Home / Browse projects / Thane, Maharashtra / CHARMS GLOBAL CITY - TYPE B2 - EIFFEL
CHARMS GLOBAL CITY - TYPE B2 - EIFFEL
RG-MH-77581 · RERA P51700046249 · Last updated on MahaRERA portal: 20 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 9 months
- 1 extension taken
- Rs 60.00 crore secured on the land, in favour of Kotak Mahindra Investments Ltd
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CHARMS GLOBAL CITY - TYPE B2 - EIFFEL is a Residential / Group Housing project by CHARMS GLOBAL in Thane, Maharashtra, registered with MahaRERA as P51700046249 on 20 Jun 2022. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 9 months from the original filing. 129 of the 188 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameCHARMS GLOBAL CITY - TYPE B2 - EIFFEL
- TypeResidential / Group Housing
- Location
- MORIVALI
- AMBARNATH
- Ambarnath(M Cl)
- Thane
- 421501
- Pincode421501
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700046249
- ReraGenie IDRG-MH-77581
Builder
- NameCHARMS GLOBAL
- Entity typePartnership
- PartnersRAMESH RAVJIBHAI PATEL, DHIRAJ GOVIND PATEL, JOHN MATHEW, NAVIN GOVIND PATEL, MAHENDRA GOVIND PATEL, BHARAT GOVIND VASANI, SANJAY DHONDU BORGAONKAR, DEVRAM DEVSHI PATEL, RAVJIBHAI RAMJI PATEL, SUDHEER RANGNATH SULE, GEETA RATILAL PATEL
- Other registrations2 more →
- Completed2 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on20 Jun 2022
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 30 Jun 2025)
- Buildings1 building record
- Documents filed101 files
Current status
Figures as on 20 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TYPE B2 EIFFEL | NA | 18 | 16 | 188 | 0 | 188 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is External plumbing and external plaster, at 98%.
TYPE B2 EIFFEL: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 94% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 97% |
| Sanitary Fittings within the flats / premises | 33% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 93% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 98% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 76% |
Progress on shared amenities15
As on 20 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 92% |
| Water Supply | Yes | 76% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 98% |
| Landscaping & Tree Planting | Yes | 28% |
| Street Lighting | Yes | 33% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 95% |
| Energy managemcnt | Yes | 96% |
| Fire protection and fire safety requirements | Yes | 77% |
| Electrical meter room, sub-station, receiving station | Yes | 85% |
| Aggregate area of recreational Open Space | Yes | 92% |
| Open Parking | Yes | 95% |
Parking filed270
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TYPE B2 EIFFEL | NA | Rs 40.22 cr | Rs 34.55 cr |
| - | NA | Rs 4.97 cr | Rs 4.29 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shailaja Vaidya |
| Engineer | PATEL KULKARNI CONSULTANTS |
| Engineer | LEELA CONSTRUCTION Ashok Panchal |
| Engineer | SUSHANT SALUNKHE |
| Chartered Accountant | KARTIK JAYANTILAL PATEL Kartik Patel |
| Chartered Accountant | VELANI AND POKAR |
| Partner | Role in project |
|---|---|
| CHARMS GLOBAL | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. The inconsistent availability of manpower has made it extremely difficult to maintain continuity of work on-site. Despite taking proactive measures such as engaging additional contractors and sourcing labour from alternate regions, the issue has persisted due to broader regional and industry-wide constraints. 2. The Ambernath region experienced prolonged and higher-than-average rainfall during the last monsoon season, which extended beyond the typical timeframe. This resulted in waterlogging, site inaccessibility, and safety hazards, leading to a complete halt of construction activity for e
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Apr 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Apr 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: B-2 Architect Cerificate Dec-25.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Engineers Certificate.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Withdrawal Application Form3.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: B-2 Architect Cerificate Sep-25.pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: Withdrawal Application Form3 Scanned.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: Withdrawal Application Form3.pdf | 19 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5_24_25.pdf | 30 Sep 2025 |
| Form 2A (FY 2022-2023)File: Form 2A 22-23.pdf | 2 Jul 2025 |
| Form 2A (FY 2023-2024)File: Form 2A 23-24.pdf | 2 Jul 2025 |
| Form 1File: June 22.pdf | 1 Jul 2025 |
| Form 2File: June 22.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: June 22.pdf | 1 Jul 2025 |
| Form 3File: CA - June 22.pdf | 1 Jul 2025 |
| Form 1File: Sept 22.pdf | 1 Jul 2025 |
| Form 2File: Sept 22.pdf | 1 Jul 2025 |
| Form 3File: CA - Sep 22.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sept 22.pdf | 1 Jul 2025 |
| Form 1File: AR - Dec 22.pdf | 1 Jul 2025 |
| Form 2File: ER - Dec 22.PDF | 1 Jul 2025 |
| Form 3File: CA - Dec 22.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Dec 22.pdf | 1 Jul 2025 |
| Form 1File: AR - March 23.pdf | 1 Jul 2025 |
| Form 2File: ER - March 23.PDF | 1 Jul 2025 |
| Form 3File: CA - March 23.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: MARCH 23.PDF | 1 Jul 2025 |
| Form 1File: AR - June 23.pdf | 1 Jul 2025 |
| Form 2File: ER - June 23.PDF | 1 Jul 2025 |
| Form 3File: CA - June 23.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: June 23.pdf | 1 Jul 2025 |
| Form 1File: Sept 23.pdf | 1 Jul 2025 |
| Form 2File: Sept 23.pdf | 1 Jul 2025 |
| Form 3File: CA - Sep 23.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sept 23.pdf | 1 Jul 2025 |
| Form 1File: Dec 23.pdf | 1 Jul 2025 |
| Form 2File: Dec 23.pdf | 1 Jul 2025 |
| Form 3File: CA - Dec 23.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Dec 23.pdf | 1 Jul 2025 |
| Form 1File: AR - March 24.pdf | 1 Jul 2025 |
| Form 2File: March 24.pdf | 1 Jul 2025 |
| Form 3File: CA - March 24.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: March 24.pdf | 1 Jul 2025 |
| Form 1File: June 24.pdf | 1 Jul 2025 |
| Form 2File: June 24.pdf | 1 Jul 2025 |
| Form 3File: CA - June 24.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: June 24.pdf | 1 Jul 2025 |
| Form 1File: Sept 24.pdf | 1 Jul 2025 |
| Form 2File: ER - Sep 24.pdf | 1 Jul 2025 |
| Form 3File: CA - Sep 24.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sept 24.pdf | 1 Jul 2025 |
| Form 1File: AR - Dec 24.pdf | 1 Jul 2025 |
| Form 2File: ER - Dec 24.pdf | 1 Jul 2025 |
| Form 3File: CA - Dec 24.pdf | 1 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Dec 24.pdf | 1 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 24-25.pdf | 1 Jul 2025 |
| Form 5 (FY 2022-2023)File: Form 5 F Y 22-23.pdf | 26 Jun 2025 |
| Form 5 (FY 2023-2024)File: Annual Audit Report of Statutory CA (Form 5) (FY 2023-24).pdf | 12 Jun 2025 |
| Form 1File: AR.pdf | 11 Jun 2025 |
| Form 2File: ER.pdf | 11 Jun 2025 |
| Form 3File: CA.pdf | 11 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclsoure.pdf | 11 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Quarterly Progress.pdf | 11 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate 31_03_2025 EFFILE.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B-2 Engineers Certificate Mar-25.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: B2 Eiffel Disclosure of Sold-Unsold Inventory 31_03_2025.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B-2 Architect Certificate Mar-25.pdf | 15 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: B2 Eiffel Disclosure of Sold-Unsold Inventory311122024.pdf | 5 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B-2 ARCHITECT'S CERTIFICATE-DEC-24.pdf | 4 Mar 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: B-2 ENGGINEERS CERTIFICATE - DEC-24.pdf | 4 Mar 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A B-2 DEC-24.pdf | 4 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 B2.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: B-2 Form 3.pdf | 4 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24.pdf | 17 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Adobe Scan 19 Apr 2024.pdf | 22 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DMD March-24.pdf | 19 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Q1 -B2 FORM2A-ENDING MARCH 2023.pdf | 11 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Eiffel_compressed.pdf | 5 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Effiel 31032023_Compressed.pdf | 6 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q1-B2-ARCHITECT'S CERTIFICATE - 2023.pdf | 5 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q4 -B2-Form 2 Engineer Ceritificate - 2023.PDF | 5 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep CHARMS GLOBAL CITY - TYPE B2 - EIFFEL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AMBARNATH7,600+ in Thane
Filed coordinates, straight-line distance. 159 registered projects within 2 km.
CHADHA RESIDENCY
CHADHA DEVELOPERS AND PROMOTERS
KRUSHNA VIHAR - PHASE I
KRUSHAN DHAM BUILDERS & DEVELOPERS
VISHWAJEET MYSPACE
GULABRAO BABURAO KARANJULE PATIL
KHATRI SPARSH
KHATRI REALTY
Tulsi Galaxy
Manas Associates
WALEKAR HOMES
WALEKAR & SON'S DEVELOPERS
See every Thane project, with the district possession charts
Builder: CHARMS GLOBAL
CHARMS GLOBAL has 3 registrations on MahaRERA, including CHARMS GLOBAL CITY - TYPE A1 - LIBERTY and CHARMS GLOBAL CITY - TYPE- B1-MERLION. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that CHARMS GLOBAL CITY - TYPE B2 - EIFFEL shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if CHARMS GLOBAL CITY - TYPE B2 - EIFFEL is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CHARMS GLOBAL CITY - TYPE B2 - EIFFEL?
The registered promoter entity is CHARMS GLOBAL, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CHARMS GLOBAL CITY - TYPE B2 - EIFFEL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CHARMS GLOBAL CITY - TYPE B2 - EIFFEL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CHARMS GLOBAL CITY - TYPE B2 - EIFFEL?
The professionals named in the filing: Architect: Shailaja Vaidya; Engineer: PATEL KULKARNI CONSULTANTS; Engineer: LEELA CONSTRUCTION Ashok Panchal; Engineer: SUSHANT SALUNKHE; Chartered Accountant: KARTIK JAYANTILAL PATEL Kartik Patel; Chartered Accountant: VELANI AND POKAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CHARMS GLOBAL CITY - TYPE B2 - EIFFEL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback