Crown Park

By Greenworld Developers

RG-MH-05443 · RERA P51700051978 · Last updated on MahaRERA portal: 5 Jun 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 1 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

Crown Park is a Others project by Greenworld Developers in Thane, Maharashtra, registered with MahaRERA as P51700051978 on 13 Jul 2023. The registration is recorded completed; possession was promised by 29 Jan 2025. The completion date has moved by 1 months from the original filing.

At a glance

Project

  • NameCrown Park
  • TypeOthers
  • Location
    • Kalyan
    • Kalyan West
    • Chikanghar
    • Thane
    • 421301
  • Pincode421301
  • RERA no.P51700051978
  • ReraGenie IDRG-MH-05443

Builder

  • NameGreenworld Developers
  • Entity typePartnership
  • PartnersRicha Ajit Cheyaden, Rachel Ajit Cheyaden

Key dates

this monthRegisteredJul 2023First promiseDec 2024Revised toJan 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Jul 2023
  • Promised completion29 Jan 2025
  • Revised completionRevised to 29 Jan 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed79 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Crown ParkNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Crown Park: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered21
Open Space10

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area640 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Santhosh Vihar Co Operative Housing Society LtdChikangharThane

Approvals and building plan

Permissible FSI2678.68
Proposed, not sanctioned2,679 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKalyan Branch 5, 6, 7 and 8, Vijayant , Sawant Complex, Karnik Road, Opp Elite Classes, Kalyan west

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Greenworld Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700027849Dec 2024 → Jan 2025

Reason as filed by the promoterWe, M/s. Greenworld Developers, hereby declare the following with respect to the project Crown Park bearing registration number. P51700051978 registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, we received the Occupation Certificate (OC) on 29th January 2025 and we have initiated the process for the possession as well, hence we won't be required to upload consents. To provide assurance and facilitate a smooth completion process, we are closely monitoring the remaining activities, ensuring t

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jun 2025

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2 Occupancy Certificate_ Completion Certificate_ Architect's certificate of completion for5 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: P51700051978_FileName_1 (1).pdf27 Mar 2025
Declaration in FORM BFile: Form B (1).pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: GGGGGGGGGGGGGGGGGGGGD.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: MARCH 3.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: JUNE 3.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SEPT 3.pdf11 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DEC 2024 3.pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Engineer’s Certificate on Cost Incurred on Project (Form 2) (3).pdf11 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf11 Mar 2025
Disclosure of sold/ booked inventoryFile: Circular.pdf11 Mar 2025
Declaration about Commencement CertificateFile: Format D.pdf11 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 23-24_compressed (1).pdf11 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2324.pdf11 Mar 2025
Layout approvalFile: Plan 1.pdf17 Feb 2025
Building plan approvalFile: Plan 2.pdf17 Feb 2025
Building plan approvalFile: Plan 3.pdf17 Feb 2025
Copy of Layout Approval (in case of layout)File: Plan 1.pdf17 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf17 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Plan 3.pdf17 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: F4 (7).pdf5 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Crown Park_OC_Cert (1).pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Crown Park as on December 2024.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Crown Park as on December 2024.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Crown Park as on December 2024.pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Crown Park as on Sep 24.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Crown Park as on Sep 2024.pdf15 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Crown Park as on Sep 2024.pdf15 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 of Crown Park FY23-24.pdf8 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Crown Park - June 2024.pdf18 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Crown Park - June 2024.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Crown Park - June 2024.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Crown Park as on Sep 2023.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Crown Park as on Dec 2023.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Crown Park as on March 2024.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Crown Park as on September 2023.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Crown Park as on December 2023.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Crown Park as on March 2024.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Crown Park as on September 2023.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Crown Park as on December 2023.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Crown Park as on March 2024.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Crown Park - September 2023.pdf25 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Crown Park - December 2023.pdf25 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Crown Park - March 2024.pdf25 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Crown Park - September 2023.pdf25 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Crown Park - December 2023.pdf25 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Crown Park - March 2024.pdf25 May 2024
Layout approvalFile: Page 1_compressed.pdf18 May 2024
Copy of Layout Approval (in case of layout)File: Page 1_compressed.pdf18 May 2024
Building plan approvalFile: SANT CC D1.pdf27 Jul 2023
Building plan approvalFile: SANT CC D2.pdf27 Jul 2023
Building plan approvalFile: SANT CC D3.pdf27 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: SANT CC D1.pdf27 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: SANT CC D2.pdf27 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: SANT CC D3.pdf27 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: SANTOSH CC.pdf27 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: SANTOSH CC.pdf5 Jul 2023
Details of encumbrances concerned to FinanceFile: Encumbrance -Finance.pdf8 May 2023
Details of encumbrances concerned to FinanceFile: Encumbrance -Legal.pdf8 May 2023
Details of encumbrances concerned to LegalFile: Encumbrance -Finance.pdf8 May 2023
Details of encumbrances concerned to LegalFile: Encumbrance -Legal.pdf8 May 2023
Declaration about Commencement CertificateFile: Format D new.pdf8 May 2023
Declaration in FORM BFile: Promoter Form B Notarized_compressed.pdf8 May 2023
CERSAI detailsFile: Cersai Declartation.pdf8 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf8 May 2023
Proforma of Agreement for saleFile: AFS_Crown Park_Greenworld Developers_17042023.pdf8 May 2023
Proforma of Allotment letterFile: Allotment Letter_Crown Park_Greenworld Developers_17042023.pdf8 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format -A.pdf8 May 2023
Deviation Report with respect to Allotment letterFile: ALLOT-DEVIATION 21-Apr-2023 16-52-53.pdf8 May 2023
Deviation Report with respect to model copy of AgreementFile: AFS DEVIATION 21-Apr-2023 16-49-11.pdf8 May 2023
Layout approvalFile: Highlighted Sanctioned Plan_Compressed.pdf25 Apr 2023
Building plan approvalFile: Highlighted Sanctioned Plan_Compressed.pdf25 Apr 2023
Copy of Layout Approval (in case of layout)File: Highlighted Sanctioned Plan_Compressed.pdf25 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Highlighted Sanctioned Plan_Compressed.pdf25 Apr 2023
Copy of the legal title reportFile: Title Report.pdf20 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf18 Apr 2023
PAN CardFile: GW PAN.pdf14 Apr 2023

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 1 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Crown Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan West7,600+ in Thane

Builder: Greenworld Developers

Greenworld Developers has 1 registration on MahaRERA, including Crown Park. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Crown Park is delayed beyond 29 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Crown Park?

The registered promoter entity is Greenworld Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Crown Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Crown Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Crown Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Crown Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Crown Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.