Completed No litigation declared Residential / Group Housing project

DAKSH ENCLAVE

By R K CONSTRUCTION

RG-MH-68224 · RERA P51600047403 · Last updated on MahaRERA portal: 17 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
2 of 98Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

DAKSH ENCLAVE is a Residential / Group Housing project by R K CONSTRUCTION in Nashik, Maharashtra, registered with MahaRERA as P51600047403 on 27 Oct 2022. The registration is recorded completed; possession was promised by 1 Jun 2027. 96 of the 98 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameDAKSH ENCLAVE
  • TypeResidential / Group Housing
  • Location
    • PATHARDI DEVELALI ROAD
    • PATHARDI
    • Nashik (M Corp.)
    • Nashik
    • 422009
  • Pincode422009
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600047403
  • ReraGenie IDRG-MH-68224

Builder

  • NameR K CONSTRUCTION
  • Entity typePartnership
  • PartnersMAGANBHAI MULJIBHAI LADANI, DARSHNA HIREN BHADJA, HIREN PRABHUDAS BHADJA, PRABHUDAS VITTHAL BHADJA, KETAN MAGANBHAI LADANI, DINESH LALJIBHAI KARAVADIYA
  • Other registrations4 more →
  • Completed3 of 5

Key dates

this monthRegisteredOct 2022PromisedJun 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on27 Oct 2022
  • Promised completion1 Jun 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed70 files

Current status

98%96 of 98 units booked
85.0%Work done, per cost certificate

Figures as on 17 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
DAKSH ENCLAVENA8798098

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

DAKSH ENCLAVE: 70% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed104

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots104
Closed/Covered1
Open Space103

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,463 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on28 Dec 2025

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI7807.83
Proposed, not sanctioned5,887 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSATPUR NASHIK
Estimated costRs 18.20 cr
Cost incurredRs 15.46 cr
Work done84.95%
BuildingWingEstimatedIncurred
DAKSH ENCLAVENARs 18.20 crRs 15.46 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISHWKARMA BHILA SHARDUL
EngineerRAVINDRAKUMAR NAMWAR SINGH
Chartered AccountantRushikesh Vijay Nandapure
Chartered AccountantSimran Kaur Jeetchander Rait
Chartered AccountantANIL KHETAMAL DAHIYA
PartnerRole in project
R K CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jun 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Nov 2024

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2022-2023)File: FORM 5 DAKSH ENCLAVE FY22_23.pdf17 Mar 2026
Form 5 (FY 2023-2024)File: FORM-5- RK-DE-F.pdf17 Mar 2026
Form 5 (FY 2024-2025)File: form-5 RK Enclave.pdf17 Mar 2026
Withdrawal Update Form 1File: _Form 1-Q3-09-02-2026-f.pdf10 Feb 2026
Withdrawal Update Form 2File: _Form 2-Q3-09-02-2026-f.pdf10 Feb 2026
Withdrawal Update Form 3File: Form 3 - 2025.pdf10 Feb 2026
Withdrawal Update Form 1File: Form 1-Q2-f.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2-Q2-f.pdf29 Jan 2026
Withdrawal Update Form 3File: Form 3 - 2025.pdf29 Jan 2026
Withdrawal Update Form 1File: Form 1-Q1-05-07-25 (1).pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2-Q1-05-07-25 (1).pdf23 Jan 2026
Withdrawal Update Form 3File: Form-3 Final.pdf23 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Q3-06-01-25 (1).pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Q4-07-04-25-Enclave.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q3-06-01-25 (1).pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q2-05-10-24 (1).pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q4-07-04-25-Enclave.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form-3.pdf13 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-Q3-06-01-25.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Daksh Avlon Form 2 - 30-09-2024.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Q3-06-01-25.pdf12 Feb 2025
Building plan approvalFile: Complition - enclave plan - 1_compressed.pdf6 Nov 2024
Building plan approvalFile: Complition - enclave plan - 2_compressed (1).pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1-Architect certificate.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1Architect certificate.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Daksh Enclave Dec 23.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1Architect certificate.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1Architect certificate.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2Engineers certificate.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2Engineers certificate.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Daksh Enclave dec 23.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2Engineers certificate.pdf6 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2-Engineers certificate.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Complition - enclave plan - 1_compressed.pdf6 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Complition - enclave plan - 2_compressed (1).pdf6 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complition certificate-AB.pdf6 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 daksh enclave 31_12_22.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 daksh enclave 31_03_23.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 daksh enclave 31_12_22.pdf23 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 daksh enclave 31_03_23.pdf23 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A daksh enclave 31_03_23.pdf23 Nov 2023
Disclosure of sold/ booked inventoryFile: form 2A daksh enclave 31_03_23.pdf23 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 DAKSH ENCLAVE FY22_23.pdf23 Nov 2023
Proforma of Agreement for saleFile: Agrement for sale -1.pdf9 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Model Agreement For Sale-KALMESHBHAI.pdf28 Sep 2022
Deviation Report with respect to model copy of AgreementFile: deviation rport.pdf28 Sep 2022
Details of encumbrances concerned to LegalFile: Self_Declaration.pdf17 Aug 2022
Copy of the legal title reportFile: Daksh Enclave title report.pdf30 Jul 2022
Details of encumbrances concerned to LegalFile: Declaration Regrading Encumbramces.pdf30 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Encumbrances Letter-Bank (2).pdf4 Jul 2022
Deviation Report with respect to Allotment letterFile: Deviation Report of Allotment.pdf4 Jul 2022
Details of encumbrances concerned to LegalFile: Declaration Regrading Encumbramces.pdf29 Jun 2022
Layout approvalFile: lay out-daksh enclave.pdf20 Jun 2022
Building plan approvalFile: plan 1.pdf20 Jun 2022
Building plan approvalFile: plan 2.pdf20 Jun 2022
PAN CardFile: PAN-R K Construction.pdf20 Jun 2022
Copy of the legal title reportFile: Title report.pdf20 Jun 2022
Details of encumbrancesFile: Declaration Regrading Encumbramces.pdf20 Jun 2022
Copy of Layout Approval (in case of layout)File: lay out-daksh enclave.pdf20 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: plan 1.pdf20 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: plan 2.pdf20 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf20 Jun 2022
Declaration about Commencement CertificateFile: Form 32 -declarttion abt comm pdf.pdf20 Jun 2022
Declaration in FORM BFile: FORM B AFFIDAVIT PDF.pdf20 Jun 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect.pdf20 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer.pdf20 Jun 2022
CERSAI detailsFile: Declaration regarding cersai.pdf20 Jun 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 Final-1.pdf20 Jun 2022
Proforma of Agreement for saleFile: allotment letter - DAKSH ENCLAVE final.pdf20 Jun 2022
Proforma of Allotment letterFile: allotment letter - DAKSH ENCLAVE final.pdf20 Jun 2022

How this compares with Nashik

98%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep DAKSH ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PATHARDI4,100+ in Nashik

2 kmDAKSH ENCLAVECompleted 119Lapsed / revoked 24Other 79Dot size: filed unitsN

Filed coordinates, straight-line distance. 222 registered projects within 2 km.

Builder: R K CONSTRUCTION

R K CONSTRUCTION has 5 registrations on MahaRERA, including R.K. MAJESTIC and DAKSH ROYAL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if DAKSH ENCLAVE is delayed beyond 1 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of DAKSH ENCLAVE?

The registered promoter entity is R K CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in DAKSH ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for DAKSH ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at DAKSH ENCLAVE?

The professionals named in the filing: Architect: VISHWKARMA BHILA SHARDUL; Engineer: RAVINDRAKUMAR NAMWAR SINGH; Chartered Accountant: Rushikesh Vijay Nandapure; Chartered Accountant: Simran Kaur Jeetchander Rait; Chartered Accountant: ANIL KHETAMAL DAHIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in DAKSH ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About DAKSH ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save DAKSH ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.