Home / Browse projects / Thane, Maharashtra / CHAVAN ADVAITAM

Registered No litigation declared Others project

CHAVAN ADVAITAM

By SAIDEEP CONSTRUCTIONS

RG-MH-42944 · RERA P51700046731 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 97%
152 of 266Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

CHAVAN ADVAITAM is a Others project by SAIDEEP CONSTRUCTIONS in Thane, Maharashtra, registered with MahaRERA as P51700046731 on 1 Sep 2022. Possession is promised by 31 Dec 2026. 114 of the 266 units on this registration are recorded sold or booked, and 3 of 33 construction stages are filed complete.

At a glance

Project

  • NameCHAVAN ADVAITAM
  • TypeOthers
  • Location
    • Bhiwandi Murbad Highway
    • Near Sandip Hotel
    • Chikanghar
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700046731
  • ReraGenie IDRG-MH-42944

Builder

  • NameSAIDEEP CONSTRUCTIONS
  • Entity typePartnership
  • PartnersSAHEBRAO TRIMBAK CHAVAN, SUNIL SAHEBRAO CHAVAN, MILIND SAHEBRAO CHAVAN, SANGEETA SUNIL CHAVAN, SARITA MILIND CHAVAN
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed122 files

Current status

43%114 of 266 units booked
59.3%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1 ADVAITAM PLAZA/VILLAMENTNA343322836264
BUILDING NO 2 AVAITAM HEIGHTSNA11101
BUILDING NO 3 BUNGLOWNA11101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 97%.

BUILDING NO 1 ADVAITAM PLAZA/VILLAMENT63%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure97%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises66%
Sanitary Fittings within the flats / premises57%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks79%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.48%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.48%
BUILDING NO 2 AVAITAM HEIGHTS0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING NO 3 BUNGLOW0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes4%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed586

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots586
Closed/Covered554
Open Space32
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 1 ADVAITAM PLAZA/VILLAMENT55426580
BUILDING NO 2 AVAITAM HEIGHTS033
BUILDING NO 3 BUNGLOW033

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,896 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
MADHUKAR BALARAM BHOIRChikangharThane
SUBHASH BALARAM BHOIRChikangharThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPAL CORPORATION
Permissible FSI28086.93
Proposed, not sanctioned28,087 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKHADAKPADA, KALYAN WEST
Estimated costRs 120.28 cr
Cost incurredRs 71.32 cr
Work done59.3%
BuildingWingEstimatedIncurred
BUILDING NO 1 ADVAITAM PLAZA/VILLAMENTNARs 112.76 crRs 71.32 cr
-NARs 7.52 cr-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDESIGN CONSORTIUM
EngineerAJAY MAHALE & ASSOCIATES
Chartered AccountantBHARTI RUPESH & ASSOCIATES
PartnerRole in project
SAIDEEP CONSTRUCTIONS-

Litigation declared1

CaseCourtStatus
7/2020Distric Judge KayanPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form_1_Advaitam_31_03_2026_Sign.pdf9 Jun 2026
Withdrawal Update Form 2File: Form-2 Advaitam_31_03_2026.pdf9 Jun 2026
Withdrawal Update Form 3File: Form3_Chavan Advaitam_31_03_2026_New.pdf9 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf18 May 2026
Withdrawal Update Form 1File: Form_1_Chavan Advaitam_30_09_2025_Final.pdf18 May 2026
Withdrawal Update Form 1File: FORM 1 DECEMBER 2025_ADVAITAM.pdf18 May 2026
Withdrawal Update Form 2File: Form_2_30_06_2025.pdf18 May 2026
Withdrawal Update Form 2File: Adavaitam Form 2 Sep 2025.pdf18 May 2026
Withdrawal Update Form 2File: Adavaitam Form 2 Dec 2025.pdf18 May 2026
Withdrawal Update Form 3File: FORM_3_30_06_2025_compressed.pdf18 May 2026
Withdrawal Update Form 3File: Form_3_30_09_2025_Advaitam.pdf18 May 2026
Withdrawal Update Form 3File: Form_3_31_12_2026_Advaitam.pdf18 May 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_30_09_2023.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_31_12_2023.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_31_03_2024.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_30_06_2024.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_30_09_2024.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_31_12_2024.pdf21 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_30_06_2023.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_31_12_2024.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30_09_2024_compressed.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_30_06_2024_compressed.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_31_12_2023.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_30_09_2023.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_30_06_2023.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_31_03_2024.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30_06_2024.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_31_12_2024.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30_09_2024.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31_03_2024.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_31_12_2023.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30_09_2023.pdf21 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_30_06_2023.pdf21 May 2025
Declaration about Commencement CertificateFile: Revised CC_Chavan Advaitam.pdf21 May 2025
Other - TechnicalFile: CC Verification Email.pdf21 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form_2A_31_03_2023.pdf21 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - 31_03_2023.pdf21 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form_2A_31_03_2024.pdf21 May 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: Form 5 - 31_03_2024.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chavan Advaitam form 3.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ADVAITAM_SIGN.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_Architect Certificate.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form_3_Final_11zon.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form_2_Engineer Certifcate.pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf27 Mar 2025
Declaration about Commencement CertificateFile: Declaration of Commencement.pdf27 Mar 2025
Layout approvalFile: Layout_Revised_1.pdf3 Mar 2025
Building plan approvalFile: BUILDING Layout_Revised_1-8.pdf3 Mar 2025
Building plan approvalFile: BUILDING Layout_Revised_9-16.pdf3 Mar 2025
Copy of Layout Approval (in case of layout)File: Layout_Revised_1.pdf3 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised CC_Chavan Advaitam.pdf3 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: BUILDING Layout_Revised_1-8.pdf3 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: BUILDING Layout_Revised_9-16.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf28 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2.pdf28 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_compressed.pdf27 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC-2023.pdf25 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 MAR-2024.pdf25 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Dec 23.pdf19 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: March 24.pdf19 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (2).pdf19 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 DEC 23_compressed.pdf19 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 MARCH 24_compressed.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Chavan Advaitam.pdf28 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 Engineers Certificate Chavan Advaitam.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Chavan Advaitam.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 MARCH 23.pdf7 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 JUNE-2023.pdf7 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 December 22.pdf21 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 December 22.pdf21 Jul 2023
Building plan approvalFile: PLAN SHEET NO 1.pdf4 Mar 2023
Building plan approvalFile: PLAN SHEET NO 2.pdf4 Mar 2023
Building plan approvalFile: PLAN SHEET NO 3.pdf4 Mar 2023
Building plan approvalFile: PLAN SHEET NO 4.pdf4 Mar 2023
Building plan approvalFile: PLAN SHEET NO 5.pdf4 Mar 2023
Building plan approvalFile: PLAN SHEET NO 6.pdf4 Mar 2023
Building plan approvalFile: PLAN SHEET NO 7.pdf4 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN SHEET NO 1.pdf4 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN SHEET NO 2.pdf4 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN SHEET NO 3.pdf4 Mar 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
SAI VINAYAK RESIDENCYNear Chatri Bunglow Chikanghar Kalyan West Dist Thane 421301130CompletedJan 2016Jan 2016

How this compares with Thane

43%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHAVAN ADVAITAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Sandip Hotel7,600+ in Thane

2 kmCHAVAN ADVAITAMCompleted 87Lapsed / revoked 48Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 277 registered projects within 2 km.

Builder: SAIDEEP CONSTRUCTIONS

SAIDEEP CONSTRUCTIONS has 1 registration on MahaRERA, including CHAVAN ADVAITAM. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if CHAVAN ADVAITAM is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHAVAN ADVAITAM?

The registered promoter entity is SAIDEEP CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHAVAN ADVAITAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHAVAN ADVAITAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHAVAN ADVAITAM?

The professionals named in the filing: Architect: DESIGN CONSORTIUM; Engineer: AJAY MAHALE & ASSOCIATES; Chartered Accountant: BHARTI RUPESH & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHAVAN ADVAITAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHAVAN ADVAITAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHAVAN ADVAITAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.