Home / Browse projects / Mumbai Suburban, Maharashtra / CHOICE AMBE DARSHAN

Registration lapsed No litigation declared Residential / Group Housing project

CHOICE AMBE DARSHAN

By CHOICE DEVELOPER

RG-MH-35781 · RERA P51800045613 · Last updated on MahaRERA portal: 3 Oct 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
10 of 77Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

CHOICE AMBE DARSHAN is a Residential / Group Housing project by CHOICE DEVELOPER in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800045613 on 26 May 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 67 of the 77 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameCHOICE AMBE DARSHAN
  • TypeResidential / Group Housing
  • Location
    • CTS NO 5661 PLOT NO 39
    • PANT NAGAR GHATKOPAR (E) MUMBAI
    • Greater Mumbai (M Corp.) (Part) (802794)
    • Mumbai
    • Mumbai Suburban
    • 400075
  • Pincode400075
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800045613
  • ReraGenie IDRG-MH-35781

Builder

  • NameCHOICE DEVELOPER
  • Entity typePartnership
  • PartnersDHARMENDRA VALJI KARIA, HARNISH DHARMENDRA KARIA, YASH DEEPAK KARIA, KARTIK RAMESH THAKKAR, DEEPAK VALJI KARIA
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredMay 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on26 May 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

87%67 of 77 units booked
33.4%Work done, per cost certificate

Figures as on 3 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CHOICE AMBE DARSHANNA191677077

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

CHOICE AMBE DARSHAN: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed62

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots62
Closed/Covered62

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area836 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
PANT NAGAR PEARL CO-OPERATIVE HOUSING SOCIETY LTDGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authorityBuilding Permission Cell, Greater Mumbai / MHADA
Permissible FSI6824.27
Proposed, not sanctioned6,824 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCBD BELAPUR
Estimated costRs 62.75 cr
Cost incurredRs 20.98 cr
Work done33.43%
BuildingWingEstimatedIncurred
CHOICE AMBE DARSHANNARs 40.35 crRs 18.67 cr
-NARs 22.40 crRs 2.31 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARCHO CONSULTANTS
ArchitectSachin K Rakshe
EngineerRAJESH SHAH
Chartered AccountantSANKET S SHAH & CO
Chartered AccountantAnuj A Bafna
Chartered AccountantRahul Thakkar & Associates
PartnerRole in project
CHOICE DEVELOPER-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 May 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jul 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Self-declaration of Quarterly ProgressFile: Q4 QPR.pdf3 Oct 2025
Form 1File: Q4 QPR.pdf3 Oct 2025
Form 2File: Q4 QPR.pdf3 Oct 2025
Form 3File: Q4 QPR.pdf3 Oct 2025
Disclosure of Sold and Booked InventoryFile: Q4 QPR.pdf3 Oct 2025
Withdrawal Update Form 1File: Choice Ambe Darshan Apr - June 2025.pdf3 Oct 2025
Withdrawal Update Form 1File: Choice Ambe Darshan July - Sep 2025.pdf3 Oct 2025
Withdrawal Update Form 2File: Choice Ambe Darshan Apr - June 2025.pdf3 Oct 2025
Withdrawal Update Form 2File: Choice Ambe Darshan July - Sep 2025.pdf3 Oct 2025
Withdrawal Update Form 3File: 39 Form 3 -Dec 24.pdf3 Oct 2025
Withdrawal Update Form 3File: 39 Form 3 -Dec 24.pdf3 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 Bldg 39 sign.pdf29 Sep 2025
Building plan approvalFile: Plan 1_11zon.pdf23 Jul 2025
Building plan approvalFile: Plan 2.pdf23 Jul 2025
Building plan approvalFile: Plan 3.pdf23 Jul 2025
Building plan approvalFile: Plan 4.pdf23 Jul 2025
Building plan approvalFile: Plan 5.pdf23 Jul 2025
Form 1File: 39 form 1 mar 24.pdf23 Jul 2025
Form 2File: 39 form 2 mar 24.pdf23 Jul 2025
Form 3File: Choice Ambe Darshan Form 3 FINAL.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31 MARCH 24.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold JUNE 24.pdf23 Jul 2025
Form 2File: 39 form 2 jun 24.pdf23 Jul 2025
Form 1File: 39 form 1 jun 24.pdf23 Jul 2025
Form 3File: form 3 jun 24.pdf23 Jul 2025
Form 1File: 39 form 1 sep 24.pdf23 Jul 2025
Form 2File: Form 2 Sept 2024-39.pdf23 Jul 2025
Form 3File: 39 Form 3-Sept 24.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 30 SEP 24.pdf23 Jul 2025
Form 1File: 39 form 1 dec 24.pdf23 Jul 2025
Form 2File: Form - 2 Dec 2024 - 39.pdf23 Jul 2025
Form 3File: 39 Form 3 -Dec 24.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31 DEC 24.pdf23 Jul 2025
Form 2A (FY 2023-2024)File: 39 FORM 2A 23-24.pdf23 Jul 2025
Form 2A (FY 2024-2025)File: 39 FORM 2A 24-25.pdf23 Jul 2025
Form 5 (FY 2023-2024)File: form 5 23-24.pdf23 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Choice Ambe Darshan Form 3 FINAL.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 23 Final.pdf24 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 23 Final.pdf24 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Dec 23 Final.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Bldg 39 Ambe Darshan June 2023.pdf19 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Bldg 39 Ambe Darshan Sept 2023.pdf19 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Bldg 39 Ambe Darshan Dec 2023.pdf19 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 39 FORM 1 30-06-22.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 39 FORM 1 30-09-22.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 39 FORM 1 31-12-22.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 39 FORM 1 31-03-23.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 39 FORM 1 30-06-23.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 39 FORM 1 30-09-23.pdf20 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A- Quality Assurance Certificate 1.pdf27 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 ambe Darshan.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE 22.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEP 22.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 DEC 22.pdf22 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 23.pdf22 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 June 2022 ONLH - 01 11 2023.pdf21 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 SEPT 2022 ONLH - 01 11 2023.pdf21 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Dec 2022 ONLH - 01 11 2023.pdf21 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Mar 2023 ONLH 01 11 2023.pdf21 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: FULL CC No 39.pdf22 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 39 further CC.pdf14 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf24 May 2022
Layout approvalFile: Bldg No39 Fire NOC.pdf10 May 2022
Building plan approvalFile: Bldg No39 Fire NOC.pdf10 May 2022
Copy of Layout Approval (in case of layout)File: Bldg No39 Fire NOC.pdf10 May 2022
Building Plan Approval / NA Order for plotted developmentFile: Bldg No39 Fire NOC.pdf10 May 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Choice Ambe Darshan- Final Form 3_compressed.pdf10 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200236952931_For_Asset_Based_Search_09_05_2022_16_59_03_619.pdf9 May 2022
Proforma of Allotment letterFile: Building 39 Allotment Letter.pdf9 May 2022
PAN CardFile: PAN CARD - CHOICE DEVLOPERS.pdf7 May 2022
Copy of the legal title reportFile: Bldg No 39 Title report min.pdf15 Mar 2022
Details of encumbrancesFile: 39 declaration of encumbarnces letter.pdf15 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: Mhada letter IOD Bldg No 39 compressed.pdf15 Mar 2022
Declaration about Commencement CertificateFile: 39 FORM-D LETTER.pdf15 Mar 2022
Declaration in FORM BFile: 39 FORM B_compressed.pdf15 Mar 2022
Proforma of Allotment letterFile: AGREEMENT FOR SALE 07_03_2022 (RB).pdf15 Mar 2022

How this compares with Mumbai Suburban

87%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHOICE AMBE DARSHAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANT NAGAR GHATKOPAR (E) MUMBAI6,700+ in Mumbai Suburban

2 kmCHOICE AMBE DARSHANCompleted 122Lapsed / revoked 68Other 118Dot size: filed unitsN

Filed coordinates, straight-line distance. 308 registered projects within 2 km.

Builder: CHOICE DEVELOPER

CHOICE DEVELOPER has 2 registrations on MahaRERA, including CHOICE AMBE KRUPA and CHOICE AMBE DARSHAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that CHOICE AMBE DARSHAN shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if CHOICE AMBE DARSHAN is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHOICE AMBE DARSHAN?

The registered promoter entity is CHOICE DEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHOICE AMBE DARSHAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHOICE AMBE DARSHAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHOICE AMBE DARSHAN?

The professionals named in the filing: Architect: ARCHO CONSULTANTS; Architect: Sachin K Rakshe; Engineer: RAJESH SHAH; Chartered Accountant: SANKET S SHAH & CO; Chartered Accountant: Anuj A Bafna; Chartered Accountant: Rahul Thakkar & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHOICE AMBE DARSHAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHOICE AMBE DARSHAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHOICE AMBE DARSHAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.