Home / Browse projects / Thane, Maharashtra / CYBER CODE

Registered No litigation declared Commercial project

CYBER CODE

By GREENSCAPE REALTY

RG-MH-12749 · RERA P51700022442 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • Completion date moved by 15 months
  • 2 extensions taken
  • Rs 130.00 crore secured on the land, in favour of Axis Finance Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
5 of 11Construction stages donefurthest along: Stilt Floor, 90%
41 of 238Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 141 documents Report an error

CYBER CODE is a Commercial project by GREENSCAPE REALTY in Thane, Maharashtra, registered with MahaRERA as P51700022442 on 24 Sep 2019. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 15 months from the original filing. 197 of the 238 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameCYBER CODE
  • TypeCommercial
  • Location
    • THANE - BELAPUR ROAD
    • T.T.C INDUSTRIAL AREA
    • VILLAGE - SHIRAVANE
    • Navi Mumbai (M Corp.)
    • Thane
    • 400706
  • Pincode400706
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700022442
  • ReraGenie IDRG-MH-12749

Builder

  • NameGREENSCAPE REALTY
  • Entity typePartnership
  • PartnersSURESH AMBAVI WAVIA, JAYESH AMBAVI VAVIA

Key dates

1 months past promisethis monthRegisteredSep 2019First promiseJun 2025Revised toSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Sep 2019
  • Promised completion30 Sep 2026
  • Revised completionRevised to 30 Sep 2026 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed141 files

Current status

83%197 of 238 units booked
66.1%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CYBER CODENA32230238238

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

CYBER CODE: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks88%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes75%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes70%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed586

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots586
Closed/Covered586

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,400 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofAxis Finance Ltd
Secured amountRs 130.00 crore
CERSAI search filedYes
Declared on23 Jul 2026

Approvals and building plan

Sanctioning authorityMAHARASHTRA INDUSTRIAL DEVELOPMENT CORPORATION
Permissible FSI34020.0
Proposed, not sanctioned25,429 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVARDHAMAN CHAMBERS CO-OP-SO PLOT NO 84, SECTOR 17, VASHI,
Estimated costRs 127.94 cr
Cost incurredRs 84.54 cr
Work done66.08%
BuildingWingEstimatedIncurred
CYBER CODENARs 108.52 crRs 84.54 cr
-NARs 19.43 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSoyuz Talib Architects
EngineerDr. B.L. Agrawal & Associates
EngineerKunal Jadhav
Chartered AccountantNAINA JAIN
Chartered AccountantChetan Joshi & Co.
PartnerRole in project
GREENSCAPE REALTY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700028417Jun 2025 → Dec 2025

Reason as filed by the promoterThe original timeline for completion has been impacted due to delays in obtaining necessary statutory permissions, which were beyond our control. Despite these challenges, we have made significant progress, with the project currently over 95% complete and in its final stages. To substantiate this, we have attached recent site images for your reference. Our team is working diligently to expedite the remaining work and ensure timely fulfillment of all regulatory obligations. Given the circumstances, we kindly request your approval for an extension until 31st December 2025 to complete the project

EA07012619332Jun 2025 → Sep 2026

Reason as filed by the promoterThe progress of the project slowed due to various reasons which overall impacted the timely completion of the Project, such as Covid 19 and contractor-related challenges, which affected the continuity of work. We faced operational setbacks due to labour shortages, and gaps in coordination among subcontractors. These issues affected adherence to planned schedules and slowed overall execution of the work. Throughout this period, we continued to prioritize the interests of our allottees. We assure you that the delays were never due to negligence but due to circumstances beyond our immediate contr

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Sep 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 May 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed141

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 141 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Cyber Code - Form 1 - June 2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Cyber Code - Form 2 - June 2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Cyber Code - Form 3 - June 2026.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: Cyber Code Form - 2A (2025-26).pdf30 Jun 2026
Form 2A (FY 2024-2025)File: Form 2A -Cyber Code For FY 2024-25.pdf15 Jun 2026
Layout approvalFile: Page 1 - Floor Plans (Highlighted) (Permissible and Sanctioned BUA) (Parking) (1).pdf25 May 2026
Building plan approvalFile: Page 2 - Floor Plans.pdf25 May 2026
Building plan approvalFile: Page 3 - Floor Plans.pdf25 May 2026
Building plan approvalFile: Page 4 - Floor Plans.pdf25 May 2026
Building plan approvalFile: Page 5 - Floor Plans.pdf25 May 2026
Building plan approvalFile: Page 6 - Floor Plans.pdf25 May 2026
Building plan approvalFile: Page 7 - Floor Plans.pdf25 May 2026
Building plan approvalFile: Page 8 - Elevation.pdf25 May 2026
Building plan approvalFile: Page 8 - Elevation.pdf25 May 2026
Building plan approvalFile: Page 9 - Elevation.pdf25 May 2026
Withdrawal Update Form 1File: Form 1 - Cyber Code as on March 2026.pdf21 May 2026
Withdrawal Update Form 2File: Form 2 - Cyber Code as on March 2026.pdf21 May 2026
Withdrawal Update Form 3File: New Form 3 - Cyber code as on march 2026_compressed.pdf21 May 2026
Withdrawal Update Form 1File: Form 1 - Cyber Code as on Dec 2025.pdf10 Feb 2026
Withdrawal Update Form 2File: Form 2 - Cyber Code as on Dec 2025.pdf10 Feb 2026
Withdrawal Update Form 3File: Form 3 - Cyber Code as on Dec 2025.pdf10 Feb 2026
Withdrawal Update Form 1File: Form 1 - Cyber Code as on Sep 2025.pdf10 Dec 2025
Withdrawal Update Form 2File: Form 2 - Cyber Code as on Sep 2025.pdf10 Dec 2025
Withdrawal Update Form 3File: Form 3 - Cyber Code as on Sep 2025.pdf10 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 - Cyber Code FY 2024-25.pdf8 Dec 2025
Withdrawal Update Form 1File: Form 1 - Cyber Code as on June 2025.pdf17 Sep 2025
Withdrawal Update Form 1File: Form 1 - Cyber Code as on June 2025.pdf17 Sep 2025
Withdrawal Update Form 2File: Form 2 - Cyber Code as on June 2025.pdf17 Sep 2025
Withdrawal Update Form 2File: Form 2 - Cyber Code as on June 2025.pdf17 Sep 2025
Withdrawal Update Form 3File: Form 3 - Cyber Code as on June 2025.pdf17 Sep 2025
Withdrawal Update Form 3File: Form 3 - Cyber Code as on June 2025.pdf17 Sep 2025
Layout approvalFile: Layout Plan.pdf3 Sep 2025
Building plan approvalFile: Layout Plan.pdf3 Sep 2025
Form 1File: Form 1 - Cyber Code as on June 2025.pdf1 Sep 2025
Form 2File: Form 2 - Cyber Code as on June 2025.pdf1 Sep 2025
Form 3File: Form 3 - Cyber Code as on June 2025.pdf1 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Cyber Code as on June 2025.pdf1 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Cyber Code Form 3- 310325.pdf13 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Cyber Code Form 3- 310325.pdf13 Jun 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - 31032025_11zon.pdf13 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Cyber Code as on March 2025.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Cyber Code as on March 2025.pdf8 May 2025
Details of encumbrancesFile: Encumbrance Letter.pdf1 May 2025
Declaration in FORM BFile: Form B (1)11.pdf1 May 2025
Disclosure of sold/ booked inventoryFile: Circular 29 WITH SIGN_11zon (2).pdf1 May 2025
CERSAI detailsFile: CERSAI Declaration (1).pdf1 May 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A (1).pdf1 May 2025
Other - TechnicalFile: PERT CHART.pdf1 May 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf1 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Cyber Code as on December 2024.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Cyber Code as on December 2024.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 2021.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 2024.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 2021.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 2020.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec 2019.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sep 2021.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sep 2020.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sep 2019.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 2024.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 2022.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 2021.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: June 2020.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 2022.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 2020.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2021.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - March 2022.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 2022.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Cyber Code as on March 2021.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Cyber Code as on June 2022.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Cyber Code as on June 2024.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf16 Apr 2025
Details of encumbrancesFile: Revised Encumbrance Declaration.pdf17 Feb 2025
Details of encumbrancesFile: Encumbrance Declaration AFL Cyber Code.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 CYBER CODE Sept Quarter.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Cyber Code as on December 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Cyber Code as on December 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CYBER CODE Sept Quarter.pdf20 Jan 2025

How this compares with Thane

83%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 15 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CYBER CODE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near T.T.C INDUSTRIAL AREA, VILLAGE - SHIRAVANE7,600+ in Thane

2 kmCYBER CODECompleted 3Lapsed / revoked 3Other 48Dot size: filed unitsN

Filed coordinates, straight-line distance. 54 registered projects within 2 km.

Builder: GREENSCAPE REALTY

GREENSCAPE REALTY has 1 registration on MahaRERA, including CYBER CODE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if CYBER CODE is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CYBER CODE?

The registered promoter entity is GREENSCAPE REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CYBER CODE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CYBER CODE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CYBER CODE?

The professionals named in the filing: Architect: Soyuz Talib Architects; Engineer: Dr. B.L. Agrawal & Associates; Engineer: Kunal Jadhav; Chartered Accountant: NAINA JAIN; Chartered Accountant: Chetan Joshi & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CYBER CODE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CYBER CODE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CYBER CODE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.