Home / Browse projects / Mumbai Suburban, Maharashtra / CHITTARANJAN TOWER

Completed No litigation declared Others project

CHITTARANJAN TOWER

By Narrottam Chittaranjan Sharma

RG-MH-63337 · RERA P51800002797 · Last updated on MahaRERA portal: 18 Nov 2024

Source: official MahaRERA filing

Red flags

  • Completion date moved by 70 months
  • 8 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

CHITTARANJAN TOWER is a Others project by Narrottam Chittaranjan Sharma in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800002797 on 4 Aug 2017. The registration is recorded completed; possession was promised by 31 Oct 2024. The completion date has moved by 70 months from the original filing.

At a glance

Project

  • NameCHITTARANJAN TOWER
  • TypeOthers
  • Location
    • HIRANANDANI CIRCLE
    • POWAI
    • Kurla
    • Mumbai Suburban
    • 400076
  • Pincode400076
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800002797
  • ReraGenie IDRG-MH-63337

Builder

  • NameNarrottam Chittaranjan Sharma
  • Entity typeIndividual
  • Named personNarrottam C Sharma
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2017First promiseDec 2018Revised toOct 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on4 Aug 2017
  • Promised completion31 Oct 2024
  • Revised completionRevised to 31 Oct 2024 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed93 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CHITTARANJAN TOWERNA180000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

CHITTARANJAN TOWER: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities20

As on 18 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
Car lit and passenger liftYes100%
CHIMNEY AND HOBYes100%
MODULAR KITCHENYes100%
VRV VRFYes100%
WATER PURIFIERYes100%

Parking filed41

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots41
Closed/Covered36
Open Space5

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area957 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3025.09
Proposed, not sanctioned1,256 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT NO 148 GROUND FLOOR MUKALADIYIL OPP IIT POWAI MUMBAI -76

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUNIL R DEOLE
EngineerNikhil Sanghavi
Chartered AccountantNaresh Dalmia
PartnerRole in project
Narrottam Chittaranjan Sharma-

Extensions applied for8

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800001374Dec 2018 → Apr 2020

Reason as filed by the promoterMy construction of project got delayed by a year in obtaining permission from Airport authority of India & BMC.

EXT51800013190Dec 2018 → Apr 2023

Reason as filed by the promoterDelay installation of car lifts and passenger lifts by the respective companies i.e Reliance and Mitsubishi, their apology letter to us is uploaded

EXT51800011197Dec 2018 → May 2022

Reason as filed by the promoterNon availability of labours and materials on time.

EXT51800011835Dec 2018 → Dec 2022

Reason as filed by the promoterdelay in completion of car lift and passenger lift installation, the delay is due to lack of manpower, labours not available due to fear of pandemic OMICRON, all fled to native place, so work is getting slow. Hence extension is required. requesting

EXT51800008809Dec 2018 → Jun 2021

Reason as filed by the promoterDue to Pandemic of Covid 19

EXT51800017937Dec 2018 → Feb 2024

Reason as filed by the promoterwe received part occupation certificate, we have uploaded our new application along with sold/unsold details ,kindly grant us RERA certificate up to 28.02.2024

EXT51800016467Dec 2018 → Oct 2023

Reason as filed by the promoterRespected Sir, Earlier we applied for an extension in 7(3) the building is completed in all aspects but only the lift work is pending due to a delay in expedition and official handing over from Mitsubishi and Reliance. The work is pending from their side only and project is all completed. Request you to give extension for our project till 30th October 2023.

EXT51800019195Dec 2018 → Oct 2024

Reason as filed by the promoterOccupation for last floor (17th floor) is pending at Building Proposal, all files and documents uploaded, No work pending at Site. Hence requesting for an extension till 31st October 2024

Litigation declared1

CaseCourtStatus
SUIT/0101215/2015/2015CITY CIVIL COURT MUMBAIKEPT FOR FRAMING ISSUES

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 18 Nov 2024

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2410836_OC_signed.pdf18 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Ar completion Crtfct.pdf18 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Ar completion Crtfct.pdf18 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Ar completion Crtfct.pdf18 Nov 2024
Architect’s Certificate on Completion of Project (Form 4)File: Ar completion Crtfct.pdf18 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2410836_OC_signed.pdf18 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate (1).pdf14 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CRTFCT.pdf13 Mar 2024
Certificates of CA (Form 3)File: CA FORM 3 (3).pdf13 Mar 2024
Declaration in FORM BFile: FORM B DCLRTN.pdf2 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT Rera Certificate 01-03-2024.pdf2 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: dsc ENGINEER QC CRTFCT.pdf2 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and booked inventory (1).pdf2 Mar 2024
Declaration in FORM BFile: Affidavit Cum Declaration.pdf24 Nov 2023
Disclosure of sold/ booked inventoryFile: P51800002797_FileName_5.pdf24 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 2017 18.pdf24 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018 19.pdf24 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form - 5, 2019 -20.pdf24 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 2020 21.pdf24 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 SIGNED 2022-2023.pdf20 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA - Form 5.pdf20 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance 22-23.pdf11 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PART OC PLAN (1).pdf8 Nov 2023
Disclosure of sold/ booked inventoryFile: soldbooked inventory.pdf27 Apr 2023
Disclosure of sold/ booked inventoryFile: Sold- Unsold Inventory Table.pdf13 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 2021.pdf10 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 2022.pdf10 Jan 2023
Other - FinanceFile: encumberance Lien.pdf10 Jan 2023
Other - TechnicalFile: LETTER FROM RELIANCE LIFTS_compressed (1).pdf10 Jan 2023
Other - TechnicalFile: Letter from Mitsubishi for delay PDF.pdf10 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: separate bank escrow.pdf7 Jan 2023
Foreclosure of the ProjectFile: RERA application.pdf7 Jan 2023
Foreclosure of the ProjectFile: Resolution for Extension.pdf7 Jan 2023
Foreclosure of the ProjectFile: reason for Extension.pdf7 Jan 2023
Foreclosure of the ProjectFile: Letter from Mitsubishi for delay PDF.pdf7 Jan 2023
Foreclosure of the ProjectFile: LETTER FROM RELIANCE LIFTS_compressed (1).pdf7 Jan 2023
Details of encumbrances concerned to FinanceFile: encumberance Lien.pdf5 Jan 2023
Details of encumbrances concerned to LegalFile: encumberance Lien.pdf5 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: engineers crtfct.pdf5 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest doc.pdf5 Jan 2023
Proforma of Agreement for saleFile: draft sale.pdf5 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation report and chart.pdf5 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report and chart.pdf5 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: NSG Enterprises_FORM 5_RERA_Certificate_2019-20.pdf9 Feb 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: NSG Enterprises_FORM 5_RERA_Certificate_2020-21.pdf9 Feb 2022
Details of Restarting of Construction work post lockdownFile: work post lockdown.pdf7 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A quality assurance certificate 1.pdf3 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A quality assurance certificate 2.pdf3 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A quality assurance certificate 3.pdf3 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A quality assurance certificate 4.pdf3 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A quality assurance certificate 1.pdf3 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A quality assurance certificate 2.pdf3 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A quality assurance certificate 3.pdf3 Feb 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A quality assurance certificate 4.pdf3 Feb 2022
Declaration about Commencement CertificateFile: DCLRTN ABOUT CC.pdf1 Feb 2022
CERSAI detailsFile: CERSAI REPORT FOR CHITTARANJAN TOWER (1).pdf1 Feb 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE SOLD-UNSOLD.pdf1 Feb 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SOCIETY FORMATION AND CNVYNC.pdf1 Feb 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY FORMATION AND CNVYNC.pdf1 Feb 2022
Status of ConveyanceFile: SOCIETY FORMATION AND CNVYNC.pdf1 Feb 2022
Certificates of CA (Form 3)File: Chittaranjan tower Form -3.pdf28 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: NSG scan 17-18.pdf28 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: NSG scan 18-19.pdf28 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Oct19.pdf25 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA Cost Incurred CRT com.pdf25 Dec 2019
Certificates of CA (Form 3)File: CT April 2019.pdf4 Nov 2019
Certificates of CA (Form 3)File: CT July 2019_Com.pdf4 Nov 2019
Certificates of CA (Form 3)File: RERA_CERTI_AS ON 311018_CT_RERA.pdf30 Apr 2019
Certificates of CA (Form 3)File: RERA_CERTI_AS ON 310119_CT_RERA.pdf30 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf10 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer ceritificate- NSG (1).PDF10 Sep 2018
Certificates of CA (Form 3)File: Form 3 July 2018 _NSG 1.pdf10 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE_NSG_31102017.pdf24 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of cost JD NSG-.pdf24 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Certificate of cost JD NSG-.pdf24 Feb 2018
Certificates of CA (Form 3)File: CA CERTIFICATE_311017.pdf24 Feb 2018
Certificates of CA (Form 3)File: CA CERTIFICATE_311017.pdf24 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE_NSG_31102017.pdf22 Jan 2018
OtherFile: RERA Carpet statement.pdf1 Aug 2017
Layout approvalFile: IOD.pdf30 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Vishranti CHS LtdPadmavati Road IIT Market Gate Powai Mumbai 76Mumbai24CompletedJul 2016Late, Jan 2017
Vishranti SocietyCTS No 10-77 Padmavati Road IIT Powai24CompletedJan 2016Late, Jan 2016
Gayatri CHS Ltdbehind south Indian bank IIT20CompletedFeb 2014Late, Feb 2014

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 70 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHITTARANJAN TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near POWAI6,700+ in Mumbai Suburban

2 kmCHITTARANJAN TOWERCompleted 20Lapsed / revoked 16Other 37Dot size: filed unitsN

Filed coordinates, straight-line distance. 73 registered projects within 2 km.

Builder: Narrottam Chittaranjan Sharma

Narrottam Chittaranjan Sharma has 1 registration on MahaRERA, including CHITTARANJAN TOWER. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if CHITTARANJAN TOWER is delayed beyond 31 Oct 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHITTARANJAN TOWER?

The registered promoter entity is Narrottam Chittaranjan Sharma, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHITTARANJAN TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHITTARANJAN TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHITTARANJAN TOWER?

The professionals named in the filing: Architect: SUNIL R DEOLE; Engineer: Nikhil Sanghavi; Chartered Accountant: Naresh Dalmia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHITTARANJAN TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHITTARANJAN TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHITTARANJAN TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.