEGAL.pdf5 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: din sudhakar dalal.pdf5 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: din sonesh dalal.pdf5 May 2025
Declaration in FORM BFile: rera dalal kalash builder.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect cert.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate (2).pdf3 May 2025
CERSAI detailsFile: CERSAI search report.pdf3 May 2025
Declaration in FORM BFile: rera dalal kalash builder.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect cert.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate (2).pdf3 May 2025
CERSAI detailsFile: CERSAI search report.pdf3 May 2025
Declaration in FORM BFile: rera dalal kalash builder.pdf3 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect cert.pdf3 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eng certificate (2).pdf3 May 2025
CERSAI detailsFile: CERSAI search report.pdf3 May 2025
Layout approvalFile: dalal square plan pass.pdf1 May 2025
Building plan approvalFile: dalal square plan pass.pdf1 May 2025
Layout approvalFile: dalal square plan pass.pdf1 May 2025
Building plan approvalFile: dalal square plan pass.pdf1 May 2025
Layout approvalFile: dalal square plan pass.pdf1 May 2025
Building plan approvalFile: dalal square plan pass.pdf1 May 2025
PAN CardFile: ADVANCE BUILD TECH PAN CARD ( SAI VISHAL).pdf1 May 2025
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES.pdf1 May 2025
Copy of Layout Approval (in case of layout)File: dalal square plan pass.pdf1 May 2025
Commencement Certificates / NA Order for plotted developmentFile: dalal square c c paper.pdf1 May 2025
Building Plan Approval / NA Order for plotted developmentFile: dalal square plan pass.pdf1 May 2025
Deviation Report with respect to Allotment letterFile: DEVIATION TO ALLOTMENT LETTER.pdf1 May 2025
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCES.pdf1 May 2025
Other - FinanceFile: DECLARATION OF INTEREST FINANCE CHARGES.pdf1 May 2025
Deviation Report with respect to model copy of AgreementFile: DEVIATION REPORT.pdf1 May 2025
PAN CardFile: ADVANCE BUILD TECH PAN CARD ( SAI VISHAL).pdf1 May 2025
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCES.pdf1 May 2025
Copy of Layout Approval (in case of layout)File: dalal square plan pass.pdf1 May 2025

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DALAL SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambernath7,600+ in Thane

Builder: ADVANCE BUILD TECH

ADVANCE BUILD TECH has 1 registration on MahaRERA, including DALAL SQUARE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if DALAL SQUARE is delayed beyond 30 Nov 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DALAL SQUARE?

The registered promoter entity is ADVANCE BUILD TECH, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DALAL SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DALAL SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DALAL SQUARE?

The professionals named in the filing: Architect: spoc Architect; Engineer: Nitin Nandwani; Chartered Accountant: Suresh Radhakrishnani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DALAL SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DALAL SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DALAL SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.