Home / Browse projects / Mumbai Suburban, Maharashtra / Chandraraj Complex

Completed No litigation declared Others project

Chandraraj Complex

By Shree Sai Shraddha Associates

RG-MH-24078 · RERA P51800010076 · Last updated on MahaRERA portal: 21 Feb 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 105 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

Chandraraj Complex is a Others project by Shree Sai Shraddha Associates in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010076 on 23 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2026. The completion date has moved by 105 months from the original filing.

At a glance

Project

  • NameChandraraj Complex
  • TypeOthers
  • Location
    • Chincholi Bunder Road
    • Malad West
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800010076
  • ReraGenie IDRG-MH-24078

Builder

  • NameShree Sai Shraddha Associates
  • Entity typeOthers
  • Named personJ Modi Venture Pvt Ltd
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseMar 2018Revised toDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 20 Mar 2018)
  • Buildings1 building record
  • Documents filed57 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Chandraraj ComplexNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Chandraraj Complex: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered1
Open Space3

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area676 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2689.62
Proposed, not sanctioned1,841 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKasturba Road No 1 Borivli East Mumbai - 400066

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerNexus Project Solution Pvt Ltd
PartnerRole in project
Shree Sai Shraddha Associates-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800005737Mar 2018 → Dec 2020

Reason as filed by the promoterConstruction of the building was completed as per the then norms and approval of DCR 1991, but due to some technical difficulties, we were unable to apply for Occupation Certificate. We are now in the process of applying for the Occupation Certificate as per the New DCRP 2034 with required concessions. We have already taken consent of 90 percent tenants/office purchasers/original owners for extension of project up to 31/12/2020.

EXT51800000722Mar 2018 → Dec 2020

Reason as filed by the promoterThe Construction work of Building under reference is already completed, however with minor deviations. We are now advised by the Architect to put up plans of amendments and process the same as per the new D.P./D.C.R 2034, which is likely to be implemented shortly. Enclosed herewith is a copy of the notification showing implementation date of New D.C. regulations, which is 24th October. Hence we were unable to upload the occupation certificate.

EXT51800010342Mar 2018 → Jun 2023

Reason as filed by the promoterDUE TO COVID-19 AND PERMISSION DELAY THE PROJECT WAS NOT ABLE TO GET COMPLETED ON TIME. WE WOULD LIKE TO REQUEST YOU TO FURTHER GRANT US EXTENSION TILL 30th JUNE 2023

EXT51800025875Mar 2018 → Dec 2026

Reason as filed by the promoterChandra Raj Complex was completed by me long back as per the approved plan, I.O.D. & Final C.C. dated 18.10.2013. Before occupation certificate, the building was occupied totally by original members of the society & by the new purchasers. Then niche, dry balcony, flower bed etc. in every floor were covered and merged with floor level and became total usable area. As per the present policy the same can be regularized by counting the same area in to FSI as per present policy, for which huge regularization penalty & premiums are to be paid. We had joint meeting with the occupiers and they have sh

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Declaration in FORM BFile: Form B of chandrarj project on 500 stamp paper_0001.pdf21 Feb 2025
Layout approvalFile: Final Plan-09-12-2022 send by Pratiksha.pdf13 Feb 2025
Copy of Layout Approval (in case of layout)File: Final Plan-09-12-2022 send by Pratiksha.pdf13 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Chandraraj--FULL CC.pdf13 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_0001.pdf13 Feb 2025
Declaration about Commencement CertificateFile: CC declaration.pdf13 Feb 2025
Certificates of CA (Form 3)File: Form 3 signed_0001_0001_0001 (2).pdf8 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 signed_0001.pdf5 Feb 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 signed_0001_0001.pdf5 Feb 2025
Certificates of CA (Form 3)File: Form 3 03 22.pdf30 Dec 2024
Certificates of CA (Form 3)File: Form 3 03 23.pdf30 Dec 2024
Certificates of CA (Form 3)File: Form 3 03 24.pdf30 Dec 2024
Declaration in FORM BFile: Form B.pdf28 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 09 24.pdf28 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 03 23.pdf28 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 03 24.pdf28 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 03 22.pdf28 Dec 2024
CERSAI detailsFile: Cersai Declaration.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 21-22.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.pdf28 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 23-24.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 23-24.pdf28 Dec 2024
Disclosure of sold/ booked inventoryFile: Tenants Details.pdf6 Jul 2021
Declaration about Commencement CertificateFile: Certificate (2).pdf5 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form_5_1819.pdf5 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form_5_1920.pdf5 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A Engineer.pdf1 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A Engineer.pdf1 Jul 2021
Disclosure of sold/ booked inventoryFile: Inventory.pdf30 Jun 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: CA Certificate (3).pdf30 Jun 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf13 Feb 2020
OtherFile: 2 NEOCON NOC .pdf13 Feb 2020
OtherFile: 3 Appointment Letter for Exicutive Eng.pdf13 Feb 2020
Certificates of CA (Form 5)File: Chandraraj CA form 5.pdf6 Jan 2019
Proforma of Allotment letterFile: 5 Allotment letter.pdf30 Jul 2017
Proforma of Allotment letterFile: 5 Sale Agreement.pdf30 Jul 2017
Building plan approvalFile: 11 IOD Plan - 1-Blue Print-Ground Floor.pdf29 Jul 2017
Building plan approvalFile: 11 IOD Plan - 3-Blue Print.pdf29 Jul 2017
Building plan approvalFile: 11 IOD Plan - 2-Blue Print-A-2nd to 5th Floor.pdf29 Jul 2017
Building plan approvalFile: 11 IOD.pdf29 Jul 2017
Layout approvalFile: 4 Layout Letter.pdf29 Jul 2017
PAN CardFile: 1 PAN CARD.pdf29 Jul 2017
Copy of the legal title reportFile: 2 Legal Title Report.pdf29 Jul 2017
Details of encumbrancesFile: 3 Encrumbrance Letter.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: 4 Layout Letter.pdf29 Jul 2017
Building Plan Approval (IOD)File: 11 IOD.pdf29 Jul 2017
Building Plan Approval (IOD)File: 11 IOD Plan - 1-Blue Print-Ground Floor.pdf29 Jul 2017
Building Plan Approval (IOD)File: 11 IOD Plan - 2-Blue Print-A-2nd to 5th Floor.pdf29 Jul 2017
Building Plan Approval (IOD)File: 11 IOD Plan - 3-Blue Print.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 10 FULL CC.pdf29 Jul 2017
Declaration in FORM BFile: 6 Form-B.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 Architect Certificate.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 9 Engineer Certificate.pdf29 Jul 2017
Certificates of CA (Form 3)File: 8 CA Certificate.pdf29 Jul 2017
OtherFile: 12 Notes.pdf29 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 105 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Chandraraj Complex on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Malad West6,700+ in Mumbai Suburban

2 kmChandraraj ComplexCompleted 181Lapsed / revoked 107Other 174Dot size: filed unitsN

Filed coordinates, straight-line distance. 462 registered projects within 2 km.

Builder: Shree Sai Shraddha Associates

Shree Sai Shraddha Associates has 2 registrations on MahaRERA, including Shree Sambhav Darshan CHS and Chandraraj Complex. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Chandraraj Complex is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Chandraraj Complex?

The registered promoter entity is Shree Sai Shraddha Associates, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Chandraraj Complex?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Chandraraj Complex?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Chandraraj Complex?

The professionals named in the filing: Engineer: Nexus Project Solution Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Chandraraj Complex?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Chandraraj Complex. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Chandraraj Complex to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.