ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / CHARMS CITY B AND C WING

Registered No litigation declared Residential / Group Housing project

CHARMS CITY B AND C WING

By Charms Developers

RG-MH-97953 · RERA P51700049561 · Last updated on MahaRERA portal: 13 Dec 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 7 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 70%
73 of 103Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 104 documents Report an error

CHARMS CITY B AND C WING is a Residential / Group Housing project by Charms Developers in Thane, Maharashtra, registered with MahaRERA as P51700049561 on 15 Feb 2023. Possession is promised by 31 Dec 2028. 30 of the 103 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameCHARMS CITY B AND C WING
  • TypeResidential / Group Housing
  • Location
    • MAUJE MANDA
    • KALYAN WEST
    • Manda
    • Kalyan
    • Thane
    • 421605
  • Pincode421605
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700049561
  • ReraGenie IDRG-MH-97953

Builder

  • NameCharms Developers
  • Entity typePartnership
  • PartnersJohn Mathew, Dhiraj Govind Patel, Sanjay Dhondu Borgaonkar, Bharat Pralhad Shah, Bharat Govind Vasani, Rajendra Devram Patel, Pradeep Purushottam Velani, Vishram Murji Gori, Deepak Shivji Patel, Gangaram Rajaram Sheganti, Bhavesh Popatlal Velani, Vishram Lalji Patel and 1 more
  • Other registrations7 more →
  • Completed2 of 8
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Feb 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed104 files

Current status

29%30 of 103 units booked
57.4%Work done, per cost certificate

Figures as on 13 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA8847047
C WINGNA8856056

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 13 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 70%.

B WING50%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
C WING43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered23
BuildingClosed/CoveredTotal
B WING33
C WING2020

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,430 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityKDMC
Permissible FSI7104.04
Proposed, not sanctioned7,104 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGODBUNDER ROAD
Estimated costRs 16.72 cr
Cost incurredRs 9.60 cr
Work done57.4%
BuildingWingEstimatedIncurred
C WINGNARs 10.03 crRs 5.32 cr
B WINGNARs 6.69 crRs 4.28 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVARGHESE JOHN
EngineerAjay Mahale
EngineerNITHYA THOMAS
Chartered AccountantMEDHA JVELANI
Chartered AccountantHARISH OMPRAKASH GUPTA
PartnerRole in project
Charms Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed104

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Charms Developers 28, 2024 4-44 PM.pdf13 Dec 2025
Withdrawal Update Form 1File: Charms Developers 28, 2024 4-44 PM.pdf13 Dec 2025
Withdrawal Update Form 2File: charms developer city Bu0026C wing form 2.pdf13 Dec 2025
Withdrawal Update Form 2File: charms developer city Bu0026C wing form 2.pdf13 Dec 2025
Withdrawal Update Form 3File: City B u0026 C June 25 Form 3.pdf13 Dec 2025
Withdrawal Update Form 3File: City B u0026 C June 25 Form 3.pdf13 Dec 2025
Form 1File: Architect Certificate.pdf15 Aug 2025
Form 2File: Engineer Form 2 B & C Wing September 2023 Signed.pdf15 Aug 2025
Form 3File: Form 3 September 23.pdf15 Aug 2025
Disclosure of Sold and Booked InventoryFile: LIST OF INVENTORY September 24.pdf15 Aug 2025
Form 1File: Architect Certificate.pdf15 Aug 2025
Form 2File: Engineer Form 2 B & C Wing September 2023 Signed.pdf15 Aug 2025
Form 3File: Form 3 September 23.pdf15 Aug 2025
Disclosure of Sold and Booked InventoryFile: LIST OF INVENTORY June 24.pdf15 Aug 2025
Form 3File: 2_Final_Form 3 Charms City B and C Wing (1).pdf15 Aug 2025
Disclosure of Sold and Booked InventoryFile: LIST OF INVENTORY March 24.pdf15 Aug 2025
Form 1File: Architect Certificate.pdf15 Aug 2025
Form 2File: Engineer Certificate Charms City.pdf15 Aug 2025
Form 2File: Engineer Certificate Charms City.pdf15 Aug 2025
Form 1File: Architect Certificate Charms City B & C Wing Final.pdf15 Aug 2025
Form 3File: Form 3 Charms City B and C Wing.pdf15 Aug 2025
Disclosure of Sold and Booked InventoryFile: LIST OF INVENTORY June 24.pdf15 Aug 2025
Form 3File: Form 3_CA Certificate Charms City Phase I B & C Wing RERA_31 (2).pdf14 Aug 2025
Form 1File: Architect Certificate.pdf14 Aug 2025
Form 2File: Engineer Form 2 March 2025.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory March 2025.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Dec 2024.pdf14 Aug 2025
Form 2File: Engineer Form 2 Dec 2024.pdf14 Aug 2025
Form 1File: Architect Certificate.pdf14 Aug 2025
Form 3File: Form 3_CA Certificate Charms City Phase I B & C Wing RERA_31 (3).pdf14 Aug 2025
Form 1File: Architect Certificate.pdf14 Aug 2025
Form 2File: Engineer Form 2 Sep 24.pdf14 Aug 2025
Form 3File: Form3September24.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: LIST OF INVENTORY September 24.pdf14 Aug 2025
Form 1File: Architect Certificate.pdf14 Aug 2025
Form 2File: Engineer Form 2 June 24.pdf14 Aug 2025
Form 3File: Form 3 June 2024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: LIST OF INVENTORY June 24.pdf14 Aug 2025
Form 1File: Architect Certificate.pdf14 Aug 2025
Form 2File: Engineer Form 2 March 24.pdf14 Aug 2025
Form 3File: Form 3 March 2024.pdf14 Aug 2025
Disclosure of Sold and Booked InventoryFile: LIST OF INVENTORY March 24.pdf14 Aug 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 Charms City 23-24.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 March 2024_compressed.pdf2 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 June 2024_compressed.pdf2 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 September 24_compressed.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 March 24.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 June 24.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Sep 24.pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: LIST OF INVENTORY March 24.pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: LIST OF INVENTORY June 24.pdf2 Jan 2025
Disclosure of sold/ booked inventoryFile: LIST OF INVENTORY September 24.pdf2 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate for Quality Assurance Dec 23.pdf2 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate for Quality Assurance Mar 24.pdf2 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate for Quality Assurance June 24.pdf2 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate for Quality Assurance Sep 24.pdf2 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate for Quality Assurance Dec 24.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Charms Developers 28, 2024 4-44 PM.pdf13 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Dec.pdf13 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2023.pdf13 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 Charms City B and C Wing.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf22 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate for Quality Assurance Sept 23 Signed.pdf22 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer Certificate for Quality Assurance Sept 23 Signed.pdf22 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf22 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf22 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Signed.pdf12 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf12 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf10 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 June 2023 Signed.pdf10 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate June 23.pdf10 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Charms City B and C Wing March 2023.pdf10 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: cc supporting letter.pdf27 Jan 2023
Copy of the legal title reportFile: TITLE REPORT FINAL.pdf24 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_1-6.pdf4 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_7-11.pdf4 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A_12-end.pdf4 Jan 2023
Proforma of Agreement for saleFile: FINAL AGRREEMENT FOR SALE.pdf29 Dec 2022
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development.pdf22 Dec 2022
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf22 Dec 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
CHARMS HEIGHTS PHASE-II A1-A2P51700002670Titwala, ThaneAug 2017CompletedMar 2021Registered original: Mar 2019May 2018

How this compares with Thane

29%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHARMS CITY B AND C WING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KALYAN WEST7,600+ in Thane

2 kmCHARMS CITY B AND C WINGCompleted 23Lapsed / revoked 13Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: Charms Developers

Charms Developers has 8 registrations on MahaRERA, including CHARMS HEIGHTS PHASE-II A1-A2 and CHARMS HEIGHTS PHASE-III B2-B3. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if CHARMS CITY B AND C WING is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHARMS CITY B AND C WING?

The registered promoter entity is Charms Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHARMS CITY B AND C WING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHARMS CITY B AND C WING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHARMS CITY B AND C WING?

The professionals named in the filing: Architect: VARGHESE JOHN; Engineer: Ajay Mahale; Engineer: NITHYA THOMAS; Chartered Accountant: MEDHA JVELANI; Chartered Accountant: HARISH OMPRAKASH GUPTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHARMS CITY B AND C WING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHARMS CITY B AND C WING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHARMS CITY B AND C WING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.