Home / Browse projects / Mumbai City, Maharashtra / Chheda Imperial
Chheda Imperial
RG-MH-33069 · RERA P51900080541 · Last updated on MahaRERA portal: 13 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Chheda Imperial is a Others project by Ashapura Developers in Mumbai City, Maharashtra, registered with MahaRERA as P51900080541 on 16 Jun 2025. Possession is promised by 31 Dec 2029.
At a glance
Project
- NameChheda Imperial
- TypeOthers
- Location
- Plot No. 221
- TP Scheme No. 2038
- situated at The Corner of Deodhar Road and Sir Bhalchandra Road
- Matunga
- Fnorth-400019
- Ward FNorth
- Mumbai City
- 400019
- Pincode400019
- RERA no.P51900080541
- ReraGenie IDRG-MH-33069
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 Jun 2025
- Promised completion31 Dec 2029
- Revised completionNone
- Buildings1 building record
- Documents filed70 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Chheda Imperial | NA | 33 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
Chheda Imperial: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 13 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed82
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Yash Yogesh Chheda | Fnorth-400019 | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | B.N. Shah & Associates |
| Architect | Dhruv D Patel |
| Engineer | Dharmendra K Patel |
| Chartered Accountant | Navin & Associates |
| Partner | Role in project |
|---|---|
| Ashapura Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 May 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 3 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Mar 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 3 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2029
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 - Chheda Imperial as on March 2026.pdf | 13 May 2026 |
| Form 2File: Form 2 - Chheda Imperial as on March 2026.pdf | 13 May 2026 |
| Form 3File: Form 3 - Chheda Imperial as on March 2026.pdf | 13 May 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Chheda Imperial as on March 2026.pdf | 13 May 2026 |
| Form 1File: Form 1 - Chheda Imperial as on Dec 2025.pdf | 10 Mar 2026 |
| Form 2File: Form 2 - Chheda Imperial as on Dec 2025.pdf | 10 Mar 2026 |
| Form 3File: Form 3 - Chheda Imperial as on Dec 2025.pdf | 10 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Chheda Imperial as on December 2025.pdf | 10 Mar 2026 |
| Form 1File: Form 1 - Chheda Imperial as on June 2025.pdf | 28 Nov 2025 |
| Form 2File: Form 2 - Chheda Imperial as on June 2025.pdf | 28 Nov 2025 |
| Form 3File: Form 3 - Chheda Imperial as on June 2025.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Chheda Imperial as on June 2025.pdf | 28 Nov 2025 |
| Form 1File: Form 1 - Chheda Imperial as on Sep 2025.pdf | 28 Nov 2025 |
| Form 2File: Form 2 - Chheda Imperial as on Sep 2025.pdf | 28 Nov 2025 |
| Form 3File: Form 3 - Chheda Imperial as on Sep 2025.pdf | 28 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Chheda Imperial as on Sep 2025.pdf | 28 Nov 2025 |
| Other - LegalFile: 2 Other - Legal (7).pdf | 9 Jun 2025 |
| Copy of the legal title reportFile: 09-06-25 Decleration (1).pdf | 28 May 2025 |
| Other - LegalFile: 09-06-25 Decleration (1).pdf | 28 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 14 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 14 May 2025 |
| Proforma of Allotment letterFile: AL.pdf | 5 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Ashapura Developers (2).pdf | 5 Apr 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf | 5 Apr 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation Report Allotment letter.pdf | 5 Apr 2025 |
| Other - FinanceFile: Declaration for Exemption.pdf | 5 Apr 2025 |
| Other - TechnicalFile: 1 Other - Technical (8) (2).pdf | 5 Apr 2025 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report AFS.pdf | 5 Apr 2025 |
| Proforma of Agreement for saleFile: AFS.pdf | 5 Apr 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf | 5 Apr 2025 |
| Declaration in FORM BFile: FORM -B (Promoter).pdf | 19 Mar 2025 |
| Other - LegalFile: 101-135.pdf | 19 Mar 2025 |
| Other - LegalFile: 81-100 POA.pdf | 19 Mar 2025 |
| Other - LegalFile: 61-80 POA.pdf | 19 Mar 2025 |
| Other - LegalFile: 36-60 POA.pdf | 19 Mar 2025 |
| Other - LegalFile: 1-35 POA.pdf | 19 Mar 2025 |
| Other - LegalFile: 211-300.pdf | 19 Mar 2025 |
| Other - LegalFile: 136-210.pdf | 19 Mar 2025 |
| Other - LegalFile: 71-100.pdf | 19 Mar 2025 |
| Other - LegalFile: 1-70.pdf | 19 Mar 2025 |
| Other - LegalFile: Deed Of Assignment - 09-03-2005.pdf | 19 Mar 2025 |
| Other - LegalFile: DA - 07-03-2005.pdf | 19 Mar 2025 |
| Other - LegalFile: 301-350.pdf | 19 Mar 2025 |
| Copy of the legal title reportFile: Title Report.pdf | 10 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (1).pdf | 8 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: 2 a Details of encumbrances concerned to Finance (1).pdf | 8 Mar 2025 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (3) (1).pdf | 8 Mar 2025 |
| CERSAI detailsFile: 1 CERSAI details (1).pdf | 8 Mar 2025 |
| Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (1).pdf | 8 Mar 2025 |
| Details of encumbrances concerned to LegalFile: 2 a Details of encumbrances concerned to Finance (1).pdf | 8 Mar 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (1).pdf | 8 Mar 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 1 Disclosure for secured_unsecured finance availed for the project (1) (1).pdf | 8 Mar 2025 |
| Layout approvalFile: Plan Page 1.pdf | 3 Mar 2025 |
| Building plan approvalFile: Plan Page 1.pdf | 3 Mar 2025 |
| Building plan approvalFile: Plan Page 2.pdf | 3 Mar 2025 |
| Building plan approvalFile: Plan Page 3.pdf | 3 Mar 2025 |
| Building plan approvalFile: Plan Page 4.pdf | 3 Mar 2025 |
| Building plan approvalFile: Plan Page 5.pdf | 3 Mar 2025 |
| Building plan approvalFile: Plan Page 6.pdf | 3 Mar 2025 |
| Building plan approvalFile: Plan Page 7.pdf | 3 Mar 2025 |
| PAN CardFile: Firm Pan Card.pdf | 3 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Plan Page 1.pdf | 3 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: CC.pdf | 3 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 2.pdf | 3 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 7.pdf | 3 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 6.pdf | 3 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 5.pdf | 3 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 4.pdf | 3 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 3.pdf | 3 Mar 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan Page 1.pdf | 3 Mar 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 7 other registrations, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Chheda Imperial on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Matunga780+ in Mumbai City
CODENAME MATUNGA ORIGINS
J. P. INFRA (MUMBAI) PRIVATE LIMITED
SHANTI HEIGHTS
Vipul Shantilal Nagda HUF
Balkrishna Hills
Oriental Contractors Private Limited
VERVE MANSION
SHANTI SIDDHI INFRA LLP
PRINCECARE AMARAA
PRINCECARE AMARAA LLP
Godrej Five Gardens
Godrej Projects Development Ltd.
See every Mumbai City project, with the district possession charts
Builder: Ashapura Developers
ASHAPURA DEVELOPERS has 8 registrations on MahaRERA, including NEELKANTHDHARA and ANANT CORNER. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What are my rights if Chheda Imperial is delayed beyond 31 Dec 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Chheda Imperial?
The registered promoter entity is Ashapura Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Chheda Imperial?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Chheda Imperial?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Chheda Imperial?
The professionals named in the filing: Architect: B.N. Shah & Associates; Architect: Dhruv D Patel; Engineer: Dharmendra K Patel; Chartered Accountant: Navin & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Chheda Imperial?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback