ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Crystal Tower

Completed No litigation declared Residential / Group Housing project

Crystal Tower

By KSHITIJ PROMOTERS AND DEVELOPERS

RG-MH-02208 · RERA P52100000082 · Last updated on MahaRERA portal: 15 Jul 2021

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
29 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 95%
1Complaints at MahaRERAon this registration
Jump to the 29 documents Report an error

Crystal Tower is a Residential / Group Housing project by KSHITIJ PROMOTERS AND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100000082 on 28 Jun 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameCrystal Tower
  • TypeResidential / Group Housing
  • Location
    • Near D P road
    • Pashan
    • Haveli
    • Pune
    • 411045
  • Pincode411045
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000082
  • ReraGenie IDRG-MH-02208

Builder

  • NameKSHITIJ PROMOTERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersNITIN VAIDYA, VINAYAK DATTATRAY GOKHALE, RAJENDRA GAJANAN KANE, DILIP JAYAWANTRAO MOHITE, PRAMOD JAYAWANTRAO MOHITE, ANANT GHALSASI, MEENA GHALSASI, VILAS KARANDIKAR

Key dates

this monthRegisteredJun 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jun 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings3 building records
  • Documents filed29 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
FNA140000
GNA140000
HNA140000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 15 Jul 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 95%.

F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
G90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
H91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities18

As on 15 Jul 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
SWIMMING POOLYes100%
PODIUM GARDENYes100%
CLUB HOUSEYes100%

Parking filed184

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots184
Closed/Covered157
Open Space27
BuildingClosed/CoveredOpen SpaceTotal
F47148
G551368
H551368

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,705 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI11399.33
Proposed, not sanctioned8,650 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHANDARKAR ROAD PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANIRUDDHA VAIDYA & ASSOCIATES
EngineerS W Mone and Associates
PartnerRole in project
KSHITIJ PROMOTERS AND DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100001376Dec 2019 → Dec 2020

Reason as filed by the promoterCompletion of Buildings F and H of this Project was received on 21/08/2018 vide OCC/0672/18. Sanction for upper floors of Building G has been obtained on 07/01/2019 vide CC/3109/18. Considering this fact, it is estimated that building G shall be completed by 30/12/2020. This project shall be completed in all respects by December 2020.

Litigation declared1

CaseCourtStatus
CC005000000011063/2018Maharashtra Real Estate Regulatory AuthorityTHE COMPLAINANT HAS WITH DRAWN THE COMPLAINT AND THE MATTER IS DISPOSED OF AS WITHDRAWN ON TWENTY FO

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000011063Swapnil KekreShrikant Paranjape20/02/2018

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed29

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Proforma of Allotment letterFile: 1 6 CRYSTAL TOWER BLDG FGH Ready Possession for Rera Upload.pdf15 Jul 2021
Copy of the legal title reportFile: Title Certificate Crystal Tower 06July2021.pdf7 Jul 2021
Architect’s Certificate on Completion of Project (Form 4)File: Combine Crystal towers Form 4 and completion certificate uploded.pdf29 Apr 2021
Certificates of CA (Form 5)File: Form 5-Crystal Tower- Sept 2020.pdf30 Sep 2020
Certificates of CA (Form 5)File: Crystal Tower_Form 5.pdf23 Oct 2019
OtherFile: Environmental Clearnace-Crystal Tower_30-10-2018.pdf9 May 2019
Certificates of CA (Form 5)File: Crystal Tower.pdf6 Oct 2018
Layout approvalFile: Crystal Tower - Layout updated 260917.pdf20 Jul 2018
Building plan approvalFile: Crystal Tower - IOD updated 260917.pdf20 Jul 2018
Copy of Layout Approval (in case of layout)File: Crystal Tower - Layout updated 260917.pdf20 Jul 2018
Building Plan Approval (IOD)File: Crystal Tower - IOD updated 260917.pdf20 Jul 2018
Commencement Certificates / NA Order for plotted developmentFile: Crystal Tower - CC updated 260917.pdf20 Jul 2018
Declaration in FORM BFile: Form B_Crystal Tower.pdf22 Jun 2017
Certificates of CA (Form 3)File: Form 3 - Crystal Tower.pdf22 Jun 2017
Proforma of Allotment letterFile: Proforma_Allotment Ltr and Agreement_Crystal Tower.pdf22 Jun 2017
Layout approvalFile: Sanction layout page 01.pdf21 Jun 2017
Layout approvalFile: Sanction layout page 02.pdf21 Jun 2017
Building plan approvalFile: Sanction layout page 01.pdf21 Jun 2017
Building plan approvalFile: Sanction layout page 02.pdf21 Jun 2017
PAN CardFile: Kshitij Prmoters developers.pdf21 Jun 2017
Copy of the legal title reportFile: Title Certificate Crystal Towers.pdf21 Jun 2017
Details of encumbrancesFile: Encumbrance Certificate Crystal Tower.pdf21 Jun 2017
Copy of Layout Approval (in case of layout)File: Sanction layout page 01.pdf21 Jun 2017
Copy of Layout Approval (in case of layout)File: Sanction layout page 02.pdf21 Jun 2017
Building Plan Approval (IOD)File: Sanction layout page 01.pdf21 Jun 2017
Building Plan Approval (IOD)File: Sanction layout page 02.pdf21 Jun 2017
Commencement Certificates / NA Order for plotted developmentFile: CC Crystal Towers.pdf21 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CRYSTAL RERA FORM-1.PDF21 Jun 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Crystal Towers.pdf21 Jun 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Crystal Tower on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pashan13,700+ in Pune

2 kmCrystal TowerCompleted 79Lapsed / revoked 27Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 224 registered projects within 2 km.

Builder: KSHITIJ PROMOTERS AND DEVELOPERS

KSHITIJ PROMOTERS AND DEVELOPERS has 1 registration on MahaRERA, including Crystal Tower. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Crystal Tower is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Crystal Tower?

The registered promoter entity is KSHITIJ PROMOTERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Crystal Tower?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Crystal Tower?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Crystal Tower?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Crystal Tower?

The professionals named in the filing: Architect: ANIRUDDHA VAIDYA & ASSOCIATES; Engineer: S W Mone and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Crystal Tower?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Crystal Tower. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Crystal Tower to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.