CHARMS GLOBAL CITY - TYPE A1 - LIBERTY
RG-MH-04471 · RERA P51700021983 · Last updated on MahaRERA portal: 6 May 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 18 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CHARMS GLOBAL CITY - TYPE A1 - LIBERTY is a Others project by CHARMS GLOBAL in Thane, Maharashtra, registered with MahaRERA as P51700021983 on 25 Aug 2019. The registration is recorded completed; possession was promised by 30 Jun 2025. The completion date has moved by 18 months from the original filing.
At a glance
Project
- NameCHARMS GLOBAL CITY - TYPE A1 - LIBERTY
- TypeOthers
- Location
- AMBERNATH
- Ambarnath(M Cl)
- Ambarnath
- Thane
- 421501
- Pincode421501
- RERA no.P51700021983
- ReraGenie IDRG-MH-04471
Builder
- NameCHARMS GLOBAL
- Entity typePartnership
- PartnersRAMESH RAVJIBHAI PATEL, DHIRAJ GOVIND PATEL, JOHN MATHEW, NAVIN GOVIND PATEL, MAHENDRA GOVIND PATEL, BHARAT GOVIND VASANI, SANJAY DHONDU BORGAONKAR, DEVRAM DEVSHI PATEL, RAVJIBHAI RAMJI PATEL, SUDHEER RANGNATH SULE, GEETA RATILAL PATEL
- Other registrations2 more →
- Completed2 of 3
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on25 Aug 2019
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Dec 2023)
- Buildings1 building record
- Documents filed98 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TYPE A1 - LIBERTY | NA | 16 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 6 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 97%.
TYPE A1 - LIBERTY: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 97% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities16
As on 6 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 85% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 80% |
| Open Parking | Yes | 50% |
| Basement parking adjoining B1 Bldg | Yes | 100% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DMD ARCHITECTS |
| Engineer | LEELA CONSTRUCTION |
| Engineer | PATEL KULKARNI CONSULTANTS |
| Chartered Accountant | VELANI & POKAR |
| Chartered Accountant | KARTIK JAYANTILAL PATEL |
| Partner | Role in project |
|---|---|
| CHARMS GLOBAL | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Sir, Regarding Project CHARMS GLOBAL CITY TYPE A1 LIBERTY registered with Maharera with Registration Number P51700021983. The date of completion of project is 30.12.2023. We would like to convey that due to certain unavoidable circumstances, the completion of the Project has been delayed. The shortage and highly interrupted supply of construction material at Ambernath caused delay in execution by the contractor to complete the work as per the scheduled plan of execution. The project is on the verge of completion with 95% of the works completed and getting ready for OC application and Poss
Reason as filed by the promoter• Part Occupancy Certificate for Charms Global City - Type A1 - Liberty from Stilt/Lower Ground Floor (p) + Upper Ground Floor (p) + Thirteen Floors and Club House (Full) vide Occupation Certificate no. AMC/NRV/2024-25/21 of Ambernath Municipal Council dated 04/04/2024. • OC for Ground Floor (Commercial) is not received till date; hence we apply for Extension up to 30/06/2025. • We are obtaining consent from the allottees of the Ground Floor regarding the pending OC, ensuring their awareness and agreement.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Feb 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Feb 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 6 May 2025
Documents filed98
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OC Copy.pdf | 6 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Liberty CA Certificate 31_03_2025.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A-1 Engineers Certificate Mar-25.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: A1 Liberty Disclosure of Sold-Unsold Inventory 31-03-2025.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A-1 Architect Certificate Mar-25.pdf | 15 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Dec-24.pdf | 5 Mar 2025 |
| Details of encumbrances concerned to FinanceFile: Annexure K-Encumbrance Concerned to Finance.pdf | 27 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Q3.pdf | 27 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Jan 25_compressed.pdf | 27 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q3.pdf | 27 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Unsold Inventory 31-12-2024.pdf | 27 Jan 2025 |
| CERSAI detailsFile: Annexure G-Asset Based Declaration.pdf | 27 Jan 2025 |
| CERSAI detailsFile: Annexure L- Debtor Based Declaration.pdf | 27 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Annexure K-Encumbrance Concerned to Finance.pdf | 27 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_FY 23-24.pdf | 27 Jan 2025 |
| Declaration in FORM BFile: Form B_30 June 25.pdf | 23 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: From 5 23-24.pdf | 17 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: A1 Liberty Disclosure of Sold-Unsold Inventory 30-11-2024.pdf | 15 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Bharat Vasani.pdf | 15 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Sudheer Sule.pdf | 15 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Sanjay Borgaonkar.pdf | 15 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Ravjibhai Patel.pdf | 15 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Ramesh Patel.pdf | 15 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Rajesh Patel.pdf | 15 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Navin Patel.pdf | 15 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Mahendra Patel.pdf | 15 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- John Mathew.pdf | 15 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Geeta Patel.pdf | 15 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Dhiraj Patel.pdf | 15 Dec 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest- Devram Patel.pdf | 15 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A-1 Architect certificate Nov-24.pdf | 14 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A-1 Architect certificate Sep-24.pdf | 14 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A1 Enginners Certificate Sep-24.pdf | 14 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: A1 Engineers Certificate Nov-24.pdf | 14 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: A1 LIBERTY - FORM 2A ENDING JUNE 2023.pdf | 14 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A-1 Architect certificate Jun-24.pdf | 12 Aug 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC.pdf | 6 Apr 2024 |
| Declaration about Commencement CertificateFile: CC DECLARATION.pdf | 19 Dec 2023 |
| Declaration in FORM BFile: FORM B.pdf | 19 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1.pdf | 19 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf | 19 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Q1-A1-FORM2A- MARCH ENDING 2023.pdf | 11 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure.pdf | 11 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 A1 Liberty_compressed.pdf | 5 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: A1 - Liberty.PDF | 5 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA Certificate 31032023.pdf | 5 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A1 - Q4 - LIBERTY ARCHITECT'S CERTIFICATE.pdf | 13 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Liberty 31122022 Uploaded.pdf | 9 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Q4-A1-2022- FORM2A- DECEMBER ENDING 2022.pdf | 7 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate.PDF | 6 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate.PDF | 6 Feb 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200259487197_For_Asset_Based_Search_04_02_2023_11_56_18_032.pdf | 4 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf | 4 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Liberty 21-22.pdf | 1 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: A1 Inventory Disclosure by promoter.PDF | 18 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Charms global A1.pdf | 4 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Liberty.PDF | 4 Oct 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Liberty Form 2.PDF | 4 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Liberty uploaded.pdf | 4 Oct 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Liberty Uploaded.pdf | 4 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: A1 Liberty Inventory Disclosure by promoter.PDF | 22 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: A1 Liberty Inventory Disclosure by promoter.PDF | 22 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-4 21-22 A1 liberty.pdf | 14 Apr 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-3 21-22 A1 Liberty.pdf | 9 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-2 Form 2 of 2021-22.PDF | 9 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of inventory Q-3 of 21-22.PDF | 7 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Q-2 Form 2A of 2021-22.PDF | 7 Dec 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-2 21-22.pdf | 24 Nov 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q-1 21-22.pdf | 24 Nov 2021 |
| Disclosure of sold/ booked inventoryFile: Discloser of Inventory Q-2 of 21-22.PDF | 7 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form - 5 - A1 Liberty.pdf | 30 Sep 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF | 27 Aug 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 27 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate - A1 - Q 1.PDF | 16 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure - A-1 Liberty.PDF | 17 Jul 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf | 12 Jul 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RERA Certificate.pdf | 9 Jun 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.PDF | 1 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A.pdf | 1 Jun 2021 |
| Proforma of Allotment letterFile: DRAFT AGREEMENT FOR SALE AND ALLOTMENT LETTER.pdf | 7 Sep 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 98 filed documents as one ZIP, foldered, with a manifest
Keep CHARMS GLOBAL CITY - TYPE A1 - LIBERTY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near AMBERNATH7,600+ in Thane
CHADHA RESIDENCY
CHADHA DEVELOPERS AND PROMOTERS
KRUSHNA VIHAR - PHASE I
KRUSHAN DHAM BUILDERS & DEVELOPERS
VISHWAJEET MYSPACE
GULABRAO BABURAO KARANJULE PATIL
KHATRI SPARSH
KHATRI REALTY
Tulsi Galaxy
Manas Associates
WALEKAR HOMES
WALEKAR & SON'S DEVELOPERS
See every Thane project, with the district possession charts
Builder: CHARMS GLOBAL
CHARMS GLOBAL has 3 registrations on MahaRERA, including CHARMS GLOBAL CITY - TYPE A1 - LIBERTY and CHARMS GLOBAL CITY - TYPE- B1-MERLION. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if CHARMS GLOBAL CITY - TYPE A1 - LIBERTY is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CHARMS GLOBAL CITY - TYPE A1 - LIBERTY?
The registered promoter entity is CHARMS GLOBAL, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CHARMS GLOBAL CITY - TYPE A1 - LIBERTY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CHARMS GLOBAL CITY - TYPE A1 - LIBERTY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CHARMS GLOBAL CITY - TYPE A1 - LIBERTY?
The professionals named in the filing: Architect: DMD ARCHITECTS; Engineer: LEELA CONSTRUCTION; Engineer: PATEL KULKARNI CONSULTANTS; Chartered Accountant: VELANI & POKAR; Chartered Accountant: KARTIK JAYANTILAL PATEL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CHARMS GLOBAL CITY - TYPE A1 - LIBERTY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.