ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Courtyard - Asteria C

Completed No litigation declared Commercial project

Courtyard - Asteria C

By COURTYARD REAL ESTATE PRIVATE LIMITED

RG-MH-72233 · RERA P51700048420 · Last updated on MahaRERA portal: 19 Apr 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 5 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Staircases, 85%
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

Courtyard - Asteria C is a Commercial project by COURTYARD REAL ESTATE PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700048420 on 3 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2027.

At a glance

Project

  • NameCourtyard - Asteria C
  • TypeCommercial
  • Location
    • Pokhran Road No. 2
    • Majiwade
    • Thane (M Corp.)
    • Thane
    • 400610
  • Pincode400610
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700048420
  • ReraGenie IDRG-MH-72233

Builder

  • NameCOURTYARD REAL ESTATE PRIVATE LIMITED
  • Entity typeCompany
  • DirectorsGOPAL MADHAWDAS NARANG, SOHAM GOPAL NARANG, ADVAIT GOPAL NARANG, NAVIN AMARLAL MAKHIJA, MANOHAR MOOLCHAND CHHABRIA
  • Other registrations7 more →
  • Completed6 of 8
  • Declared earlier projects5 →

Key dates

this monthRegisteredJan 2023PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on3 Jan 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Courtyard - Asteria C RetailNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 85%.

Courtyard - Asteria C Retail: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises50%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.25%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 19 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,033 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2883.82
Proposed, not sanctioned2,884 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIFB BRANCH, ANDHERI EAST

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAAKAAR
ArchitectKAPADIA ASSOCIATES DESIGN LLP
EngineerJW Consultant LLP
Chartered AccountantHARSH RUPARELIA & CO
PartnerRole in project
COURTYARD REAL ESTATE PRIVATE LIMITED-

Litigation declared1

CaseCourtStatus
591 of 2017/2017BOMBAY HIGH COURTPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Nov 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Nov 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 Mar 2024

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Engineer Certificate -Asteria C.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_CA Certificate-Asteria C.pdf19 Apr 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AsteriaC_OC_With TMC letter.pdf11 Mar 2024
Architect’s Certificate on Completion of Project (Form 4)File: Asteria C_Form 4_1.pdf11 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AsteriaC_OC.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Asteria C_Dec23.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Asteria C_DeC23 .pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Asteria C_Dec23 .pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Asteria C_Signed.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Asteria C_Sept23 .pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Asteria C_Sept23 .pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5-Asteria C.pdf13 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Asteria C_Signed_June23.pdf20 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Asteria C_Signed_June23.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Asteria C _June 23_Signed.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Asteria C_Signed.pdf22 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Asteria C_Signed.pdf22 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Asteria C_Signed.pdf22 Jun 2023
Proforma of Allotment letterFile: Draft allotment letter Asteria-C 20-12-2022.pdf14 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance - Legal and Finance (Asteria C - Retail).pdf9 Dec 2022
Details of encumbrances concerned to LegalFile: Encumbrance - Legal and Finance (Asteria C - Retail).pdf9 Dec 2022
CERSAI detailsFile: CERSAI Declaration 06-12-2022.pdf6 Dec 2022
Deviation Report with respect to Allotment letterFile: Deviation Allotment letter (Asteria C)- 22-12-2022.pdf1 Dec 2022
Deviation Report with respect to model copy of AgreementFile: AFS Asteria- C (Deviation) 22-12-2022_Page1.pdf1 Dec 2022
Deviation Report with respect to model copy of AgreementFile: AFS Asteria- C (Deviation) 22-12-2022_Page2.pdf1 Dec 2022
Declaration in FORM BFile: Form B (Affidavit Cum Declaration) - Asteria C (Retail).pdf30 Nov 2022
Proforma of Agreement for saleFile: Draft AFS-Retail-Asteria-C - 20-12-2022.pdf30 Nov 2022
Layout approvalFile: Layout Plan with marking.pdf29 Nov 2022
Layout approvalFile: Survey Declaration 31-10-22.pdf29 Nov 2022
Copy of Layout Approval (in case of layout)File: Layout Plan with marking.pdf29 Nov 2022
Copy of Layout Approval (in case of layout)File: Survey Declaration 31-10-22.pdf29 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (Retail,Ph 8)- Upto 31-10-2022 _ Signed.pdf29 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Asteria C - Sept 22_Signed_compressed.pdf29 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Seperate Bank Accounts - Asteria C.pdf29 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance - Finance (Asteria C - Retail).pdf24 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance - Finance (Asteria C - Retail).pdf24 Nov 2022
Declaration about Commencement CertificateFile: Declaration about Commencement Certificate - Asteria C (Retail).pdf24 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 (Engineers Certificate) - Asteria C Retail till 31-10-2022.pdf24 Nov 2022
Building plan approvalFile: Sanction of Development.pdf21 Nov 2022
Building plan approvalFile: Sanction of Development Plans - 01.pdf21 Nov 2022
Building plan approvalFile: Sanction of Development Plans - 02.pdf21 Nov 2022
Building plan approvalFile: Sanction of Development Plans - 03.pdf21 Nov 2022
Building plan approvalFile: Sanction of Development Plans - 04.pdf21 Nov 2022
Building plan approvalFile: Sanction of Development Plans - 05.pdf21 Nov 2022
Layout approvalFile: Layout Plan (Sanctioned).pdf21 Nov 2022
PAN CardFile: PAN Card Courtyard.pdf21 Nov 2022
Copy of the legal title reportFile: Courtyard - Rera Legal Report 11-11-2022.pdf21 Nov 2022
Copy of the legal title reportFile: Courtyard - Title Certficate 28-10-2022.pdf21 Nov 2022
Copy of the legal title reportFile: 7-12 - Courtyard 01-11-2022.pdf21 Nov 2022
Copy of Layout Approval (in case of layout)File: Layout Plan (Sanctioned).pdf21 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction of Development.pdf21 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction of Development Plans - 01.pdf21 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction of Development Plans - 02.pdf21 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction of Development Plans - 03.pdf21 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction of Development Plans - 04.pdf21 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Sanction of Development Plans - 05.pdf21 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf21 Nov 2022

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Courtyard - RozanneRozanne Building No. 3 Majiwade Polkharan Road No. 2 Thane West 4006101CompletedMay 2023Apr 2022
Courtyard - OrnellaOrnella Building No. 7 Majiwade Polkharan Road No. 2 Thane West 4006101CompletedMay 2021Nov 2019
Courtyard - OnyxOnyx Building No. 5 Majiwade Polkharan Road No. 2 Thane West 4006101CompletedMay 2021Nov 2019
Courtyard - IvyIvy Building No. 6 Majiwade Polkharan Road No. 2 Thane West 4006101CompletedDec 2019May 2019
Courtyard - FlorenceFlorence Building No. 4 Majiwade Polkharan Road No. 2 Thane West 4006101CompletedDec 2019May 2019

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Courtyard - Asteria C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Majiwade7,600+ in Thane

2 kmCourtyard - Asteria CCompleted 118Lapsed / revoked 55Other 114Dot size: filed unitsN

Filed coordinates, straight-line distance. 287 registered projects within 2 km.

Builder: COURTYARD REAL ESTATE PRIVATE LIMITED

COURTYARD REAL ESTATE PRIVATE LIMITED has 8 registrations on MahaRERA, including Courtyard - Florence and Courtyard - Ornella. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Courtyard - Asteria C is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Courtyard - Asteria C?

The registered promoter entity is COURTYARD REAL ESTATE PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Courtyard - Asteria C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Courtyard - Asteria C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Courtyard - Asteria C?

The professionals named in the filing: Architect: SAAKAAR; Architect: KAPADIA ASSOCIATES DESIGN LLP; Engineer: JW Consultant LLP; Chartered Accountant: HARSH RUPARELIA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Courtyard - Asteria C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Courtyard - Asteria C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Courtyard - Asteria C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.