Home / Browse projects / Pune, Maharashtra / CITY PLAZA

Completed No litigation declared Commercial project

CITY PLAZA

By Shreenathji Construction LLP

RG-MH-17215 · RERA P52100028180 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
42 of 63Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 192 documents Report an error

CITY PLAZA is a Commercial project by Shreenathji Construction LLP in Pune, Maharashtra, registered with MahaRERA as P52100028180 on 10 Feb 2021. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 48 months from the original filing. 21 of the 63 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameCITY PLAZA
  • TypeCommercial
  • Location
    • 912/2
    • 913/3 PLOT NO. A-2 AND A-3
    • SAMSON NAGAR NEXT TO BANK OF MAHARASHTRA
    • NEAR TALEGAON DABHADE RAILWAY STATION
    • TALEGAON DABHADE
    • TAL.- MAWAL
    • DIST....
  • Pincode410506
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100028180
  • ReraGenie IDRG-MH-17215

Builder

  • NameShreenathji Construction LLP
  • Entity typePartnership
  • GSTIN27ACYFS8448Q1ZL
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2021First promiseDec 2022Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Feb 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed192 files

Current status

33%21 of 63 units booked
100.0%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CITY PLAZA18606363

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

CITY PLAZA · wing 1: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed77

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots77
Closed/Covered77

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area928 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityTalegaon Dabhade Municipal council
Permissible FSI3804.8
Proposed, not sanctioned2,846 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch981, TELI ALI, TALEGAON DABHADE
Estimated costRs 8.65 cr
Cost incurredRs 8.65 cr
Work done100.0%
BuildingWingEstimatedIncurred
CITY PLAZA1Rs 8.10 crRs 8.10 cr
-NARs 55.00 lakhRs 55.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAIE ENGINEERS & ALLIED DESIGNERS
EngineerSAIE ENGINEERS & ALLIED DESIGNERS
Chartered AccountantNEERAJ GORAKSH KALE
Chartered AccountantPUSHPA BOGATI
PartnerRole in project
Shreenathji Construction LLP-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100013904Dec 2022 → Dec 2023

Reason as filed by the promoterDate-04/02/2023 To, The Maharashtra Real Estate Regulatory Authority, Reference- RERA REGISTRATION NO- P52100028180 Subject: Application for extension of date of completion. Hon. Sir/Madam, We, Partner 1. Sagar Ashok Shah 2. Rupesh manubhai Mehta 3. Yatin Suresh Shah of Shreenathji Construction LLP, have not yet completed the RERA projects namely- CITY PLAZA , Plot no-602 but complied with all the rules & regulations prescribed under RERA Act till date. Sir, , Yatin S. Shah - partner would like to prey as under - 1. Due to Covid 19 pandamic, I was in huge losses in my losses and my business ha

EXT52100019103Dec 2022 → Jun 2024

Reason as filed by the promoterDue to Covid 19 pandemic we were not able to construct anymore because of lack of labour contractor and the poor market condition, we were unable to complete the project within the due time.

EA12052620918Dec 2022 → Dec 2026

Reason as filed by the promoter1. Project Details That we are the promoters/partners of the project namely “City Plaza”, registered with Maharashtra Real Estate Regulatory Authority under Registration No. P52100028180. 2. Declaration Regarding Project Status That the above-mentioned project has been marked as Lapsed by MahaRERA Authority, due to which we were unable to proceed further with the submission of the Completion Certificate (CC) and other documents required for compliances within the stipulated time. 3. Reason for Delay That the delay in completion and submission of documents has occurred due to the project being

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jan 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jun 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Feb 2025

Documents filed192

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 192 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Full Occupancy Certificate 200225.pdf30 Jun 2026
Occupational CertificateFile: city plaza resvised final plan 20 feb 25.pdf30 Jun 2026
Occupational CertificateFile: City plaza revised final plan 2 20 feb 25.pdf30 Jun 2026
Building plan approvalFile: Master Plan 29112024 highlighted.pdf25 Jun 2026
Building plan approvalFile: city plaza revised plan 29 nov 2024 2.pdf10 Jun 2026
Building plan approvalFile: City Plaza Revised cc order 29 nov 2024.pdf10 Jun 2026
Commencement certificateFile: Commencement Certificates NA Order 130320.pdf8 Jun 2026
Form 1File: FORM 1 Q2 300924.pdf8 Jun 2026
Form 2File: FORM 2 Q2 300924.pdf8 Jun 2026
Form 3File: FORM 3 Q2 300924.pdf8 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf8 Jun 2026
Form 1File: FORM 1 Q3 311224.pdf8 Jun 2026
Form 2File: FORM 2 Q3 311224.pdf8 Jun 2026
Form 3File: FROM 3 Q3 311224.pdf8 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold booked inventory.pdf8 Jun 2026
Form 1File: FORM 1 Q4 310325.pdf8 Jun 2026
Form 2File: FORM 2 Q4 310325.pdf8 Jun 2026
Form 3File: FORM 3 Q4 310325.pdf8 Jun 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold inventory Q4.pdf8 Jun 2026
Withdrawal Update Form 1File: city 1.pdf8 Jun 2026
Withdrawal Update Form 1File: city 1.pdf8 Jun 2026
Withdrawal Update Form 1File: city 1.pdf8 Jun 2026
Withdrawal Update Form 1File: city 1.pdf8 Jun 2026
Withdrawal Update Form 1File: city 1.pdf8 Jun 2026
Withdrawal Update Form 1File: city 1.pdf8 Jun 2026
Withdrawal Update Form 2File: FORM 2 Q1 300625.pdf8 Jun 2026
Withdrawal Update Form 2File: FORM 2 Q1 300625.pdf8 Jun 2026
Withdrawal Update Form 2File: FORM 2 Q1 300625.pdf8 Jun 2026
Withdrawal Update Form 2File: FORM 2 Q1 300625.pdf8 Jun 2026
Withdrawal Update Form 2File: FORM 3 Q4 310326.pdf8 Jun 2026
Withdrawal Update Form 2File: FORM 3 Q4 310326.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM 3 Q1 300625.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM 3 Q2 300925.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM 3 Q3 311225.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM 3 Q3 311225.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM 3 Q3 311225.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM 3 Q3 311225.pdf8 Jun 2026
Form 1File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf9 Aug 2025
Form 2File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf9 Aug 2025
Form 3File: CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: 2 Disclosure of sold_ booked inventory.pdf9 Aug 2025
Form 1File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf9 Aug 2025
Form 2File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf9 Aug 2025
Form 3File: CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: 3 Disclosure of sold_ booked inventory.pdf9 Aug 2025
Form 1File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf9 Aug 2025
Form 2File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf9 Aug 2025
Form 3File: CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: 6 Disclosure of sold_ booked inventory.pdf9 Aug 2025
Form 1File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf9 Aug 2025
Form 2File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf9 Aug 2025
Form 3File: CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: 7 Disclosure of sold_ booked inventory.pdf9 Aug 2025
Form 1File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf9 Aug 2025
Form 2File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf9 Aug 2025
Form 3File: CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: 8 Disclosure of sold_ booked inventory.pdf9 Aug 2025
Form 1File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf9 Aug 2025
Form 2File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf9 Aug 2025
Form 3File: CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: 9 Disclosure of sold_ booked inventory.pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: 10 Disclosure of sold_ booked inventory.pdf9 Aug 2025
Form 1File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf9 Aug 2025
Form 2File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf9 Aug 2025
Form 3File: CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf9 Aug 2025
Form 1File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf9 Aug 2025
Form 2File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf9 Aug 2025
Form 3File: CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: 11 Disclosure of sold_ booked inventory.pdf9 Aug 2025
Form 1File: Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf9 Aug 2025
Form 2File: Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf9 Aug 2025
Form 3File: CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold_ booked inventory.pdf9 Aug 2025
Form 1File: 12 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf9 Aug 2025
Form 2File: 12 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf9 Aug 2025
Form 3File: 12 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: 12 Disclosure of sold_ booked inventory.pdf9 Aug 2025
Form 1File: 13 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf9 Aug 2025
Form 2File: 13 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf9 Aug 2025
Form 3File: 13 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf9 Aug 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SHRINIDHI APARTMENTNEAR SARASWATI VIDYA MANDIR TAPODHAM COLONY TALEGAON DABHADE1CompletedJun 2018Dec 2017

How this compares with Pune

33%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 48 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CITY PLAZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TALEGAON DABHADE13,700+ in Pune

2 kmCITY PLAZACompleted 53Lapsed / revoked 40Other 45Dot size: filed unitsN

Filed coordinates, straight-line distance. 138 registered projects within 2 km.

Builder: Shreenathji Construction LLP

Shreenathji Construction LLP has 1 registration on MahaRERA, including CITY PLAZA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if CITY PLAZA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CITY PLAZA?

The registered promoter entity is Shreenathji Construction LLP, a partnership as per the filing. Its GSTIN 27ACYFS8448Q1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CITY PLAZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CITY PLAZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CITY PLAZA?

The professionals named in the filing: Architect: SAIE ENGINEERS & ALLIED DESIGNERS; Engineer: SAIE ENGINEERS & ALLIED DESIGNERS; Chartered Accountant: NEERAJ GORAKSH KALE; Chartered Accountant: PUSHPA BOGATI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CITY PLAZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CITY PLAZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CITY PLAZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.