CONTINENTAL FUTURA

By CONTINENTAL SIDHANT REALITY

RG-MH-92503 · RERA P51700015939 · Last updated on MahaRERA portal: 1 Sep 2026

Source: official MahaRERA filing

Red flags

  • 5 complaints at MahaRERA
  • Completion date moved by 48 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2028Possession promisedmoved 48 months from the original
18 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 15%
152 of 286Units unsoldnot recorded sold or booked
5Complaints at MahaRERAon this registration
Jump to the 112 documents Report an error

CONTINENTAL FUTURA is a Residential / Group Housing project by CONTINENTAL SIDHANT REALITY in Thane, Maharashtra, registered with MahaRERA as P51700015939 on 9 Apr 2018. Possession is promised by 31 Mar 2028. The completion date has moved by 48 months from the original filing. 134 of the 286 units on this registration are recorded sold or booked, and 18 of 33 construction stages are filed complete. 5 complaints are on record with the regulator.

At a glance

Project

  • NameCONTINENTAL FUTURA
  • TypeResidential / Group Housing
  • Location
    • KALYAN BHIWANDI ROAD
    • KON GAON
    • kon (CT)
    • Bhiwandi
    • Thane
    • 421302
  • Pincode421302
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700015939
  • ReraGenie IDRG-MH-92503

Builder

  • NameCONTINENTAL SIDHANT REALITY
  • Entity typePartnership
  • GSTIN27AAKFC2948M2ZX
  • PartnersSAUD ISMAIL FALKE, SANTOSH SUKHDEO GHOLAP
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2018First promiseMar 2024Revised toMar 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Apr 2018
  • Promised completion31 Mar 2028
  • Revised completionRevised to 31 Mar 2028 (originally 30 Mar 2024)
  • Buildings3 building records
  • Documents filed112 files

Current status

47%134 of 286 units booked
40.5%Work done, per cost certificate

Figures as on 1 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CONTINENTAL FUTURA 1NA111166066
CONTINENTAL FUTURA- BUILDING 2 WING BNA15131090109
CONTINENTAL FUTURA- BUILDING 2 A WINGNA15131110111

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 1 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 15%.

CONTINENTAL FUTURA 191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CONTINENTAL FUTURA- BUILDING 2 WING B39%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure4%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
CONTINENTAL FUTURA- BUILDING 2 A WING40%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 1 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed207

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots207
Closed/Covered27
Open Space180
BuildingClosed/CoveredOpen SpaceTotal
CONTINENTAL FUTURA 101212
CONTINENTAL FUTURA- BUILDING 2 WING B12120132
CONTINENTAL FUTURA- BUILDING 2 A WING154863

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area13,250 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Jun 2026
LandownerVillageDistrict
RAMEEZ S MAJEEDKalyanThane

Approvals and building plan

Sanctioning authorityMMRDA THANE
Permissible FSI18575.4
Proposed, not sanctioned9,637 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSuraj House, ShopNo1 and 2, Gr Floor, Patlipada, Ghodbunder Road, Thane-400607
Estimated costRs 60.00 cr
Cost incurredRs 24.31 cr
Work done40.52%
BuildingWingEstimatedIncurred
CONTINENTAL FUTURA- BUILDING 2 WING BNARs 21.00 crRs 3.99 cr
CONTINENTAL FUTURA- BUILDING 2 A WINGNARs 21.00 crRs 3.99 cr
CONTINENTAL FUTURA 1NARs 11.00 crRs 11.03 cr
-NARs 7.00 crRs 5.30 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAPICES STUDIO PRIVATE LIMITED
ArchitectSquare Space Architects
EngineerEPICONS CONSULTANT PVT LTD
EngineerRM Engineering & Consulting Firm
EngineerVinod Madiwale
Chartered AccountantRachit Singh
Chartered AccountantGirish Purohit & Company
PartnerRole in project
CONTINENTAL SIDHANT REALITY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019473Mar 2024 → Mar 2025

Reason as filed by the promoterwork on site was stopped due to covid. New revise plan has been sanction from MMRDA Thane and presently Building no1 is 98 percent completed and work is in full swing for handing over the possession of building no1 in April 2024.

EXT51700027758Mar 2024 → Mar 2028

Reason as filed by the promoterEarlier the project was approved from MMRDA Thane on a base FSI of 0.95. Presently as per UDCPI the project has the potential of 3.5 FSI, because of this the potential of the project has crossed the requirement of Environment clearance certificate. mean while the work on tower no1 was in process and has been completed 100% total 66 flats and we applied for OC dated 05.07/2024. Since we did not had environment certificate for the project we could not start the work on tower no2. we had applied for Environment clearance dated 21/04/2023 and we received the certificate successfully on 06/02/2024.

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC12400793DILIP NAGESH KATKECONTINENTAL SIDHANT REALITY16/11/2024
CC12601821Mohammad Arshan SalmaniCONTINENTAL SIDHANT REALITY28/03/2026
CC12601859Shaziya Salman MemonCONTINENTAL SIDHANT REALITY29/03/2026
CC12602320Mohammed Shafi Salman MemonCONTINENTAL SIDHANT REALITY20/04/2026
CC12602544Aftab ShaikhCONTINENTAL SIDHANT REALITY01/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 26 Jan 2025

Documents filed112

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 112 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A_FY 2025-26.pdf1 Sep 2026
Withdrawal Update Form 1File: Form 1_Jun 26.pdf29 Aug 2026
Withdrawal Update Form 2File: Form 2_Jun 26.pdf29 Aug 2026
Withdrawal Update Form 3File: Form 3_Jun 26.pdf29 Aug 2026
Withdrawal Update Form 1File: Form 1 - June 2025.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1 - Sep 2025.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1 - Dec 2025.pdf24 Jun 2026
Withdrawal Update Form 1File: Form 1 - March 2026.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2 June 2025.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2 Sep 2025.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2 Dec 2025.pdf24 Jun 2026
Withdrawal Update Form 2File: Form 2 Mar 2026.pdf24 Jun 2026
Withdrawal Update Form 3File: Form3 - June 2025.pdf24 Jun 2026
Withdrawal Update Form 3File: Form3 - Sep 2025.pdf24 Jun 2026
Withdrawal Update Form 3File: Form3 - Dec 2025.pdf24 Jun 2026
Withdrawal Update Form 3File: Form3 - Mar 2026.pdf24 Jun 2026
Certificates of CA (Form 3)File: CA Form 3_compressed.pdf10 Jun 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory (2).pdf9 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Certification of completion, percentage, construction work (1).pdf12 May 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Inventory.pdf12 May 2025
Certificates of CA (Form 3)File: FORM 3 CONTINENTAL C.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: Tower -1 Sold Inventory.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: Tower-2 Sold Inventory.pdf15 Apr 2025
Declaration in FORM BFile: FORM B RERA 2025 (2).pdf5 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form2 Rera Engineers automation 2025.pdf4 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024-06-15 ARCHITECT LETTER WING B_PLINTH COMPLETION CERTIFICATE (1).PDF2 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024-12-04 WING A-PLINTH COMPLETION CERTIFICATE.PDF2 Apr 2025
OtherFile: Partnership cum retierment deed 2023_compressed.pdf30 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A June 2024.pdf30 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 A September 2024.pdf30 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A December 2024.pdf30 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SIGNED FORM 5 FY 2023-2024 (1).pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024-12-04 WING A-PLINTH COMPLETION CERTIFICATE.PDF28 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024-06-15 WING B_PLINTH COMPLETION CERTIFICATE.PDF28 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate tower no1.pdf26 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 02 06 22 form2 A.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 02 06 22 form2 A.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 03 09 22 form 2A.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 04 12 22 form 2A.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 05 03 23 form 2A.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 06 06 23 form 2A.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 07 09 23 form 2A.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 08 12 23 form 2A.pdf6 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 08 03 24 form 2A.pdf6 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form -5 01-04-2017 to 31-03-2018.pdf6 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form -5 01-04-2018 to 31-03-2019.pdf6 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form -5 01-04-2019 to 31-03-2020.pdf6 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form -5 01-04-2020 to 31-03-2021.pdf6 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form -5 01-04-21 to 31-03-2022.pdf6 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5 01-04-2022 to 31-03-2023.pdf6 May 2024
Certificates of CA (Form 3)File: Form -3 Continental Sidhant Reality.pdf27 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: FORM 5 FY 2017-2018.pdf26 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 FY 2018-19.pdf26 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 FY 2019-20.pdf26 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: From - 2 2024.pdf21 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A (June 2022).pdf21 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A (September 2022).pdf21 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A (December 2022).pdf21 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other Real Estate Organization.pdf21 Apr 2024
Proforma of Agreement for saleFile: draft agreement updated.pdf21 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM - 2 2023.pdf19 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: form A 2021.pdf19 Apr 2024
Details of encumbrances concerned to FinanceFile: RERA 1 b Details Of encumbrances.pdf17 Apr 2024
Details of encumbrances concerned to LegalFile: RERA 1 b Details Of encumbrances.pdf17 Apr 2024
Declaration in FORM BFile: Form B RERA.pdf17 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Form - 5 2021.pdf17 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Form - 5 2022.pdf17 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Form - 5 2023.pdf17 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CA Form - 5 2021.pdf2 Apr 2024
Disclosure of sold/ booked inventoryFile: rera sold inventory.pdf2 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Form - 5 2021.pdf2 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Form - 5 2022.pdf2 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Quality Certificate MARCH 23.pdf31 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Quality Certificate JUNE 23.pdf31 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Quality Certificate SEP 23.pdf31 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Quality Certificate DEC 23.pdf31 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2024-03-27 WORK COMPLETION CERTIFICATE BUILDING-1.pdf28 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Work Completion - Building 1.pdf23 Mar 2024
Layout approvalFile: revise layout approval AS PER FULL CONSUMPTION PAGE1.pdf27 Aug 2023
Layout approvalFile: revise layout approval AS PER FULL CONSUMPTION PAGE2.pdf27 Aug 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Jarhauddin MansionBombil Bazar, Kalyan west14CompletedJan 2015Jan 2015

How this compares with Thane

47%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 48 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CONTINENTAL FUTURA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KON GAON7,600+ in Thane

2 kmCONTINENTAL FUTURACompleted 15Lapsed / revoked 13Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: CONTINENTAL SIDHANT REALITY

CONTINENTAL SIDHANT REALITY has 1 registration on MahaRERA, including CONTINENTAL FUTURA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if CONTINENTAL FUTURA is delayed beyond 31 Mar 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CONTINENTAL FUTURA?

The registered promoter entity is CONTINENTAL SIDHANT REALITY, a partnership as per the filing. Its GSTIN 27AAKFC2948M2ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CONTINENTAL FUTURA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CONTINENTAL FUTURA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for CONTINENTAL FUTURA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CONTINENTAL FUTURA?

The professionals named in the filing: Architect: APICES STUDIO PRIVATE LIMITED; Architect: Square Space Architects; Engineer: EPICONS CONSULTANT PVT LTD; Engineer: RM Engineering & Consulting Firm; Engineer: Vinod Madiwale; Chartered Accountant: Rachit Singh. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CONTINENTAL FUTURA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CONTINENTAL FUTURA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CONTINENTAL FUTURA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.