Home / Browse projects / Pune, Maharashtra / CLEVELAND PARK
CLEVELAND PARK
RG-MH-11102 · RERA P52100003050 · Last updated on MahaRERA portal: 8 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Possession 1 months past the filed date
- 2 complaints at MahaRERA
- Completion date moved by 45 months
- 3 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CLEVELAND PARK is a Others project by VARDAAN LIFESTYLE LIMITED in Pune, Maharashtra, registered with MahaRERA as P52100003050 on 4 Aug 2017. Possession was promised by 30 Sep 2026 and is now 1 months past that date. The completion date has moved by 45 months from the original filing. 61 of the 92 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameCLEVELAND PARK
- TypeOthers
- Location
- NIBM ROAD
- MOHAMMADWADI
- Haveli
- Pune
- 411057
- Pincode411057
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100003050
- ReraGenie IDRG-MH-11102
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on4 Aug 2017
- Promised completion30 Sep 2026
- Revised completionRevised to 30 Sep 2026 (originally 30 Dec 2022)
- Buildings2 building records
- Documents filed217 files
Current status
Figures as on 8 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 15 | 12 | 41 | 5 | 46 |
| WING B | NA | 15 | 12 | 41 | 5 | 46 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 8 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
WING A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 8 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed74
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 37 | 37 |
| WING B | 37 | 37 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 2.27 cr | Rs 2.27 cr |
| WING A | NA | Rs 1.14 cr | Rs 1.14 cr |
| WING B | NA | Rs 1.14 cr | Rs 1.14 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PARVEJ JAMADAR AND ASSOCIATES |
| Architect | Cubix Architects Associates |
| Engineer | PAPPURAJ SASTE |
| Engineer | G A BHILARE CONSULTANT PVT LTD |
| Engineer | Manoj Mittal |
| Chartered Accountant | AISHWARYA OSWAL & ASSOCIATES |
| Chartered Accountant | RONAK A JAIN & ASSOCIATES |
| Chartered Accountant | Krishna Kabra And Company |
| Partner | Role in project |
|---|---|
| VARDAAN LIFESTYLE LIMITED | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe would like to bring to your notice that all the work for the project is completed. We have also obtained the various NOCs required for the application of the Occupation Certificate. We had applied for the Occupancy Certificate to the authorities. However, the same is not yet obtained and is still in the process. Due to this we are in dilemma we will not be able to obtain the Certificate before 31st December, 2022. Kindly grant extension till 30th December, 2023
Reason as filed by the promoterWe, Vardaan Lifestyle Limited, Promoter of the project “CLEVELAND PARK” bearing MahaRERA Registration No. P52100003050, respectfully submit this Explanatory Note in support of our application for extension of the project registration. We are pleased to inform the Authority that construction of Wing A and Wing B has been successfully completed in all respects. Further, we have obtained a Full Occupancy Certificate on 16-10-2025 from the competent Planning Authority It is important to clarify that although the Planning Authority has issued a Part OC for the larger layout, the same constitutes a
Reason as filed by the promoterThe project was originally scheduled for completion on 16/10/2025, and the completion certificate was received on the same date. However, it was noticed that there is a difference in the FSI details shown on the portal and the sanctioned plan. To rectify this discrepancy, we are required to apply for correction in the project details on the portal. Since the project registration has lapsed, we are applying for an extension to enable us to carry out the necessary corrections.We therefore request the Authority to kindly grant an extension of the project registration up to 30/09/2026 so that the
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 1238/2017/2017 | CIVIL COURT SR DIVISION PUNE | PENDING |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC005000000022234 | Santosh kanchan | Mittal brothers Pvt.ltd | 11/11/2018 |
| CC005000000096156 | Mrs. Alka Changdev Kanchan | Vardaan Lifestyle Limited Thr. its Director a. Manojkumar S. Mittal b.Bharat V. Mittal | 30/11/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 28 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed217
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 217 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 8 Sep 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 8 Sep 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 8 Sep 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 8 Sep 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 8 Sep 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 8 Sep 2026 |
| Form 2A (FY 2025-2026)File: Form 2A FY 25-26.pdf | 8 Sep 2026 |
| Form 1File: Form 1.pdf | 6 Jan 2026 |
| Form 2File: Form 2.pdf | 6 Jan 2026 |
| Form 3File: Form 3.pdf | 6 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 6 Jan 2026 |
| Form 1File: Form 1.pdf | 6 Jan 2026 |
| Form 2File: Form 2.pdf | 6 Jan 2026 |
| Form 3File: Form 3.pdf | 6 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 6 Jan 2026 |
| Form 1File: Form 1.pdf | 6 Jan 2026 |
| Form 2File: Form 2.pdf | 6 Jan 2026 |
| Form 3File: Form 3.pdf | 6 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 6 Jan 2026 |
| Form 1File: Form 1.pdf | 6 Jan 2026 |
| Form 2File: Form 2.pdf | 6 Jan 2026 |
| Form 3File: Form 3.pdf | 6 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 6 Jan 2026 |
| Form 1File: Form 1.pdf | 6 Jan 2026 |
| Form 2File: Form 2.pdf | 6 Jan 2026 |
| Form 3File: Form 3.pdf | 6 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: CIRCULAR 29.pdf | 6 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 as on OC Date.pdf | 6 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 6 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 6 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 as on OC Date.pdf | 6 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 6 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 6 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Certified .pdf | 6 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 6 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 6 Jan 2026 |
| Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf | 6 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 24-25.pdf | 6 Jan 2026 |
| Form 5 (FY 2017-2018)File: Form 5 17-18.pdf | 4 Dec 2025 |
| Form 5 (FY 2018-2019)File: Form 5 18-19.pdf | 4 Dec 2025 |
| Form 5 (FY 2019-2020)File: Form 5 19-20.pdf | 4 Dec 2025 |
| Form 5 (FY 2020-2021)File: Form 5 20-21.pdf | 4 Dec 2025 |
| Form 5 (FY 2021-2022)File: Form 5 21-22.pdf | 4 Dec 2025 |
| Form 5 (FY 2022-2023)File: Form 5 22-23.pdf | 4 Dec 2025 |
| Form 1File: Form 1 September 2017.pdf | 2 Dec 2025 |
| Form 2File: Form 2 September 2017.pdf | 2 Dec 2025 |
| Form 3File: Form 3 September 2017.pdf | 2 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on September 2017.pdf | 2 Dec 2025 |
| Form 1File: Form 1 December 2017.pdf | 2 Dec 2025 |
| Form 2File: Form 2 December 2017.pdf | 2 Dec 2025 |
| Form 3File: Form 3 December 2017.pdf | 2 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on December 2017.pdf | 2 Dec 2025 |
| Form 1File: Form 1 March 2018.pdf | 2 Dec 2025 |
| Form 2File: Form 2 March 2018.pdf | 2 Dec 2025 |
| Form 3File: Form 3 March 2018.pdf | 2 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on March 2018.pdf | 2 Dec 2025 |
| Form 1File: Form 1 June 2018.pdf | 2 Dec 2025 |
| Form 2File: Form 2 June 2018.pdf | 2 Dec 2025 |
| Form 3File: Form 3 June 2018.pdf | 2 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on June 2018.pdf | 2 Dec 2025 |
| Form 1File: Form 1 September 2018.pdf | 2 Dec 2025 |
| Form 2File: Form 2 September 2018.pdf | 2 Dec 2025 |
| Form 3File: Form 3 September 2018.pdf | 2 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on September 2018.pdf | 2 Dec 2025 |
| Form 1File: Form 1 December 2018.pdf | 2 Dec 2025 |
| Form 2File: Form 2 December 2018.pdf | 2 Dec 2025 |
| Form 3File: Form 3 December 2018.pdf | 2 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on December 2018.pdf | 2 Dec 2025 |
| Form 1File: Form 1 March 2019.pdf | 2 Dec 2025 |
| Form 2File: Form 2 March 2019.pdf | 2 Dec 2025 |
| Form 3File: Form 3 March 2019.pdf | 2 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on March 2019.pdf | 2 Dec 2025 |
| Form 1File: Form 1 June 2019.pdf | 2 Dec 2025 |
| Form 2File: Form 2 June 2019.pdf | 2 Dec 2025 |
| Form 3File: Form 3 June 2019.pdf | 2 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on June 2019.pdf | 2 Dec 2025 |
| Form 1File: Form 1 September 2019.pdf | 2 Dec 2025 |
| Form 2File: Form 2 September 2019.pdf | 2 Dec 2025 |
| Form 3File: Form 3 September 2019.pdf | 2 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 as on September 2019.pdf | 2 Dec 2025 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| LIFE PARK | S.No.13 H.No.1 2 Plot A and Plot B part Mohammadwadi Near Corienthan Club NIBM Road Pune-060 | 228 | Completed | Nov 2012 | Nov 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 217 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CLEVELAND PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MOHAMMADWADI13,700+ in Pune
Filed coordinates, straight-line distance. 184 registered projects within 2 km.
Godrej Evergreen Square
Godrej Projects Development Limited
The Aqua Retreat at Godrej Park World
Maan-Hinje Township Developers Private Lim
The Gale at Godrej Park World
Maan-Hinje Township Developers LLP
VTP BELLISSIMO PHASE 1
MAGNITE DEVELOPERS PRIVATE LIMITED
Life Republic Sector R1 - 1st Avenue
KOLTE-PATIL DEVELOPERS LIMITED
The Greenfront at Godrej Park World
Maan Hinje Township Developers Private Lim
Builder: VARDAAN LIFESTYLE LIMITED
VARDAAN LIFESTYLE LIMITED has 2 registrations on MahaRERA, including CLEVELAND PARK and GANGA GENESIA. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if CLEVELAND PARK is delayed beyond 30 Sep 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CLEVELAND PARK?
The registered promoter entity is VARDAAN LIFESTYLE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CLEVELAND PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against CLEVELAND PARK?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for CLEVELAND PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CLEVELAND PARK?
The professionals named in the filing: Architect: PARVEJ JAMADAR AND ASSOCIATES; Architect: Cubix Architects Associates; Engineer: PAPPURAJ SASTE; Engineer: G A BHILARE CONSULTANT PVT LTD; Engineer: Manoj Mittal; Chartered Accountant: AISHWARYA OSWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CLEVELAND PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback