CRYSTAL TOWER

By SANTOSH KAKASAHEB PATHADE

RG-MH-19188 · RERA P52100078251 · Last updated on MahaRERA portal: 29 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Stilt Floor, 50%
29 of 29Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 38 documents Report an error

CRYSTAL TOWER is a Others project by SANTOSH KAKASAHEB PATHADE in Pune, Maharashtra, registered with MahaRERA as P52100078251 on 29 Nov 2024. Possession is promised by 31 May 2027. 0 of the 29 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameCRYSTAL TOWER
  • TypeOthers
  • Location
    • NEAR TALEGAON CHAKAN RD
    • VADGAON MAVAL
    • Wadagaon (CT)
    • Mawal
    • Pune
    • 412106
  • Pincode412106
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078251
  • ReraGenie IDRG-MH-19188

Builder

  • NameSANTOSH KAKASAHEB PATHADE
  • Entity typeIndividual
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2024PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Nov 2024
  • Promised completion31 May 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed38 files

Current status

0%0 of 29 units booked
40.0%Work done, per cost certificate

Figures as on 29 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CRYSTAL TOWERNA7723629

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 50%.

CRYSTAL TOWER: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor50%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes50%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered1
Open Space31

Land and ownership10

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area613 sq m
Land owned byThe promoter, with other names on the file
Named landowners10
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jul 2025
LandownerVillageDistrict
PRATIKSHA NARESH RATHODWadagaon (CT)Pune
ASHISHKUMAR SHUKLATalegaon Dabhade (R)Pune
SNEHAL SHARAD GIDDEGoudwadiSolapur
SANJAY BHIKARAM BORITKARTalegaon Dabhade (R)Pune
SANGITA MARUTI PUKALETalegaon Dabhade (R)Pune
SUVARNA SACHIN WAGHOLEDelvadiPune
SUPRIYA SANJAY BORITKARTalegaon Dabhade (R)Pune
SUJIT RAJARAM MAZIRESatePune
LALITA AMOL KARANDESatePune
RAJASHRI SUJIT MAZIREBrahmanwadi (555916)Pune

Approvals and building plan

Sanctioning authorityVADGAON NAGARPANCHAYAT
Permissible FSI1356.58
Proposed, not sanctioned1,357 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO.2, GROUND FLOOR, KATE CENTRAL, SURVEY NO.48/1/1 & 48/2/1, KATE PURAM CHOWK, PIMPLE GURAV, PUNE-411061
Estimated costRs 4.62 cr
Cost incurredRs 1.85 cr
Work done40.0%
BuildingWingEstimatedIncurred
CRYSTAL TOWERNARs 4.07 crRs 1.63 cr
-NARs 55.00 lakhRs 22.00 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY PATIL
EngineerSAIE ENGINEERS AND ALLIED DESIGNERS
Chartered AccountantR M DANGI AND CO
PartnerRole in project
SANTOSH KAKASAHEB PATHADE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed38

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architect Letter March (Crystal).pdf29 Jul 2025
Form 2File: Engineers Letter March (Crystal).pdf29 Jul 2025
Form 3File: CT Form 3 March 2025.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: Unsold Inventory Crystal Tower march 2025.pdf29 Jul 2025
Form 1File: Architect Form 1 CT (2)_compressed (1).pdf26 Jul 2025
Form 2File: Engineers Crystal Tower Form 2.pdf26 Jul 2025
Form 3File: CA form 3 Crystal Tower (2)_compressed.pdf26 Jul 2025
Disclosure of Sold and Booked InventoryFile: CT Unsold Dec 2024.pdf26 Jul 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A 22112024.pdf22 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Diclaration Of Land Cost.pdf21 Nov 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Revised Format A 25102024.pdf25 Oct 2024
Other - FinanceFile: Gidde Decaration.pdf13 Aug 2024
Other - FinanceFile: Decalaration For Bank Account.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA form 3 Crystal Tower_compressed (2).pdf8 Aug 2024
Other - LegalFile: Architect Form 1 CT (2)_compressed (1).pdf8 Aug 2024
Copy of the legal title reportFile: Plot no 56 Legal Title Report For RERA.pdf31 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Unsecured laon CT.pdf31 Jul 2024
Proforma of Allotment letterFile: Allotment Performa New format.pdf20 Jul 2024
Proforma of Agreement for saleFile: CRYSTAL TOWER PROJECT JAWALESHWAR CONSTRUCTION PLOT NO 56 SR NO 112 R dRAFT.pdf20 Jul 2024
Declaration about Commencement CertificateFile: Format D CT.pdf17 Jul 2024
Other - TechnicalFile: Offical Mail ID Latter.pdf8 Jul 2024
Other - TechnicalFile: Offical Mail ID Latter.pdf8 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Decalaration.pdf8 Jul 2024
Building plan approvalFile: CRYSTAL TOWER SANCTION PLAN .pdf30 Jun 2024
Layout approvalFile: CRYSTAL TOWER SANCTION PLAN .pdf30 Jun 2024
Details of encumbrances concerned to FinanceFile: EC Crystal tower.pdf30 Jun 2024
Copy of Layout Approval (in case of layout)File: CRYSTAL TOWER SANCTION PLAN .pdf30 Jun 2024
Declaration in FORM BFile: Form B Plot no 56_compressed.pdf30 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Crystal tower Architects form 1_compressed.pdf30 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Crystal Tower Form 2_compressed.pdf30 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CRYSTAL TOWER ORDER (1).pdf30 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: CRYSTAL TOWER SANCTION PLAN .pdf30 Jun 2024
CERSAI detailsFile: cersai.pdf30 Jun 2024
Deviation Report with respect to Allotment letterFile: Daviation about Allotment.pdf30 Jun 2024
Details of encumbrances concerned to LegalFile: EC Crystal tower.pdf30 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Daviation of agreement to sale.pdf30 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in other Organisations CT.pdf30 Jun 2024
PAN CardFile: Santosh patjade Pan Card.pdf27 Jun 2024

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CRYSTAL TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VADGAON MAVAL13,700+ in Pune

2 kmCRYSTAL TOWERCompleted 31Lapsed / revoked 30Other 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 87 registered projects within 2 km.

Builder: SANTOSH KAKASAHEB PATHADE

SANTOSH KAKASAHEB PATHADE has 3 registrations on MahaRERA, including MILESTONE and CRYSTAL TOWER. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if CRYSTAL TOWER is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CRYSTAL TOWER?

The registered promoter entity is SANTOSH KAKASAHEB PATHADE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CRYSTAL TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CRYSTAL TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CRYSTAL TOWER?

The professionals named in the filing: Architect: AJAY PATIL; Engineer: SAIE ENGINEERS AND ALLIED DESIGNERS; Chartered Accountant: R M DANGI AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CRYSTAL TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CRYSTAL TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CRYSTAL TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.