Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared

Nothing adverse is on this record. The buyer report still lays out every unit and the land chain as filed.

See what the report covers Free either way: .
Dec 2029Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 51 documents Report an error

Construction of 302 houses at channapattana town is a Residential/Group Housing project by CMC Channapattana in Ramanagara, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1270/300/PR/310125/007463 on 31 Jan 2025. Possession is promised by 30 Dec 2029.

At a glance

Project

  • NameConstruction of 302 houses at channapattana town
  • TypeResidential/Group Housing
  • Location
    • Channapatna
    • Ramanagara
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1270/300/PR/310125/007463
  • ReraGenie IDRG-KA-78507

Builder

  • NameCMC Channapattana
  • Entity typeRajiv Gandhi Housing Corporation Limited
  • GSTIN29AAQCA4579B1ZC
  • Authorized SignatoryCommissioner CMC channapattana

Key dates

this monthRegisteredJan 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on31 Jan 2025
  • Promised completion30 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed51 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A---3020302

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities29

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingYes-
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners1
LandownerVillageDistrict
Tahasildhar--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 22.37 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 21.55 cr-
On-site expenditure-Salaries of workersRs 38.40 lakh-
On-site expenditure-Consultants FeesRs 32.32 lakh-
On-site expenditure-Site OverheadRs 10.00 lakh-
Payment of PremiumsRs 1.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectACS design
EngineerACS design
Chartered AccountantAccount superintendent

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed51

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1270/300/PR/310125/007463 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RTC, survey 53/2 54-
Mutation, survey 53/2 54-
Encumbrance Certificate, survey 53/2 54-
Khatha, survey 53/2 54-
Registration CertificateFile: GEZET compressed.pdf-
GST CertificateFile: GST Certificate.pdf-
Certificate issued by CA Form 1File: LOA.jpg-
Certificate issued by Architect Form 2File: LOA.jpg-
Certificate issued by Engineer Form 3File: WO.jpg-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Mutation.pdf-
Balance Sheet 2023 - 2024File: Account statement.pdf-
Balance Sheet 2022 - 2023File: Account statement.pdf-
Balance Sheet 2021 - 2022File: Account statement.pdf-
Audited Profit and Loss Statement 2023 - 2024File: Bank statement audit.pdf-
Audited Profit and Loss Statement 2022 - 2023File: Bank statement audit.pdf-
Audited Profit and Loss Statement 2021 - 2022File: Bank statement audit.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: Account statement.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: Account statement.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: Account statement.pdf-
Channapatna BMICPA Layout Plan Approved-
Typical floor plan-
Channapatna Layout Plan-
Channapatna BMICPA Layout Plan Approved-
Typical floor plan-
Channapatna BMICPA Layout Plan Approved-
DC letter-
DC letter-
DC letter-
DC letter-
DC letter-
DC letter-
DC letter-
DC letter-
DC letter-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
LOA-
Prospectus/BrochureFile: Channapattana.pdf-
Advertisement Copy 1File: Channapattana.pdf-

How this compares with Ramanagara

21%of Ramanagara projects moved their completion datethis one has not
1%of Ramanagara registrations are shown as withdrawn or revokedthis one is not

Computed across the 82 Ramanagara projects on ReraGenie, from their own filings.

Keep Construction of 302 houses at channapattana on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Ramanagara82 in Ramanagara

Builder: CMC Channapattana

CMC Channapattana has 1 registration on RERA Karnataka, including Construction of 302 houses at channapattana town. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Ramanagara district page.

Frequently asked questions

What are my rights if Construction of 302 houses at channapattana town is delayed beyond 30 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Construction of 302 houses at channapattana town?

The registered promoter entity is CMC Channapattana, a rajiv gandhi housing corporation limited as per the filing. Its GSTIN 29AAQCA4579B1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Construction of 302 houses at channapattana town?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Construction of 302 houses at channapattana town?

The professionals named in the filing: Architect: ACS design; Engineer: ACS design; Chartered Accountant: Account superintendent. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Construction of 302 houses at channapattana town?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Construction of 302 houses at channapattana town. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Construction of 302 houses at channapattana to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.