Home / Browse projects / Solapur, Maharashtra / Chhoriya Township Wakhari Pandharpur Phase 1

Registration lapsed No litigation declared Mixed project

Chhoriya Township Wakhari Pandharpur Phase 1

By Chhoriya Properties Development Co

RG-MH-24462 · RERA P52600003966 · Last updated on MahaRERA portal: 5 Apr 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 34 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Dec 2023Possession promised34 months past this date
24 of 220Construction stages doneacross 21 buildings; furthest along: Slabs of Super Structure, 75%
19 of 46Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 58 documents Report an error

Chhoriya Township Wakhari Pandharpur Phase 1 is a Mixed project by Chhoriya Properties Development Co in Solapur, Maharashtra, registered with MahaRERA as P52600003966 on 7 Aug 2017. Possession was promised by 30 Dec 2023 and is now 34 months past that date. 27 of the 46 units on this registration are recorded sold or booked, and 24 of 220 construction stages are filed complete.

At a glance

Project

  • NameChhoriya Township Wakhari Pandharpur Phase 1
  • TypeMixed
  • Location
    • Pandharpur Wakhari Road
    • Pandharpur - Wakhari
    • Wakhari
    • Pandharpur
    • Solapur
    • 413304
  • Pincode413304
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600003966
  • ReraGenie IDRG-MH-24462

Builder

  • NameChhoriya Properties Development Co
  • Entity typePartnership
  • PartnersAnmol Kanhaiyalal Chhoriya, Vinay shantilal Chhoriya, Dilip Devichand Jain, Shantilal Devichand Jain
  • Declared earlier projects1 →

Key dates

34 months past promisethis monthRegisteredAug 2017PromisedDec 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on7 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings20 building records
  • Documents filed58 files

Current status

59%27 of 46 units booked

Figures as on 5 Apr 2024, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SB 49AAnd BNA20000
SB 77NA20000
Begonia RH 105 A And BNA20000
Begonia RH 106 A And BNA20000
Orchid Buglow 293 A And BNA20000
Begonia RH 107 A And BNA20000
Begonia RH 108 A And BNA20000
Begonia RH 109 A And BNA20000
Begonia RH 110 A And BNA20000
Begonia RH 111 A And BNA20000
Begonia RH 119 A And BNA20000
Begonia RH 120 A And BNA20000
Begonia RH 114 A And BNA20000
Begonia RH 115 A And BNA20000
Begonia RH 116 A And BNA20000
Begonia RH 117 A And BNA20000
Begonia RH 118 A And BNA20000
Daifodil RH 215 To 219NA20000
Lily Budget 327 AAnd BNA20000
Lily Budget 323 A And BNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 5 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 21 buildings; the table lists the first 20.

24 of 220 construction stages are filed complete across 21 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

SB 49AAnd B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SB 770%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 105 A And B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 106 A And B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Orchid Buglow 293 A And B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 107 A And B31%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 108 A And B34%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 109 A And B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 110 A And B27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 111 A And B31%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure40%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 119 A And B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 120 A And B27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 114 A And B27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 115 A And B27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 116 A And B27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 117 A And B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Begonia RH 118 A And B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Daifodil RH 215 To 2190%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Lily Budget 327 AAnd B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Lily Budget 323 A And B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 5 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes10%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes10%
Street LightingYes10%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
Entrance GateYes80%
Compound WallYes40%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area24,265 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI100241.21
Proposed, not sanctioned100,241 sq m
Buildings approved20

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBibvewadi Kondhawa Bk Pune

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Kunal P Patil
PartnerRole in project
Chhoriya Properties Development Co-

Litigation declared10

CaseCourtStatus
RCS NO 534/2015/2015Honble One Jt Civil Judge Junior Division Pandharpurcase disposed
CMA No 62/2015/2015Honble Third Jt Civil Judge Junior Division Pandharpurcase disposed
Spl CS No 6/2015/2015Honble One Jt Civil Judge Junior Division Pandharpurfor Steps
Spl CS No63/2015/2015Honble One Jt Civil Judge Junior Division Pandharpurfor Argument on Exh
861/2023BARA ivth jt CJJD JMFC PANDHARPURArgument on EXH Unready
861/2023BARA ivth jt CJJD JMFC PANDHARPURArgument on EXH Unready
1151/2023Twenty three vth Jt CJJD JMFC PANDHARPURVerification
63/2014Civil court Senior Division PandharpurArgument on EXH Unready
274/2017Civil court Senior Division PandharpurAmended Plaint
528/2022Civil court Senior Division PandharpurSteps

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed58

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA Wakhari Pandharpur P1 April21-March22.pdf5 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ar pan52 P1 Dec2022_11zon.pdf20 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ER Wakhari pandharpur P1Dec 2022_11zon.pdf20 Mar 2024
Certificates of CA (Form 3)File: Ca pan52 P1 Dec2022_11zon.pdf20 Mar 2024
OtherFile: P52(II).pdf22 Feb 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Wakahri - RERA letter.pdf29 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Wakahri - RERA letter.pdf29 Dec 2023
Certificates of CA (Form 3)File: Wakahri - RERA letter.pdf29 Dec 2023
OtherFile: Wakahri - RERA letter.pdf29 Dec 2023
OtherFile: police complaint__11zon.pdf4 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: CPDC PH I Form 5 FY19 20.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: CPDC PH I Form 5 FY18 19.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: CPDC PH I Form 5 FY19 20.pdf19 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CPDC PH I Form 5 FY20 21.pdf19 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Ar pandharpur phase11.pdf30 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Er pandharpur 52 p1.pdf30 Dec 2022
Certificates of CA (Form 3)File: CA pandharpur 52 P1_11zon.pdf30 Dec 2022
Disclosure of sold/ booked inventoryFile: Pandharpur 52 A-1.pdf28 Dec 2022
Disclosure of sold/ booked inventoryFile: Pandharpur 52A P1.pdf27 Sep 2022
Certificates of CA (Form 3)File: CA Pandharpur 52 P1_11zon.pdf24 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ar pandharpur p1_11zon.pdf23 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Er pandharpur 52 p1_11zon.pdf23 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR CERT WAKHARI PANDHARPUR PHASE 1.pdf4 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER CERT WAKHARI PANDHARPUR PHASE 1.pdf4 Jul 2022
Certificates of CA (Form 3)File: CA certi chhoriya township wakhari pandharpur phase 1.pdf4 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 jan 22 wakhari pandharpur phase 1.pdf1 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 JAN 22 WAKHARI PHASE 1.pdf1 Apr 2022
Certificates of CA (Form 3)File: FORM 3 JAN 22 WAKHARI PHASE 1.pdf1 Apr 2022
Disclosure of sold/ booked inventoryFile: Pandharpur Phase 1.pdf14 Feb 2022
Declaration about Commencement CertificateFile: declaration about commencement cirtificate wakhari phase 1.pdf10 Dec 2021
Certificates of CA (Form 3)File: FORM 3 WAKHARI PANDHARPUR PHASE 1_compressed.pdf23 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SodaPDF-compressed-FORM 1 R M DHARIWAL WAKHARI PHASE 1_compressed_reduce.pdf15 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 R M DHARIWAL GARDEN CITY WAKHARI PLOTTING PANDHARPUR PHASE 1_compressed.pdf15 Oct 2021
OtherFile: Order Copy - 22.pdf19 Jun 2020
OtherFile: Order copy 12.pdf19 Jun 2020
Commencement Certificates / NA Order for plotted developmentFile: Pandharpur 52 Acre Na Order.pdf27 Mar 2018
Layout approvalFile: Pandharpur_Demarcated.pdf31 Jul 2017
Building plan approval or NA orderFile: Lily Budget(319-327).pdf31 Jul 2017
Building plan approval or NA orderFile: Bunglow 2 BHK 77.pdf31 Jul 2017
Building plan approval or NA orderFile: Begonia 2BHK (105-111,115 - 120).pdf31 Jul 2017
Building plan approval or NA orderFile: Orchid (279 A-B).pdf31 Jul 2017
Building plan approval or NA orderFile: Begonia 2BHK (105-111,115 - 120).pdf31 Jul 2017
Layout approvalFile: Phase 1 marking layout Plan Pandharpur 52 acre.pdf31 Jul 2017
PAN CardFile: Chhoriya Properties and Development Co.pdf31 Jul 2017
Copy of the legal title reportFile: Pandharpur 52 Acre Search Report.pdf31 Jul 2017
Details of encumbrancesFile: Pandarpur 52 Acre Encumbrances Certificate.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Pandharpur_Demarcated.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: Phase 1 marking layout Plan Pandharpur 52 acre.pdf31 Jul 2017
Building Plan Approval (IOD)File: Bunglow 2 BHK 77.pdf31 Jul 2017
Building Plan Approval (IOD)File: Lily Budget(319-327).pdf31 Jul 2017
Building Plan Approval (IOD)File: Orchid (279 A-B).pdf31 Jul 2017
Building Plan Approval (IOD)File: Begonia 2BHK (105-111,115 - 120).pdf31 Jul 2017
Building Plan Approval (IOD)File: Begonia 2BHK (105-111,115 - 120).pdf31 Jul 2017
Declaration in FORM BFile: Pandarpur 52 Acre Form -B Declaration.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Cer Akkalkot.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engg Cer akkalkot.pdf31 Jul 2017
Certificates of CA (Form 3)File: phase 1 ca.pdf31 Jul 2017
Proforma of Allotment letterFile: Wakhari_Plot Allotment ATS Sale Deed Draft Construction ATS DRAFT.pdf31 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationStatusPromisedDelivered
R M Dhariwal Township Tembhurni PlottingPost - Tembhurni - Madha - SolapurCompletedDec 2019Dec 2019

How this compares with Solapur

59%of this project is bookeddistrict median 15%
15%of Solapur projects moved their completion datethis one has not
39%of Solapur registrations have lapsed or been cancelledthis one is among them

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep Chhoriya Township Wakhari Pandharpur Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pandharpur - Wakhari550+ in Solapur

2 kmChhoriya Township WakharCompleted 1Lapsed / revoked 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: Chhoriya Properties Development Co

Chhoriya Properties Development Co has 1 registration on MahaRERA, including Chhoriya Township Wakhari Pandharpur Phase 1. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What does it mean that Chhoriya Township Wakhari Pandharpur Phase 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Chhoriya Township Wakhari Pandharpur Phase 1 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Chhoriya Township Wakhari Pandharpur Phase 1?

The registered promoter entity is Chhoriya Properties Development Co, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Chhoriya Township Wakhari Pandharpur Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Chhoriya Township Wakhari Pandharpur Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Chhoriya Township Wakhari Pandharpur Phase 1?

The professionals named in the filing: Architect: Mr Kunal P Patil. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Chhoriya Township Wakhari Pandharpur Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Chhoriya Township Wakhari Pandharpur Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Chhoriya Township Wakhari Pandharpur Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.