ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / Construction of 56 flats under EWS & 112 flats (G+7) under MIG Residential Tenements on land bearing Survey No. 92/3, at Mouza- Hazaripahad, Nagpur, Tal & Dist. - Nagpur.

Registered No litigation declared Residential / Group Housing project

Construction of 56 flats under EWS & 112 flats (G+7) under MIG Residential Tenements on land bearing Survey No. 92/3, at Mouza- Hazaripahad, Nagpur, Tal & Dist. - Nagpur.

By MHADA (Nagpur board)

RG-MH-79684 · RERA PR1190002602647 · Last updated on MahaRERA portal: 2 Nov 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 22 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Sep 2031Possession promisedno revision filed
6 of 46Construction stages doneacross 5 buildings; furthest along: Excavation, 0%
168 of 168Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 8 documents Report an error

Construction of 56 flats under EWS & 112 flats (G+7) under MIG Residential Tenements on land bearing Survey No. 92/3, at Mouza- Hazaripahad, Nagpur, Tal & Dist. - Nagpur. is a Residential / Group Housing project by MHADA (Nagpur board) in Nagpur, Maharashtra, registered with MahaRERA as PR1190002602647 on 5 Nov 2026. Possession is promised by 30 Sep 2031. 0 of the 168 units on this registration are recorded sold or booked, and 6 of 46 construction stages are filed complete.

At a glance

Project

  • NameConstruction of 56 flats under EWS & 112 flats (G+7) under MIG Residential Tenements on land bearing Survey No. 92/3, at Mouza- Hazaripahad, Nagpur, Tal & Dist. - Nagpur.
  • TypeResidential / Group Housing
  • Location
    • Hazaripahad road
    • Mouza Hazaripahad
    • Mouza - Hazaripahad
    • Nagpur (Urban)
    • Nagpur
    • 440006
  • Pincode440006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1190002602647
  • ReraGenie IDRG-MH-79684

Builder

  • NameMHADA (Nagpur board)
  • Entity typePublic Authority
  • GSTIN27AAAJM0344HBZ4
  • EePriyanka p keode
  • Other registrations22 more →
  • Completed15 of 23
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredNov 2026PromisedSep 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Nov 2026
  • Promised completion30 Sep 2031
  • Revised completionNone
  • Buildings5 building records
  • Documents filed8 files

Current status

0%0 of 168 units booked

Figures as on 2 Nov 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bld. No. A MIGNULL8728028
Bld. No. B MIGNULL8728028
Bld. No. C MIGNULL8728028
Bld. No. D MIGNULL8728028
Bld. No. E EWSnull8756056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 2 Nov 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 46 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.

Bld. No. A MIG · wing NULL0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bld. No. B MIG · wing NULL33%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bld. No. C MIG · wing NULL22%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bld. No. D MIG · wing NULL11%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bld. No. E EWS · wing null0%
ActivityProgress
Excavation0%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Nov 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNo0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed292

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots292
Open Space63
Stilt / Ground229
BuildingOpen SpaceStilt / GroundTotal
Bld. No. A MIG NULL154156
Bld. No. B MIG NULL154156
Bld. No. C MIG NULL164157
Bld. No. D MIG NULL164157
Bld. No. E EWS null16566

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,681 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Aug 2026
LandownerVillageDistrict
Nagpur housing and area development boardNagpur (M Corp.)Nagpur

Approvals and building plan

Permissible FSI35138.05
Proposed, not sanctioned15,156 sq m
Buildings approved5
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch172, MAHABANK BLDG, ABHYANKAR RD, SITABULDI, NAGPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Architectsanjay Dhawad
Engineersatish raipure
Chartered Accountantlalit n khapre
PartnerRole in project
MHADA (Nagpur board)-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Aug 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jul 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2031

Documents filed8

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration and undertaking (Annexure A)File: Annexure A CTS changed.pdf2 Nov 2026
Layout approvalFile: approved layout and drawing-1.pdf8 Aug 2026
Building plan approvalFile: approved layout and drawing-2-6-1.pdf2 Jul 2026
Building plan approvalFile: approved layout and drawing-2-6-2.pdf2 Jul 2026
Building plan approvalFile: approved layout and drawing-2-6-3.pdf2 Jul 2026
Building plan approvalFile: approved layout and drawing-2-6-4.pdf2 Jul 2026
Building plan approvalFile: approved layout and drawing-2-6-5.pdf2 Jul 2026
Building plan approval or NA orderFile: 1.pdf2 Jul 2026

How this compares with Nagpur

0%of this project is bookeddistrict median 34%
14%of Nagpur projects moved their completion datethis one has not
21%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,900+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Construction of 56 flats under EWS & 112 fla on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mouza Hazaripahad2,900+ in Nagpur

2 kmConstruction of 56 flatsCompleted 11Lapsed / revoked 2Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: MHADA (Nagpur board)

MHADA(Nagpur Board) has 23 registrations on MahaRERA, including Construction of 14 Rowhouses at Waddhamna Nagpur and Site No.124, Datala, New Chandrapur. Its filings disclose 6 earlier MahaRERA projects: declares 1 of 6 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Construction of 56 flats under EWS & 112 flats (G+7) under MIG Residential Tenements on land bearing Survey No. 92/3, at Mouza- Hazaripahad, Nagpur, Tal & Dist. - Nagpur. is delayed beyond 30 Sep 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Construction of 56 flats under EWS & 112 flats (G+7) under MIG Residential Tenements on land bearing Survey No. 92/3, at Mouza- Hazaripahad, Nagpur, Tal & Dist. - Nagpur.?

The registered promoter entity is MHADA (Nagpur board), a public authority as per the filing. Its GSTIN 27AAAJM0344HBZ4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Construction of 56 flats under EWS & 112 flats (G+7) under MIG Residential Tenements on land bearing Survey No. 92/3, at Mouza- Hazaripahad, Nagpur, Tal & Dist. - Nagpur.?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Construction of 56 flats under EWS & 112 flats (G+7) under MIG Residential Tenements on land bearing Survey No. 92/3, at Mouza- Hazaripahad, Nagpur, Tal & Dist. - Nagpur.?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Construction of 56 flats under EWS & 112 flats (G+7) under MIG Residential Tenements on land bearing Survey No. 92/3, at Mouza- Hazaripahad, Nagpur, Tal & Dist. - Nagpur.?

The professionals named in the filing: Architect: sanjay Dhawad; Engineer: satish raipure; Chartered Accountant: lalit n khapre. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Construction of 56 flats under EWS & 112 flats (G+7) under MIG Residential Tenements on land bearing Survey No. 92/3, at Mouza- Hazaripahad, Nagpur, Tal & Dist. - Nagpur.?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Construction of 56 flats under EWS & 112 flats (G+7) under MIG Residential Tenements on land bearing Survey No. 92/3, at Mouza- Hazaripahad, Nagpur, Tal & Dist. - Nagpur.. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Construction of 56 flats under EWS & 112 fla to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.