Home / Browse projects / Thane, Maharashtra / CHANDRANGAN RESIDENCY PHASE-IV

Registered No litigation declared Residential / Group Housing project

CHANDRANGAN RESIDENCY PHASE-IV

By EKVEERA ENTERPRISES

RG-MH-07362 · RERA P51700056036 · Last updated on MahaRERA portal: 26 Dec 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
7 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 50%
0Complaints at MahaRERAon this registration
Jump to the 53 documents Report an error

CHANDRANGAN RESIDENCY PHASE-IV is a Residential / Group Housing project by EKVEERA ENTERPRISES in Thane, Maharashtra, registered with MahaRERA as P51700056036 on 10 May 2024. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameCHANDRANGAN RESIDENCY PHASE-IV
  • TypeResidential / Group Housing
  • Location
    • DIVA SHIL ROAD DIVA EAST
    • NEAR GP PARSIK BANK
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • RERA no.P51700056036
  • ReraGenie IDRG-MH-07362

Builder

  • NameEKVEERA ENTERPRISES
  • Entity typePartnership
  • PartnersNILKANTHA YADAV BHAGAT, DINESH GANESH BHAGAT, NILESH YADAV BHAGAT, ABHISHEK GANESH BHAGAT
  • Other registrations8 more →
  • Completed1 of 9
  • No longer live4 lapsed, de-registered or revoked

Key dates

this monthRegisteredMay 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed53 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA210000
BUNGALOWNA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 26 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 50%.

BUILDING A42%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises14%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUNGALOW27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities18

As on 26 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
TRANSFORMERYes0%
SOLAR PANEL INSTALLATIONYes0%
D G SET INSTALLATIONYes0%

Parking filed226

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots226
Open Space226

Land and ownership41

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,284 sq m
Land owned byThe promoter, with other names on the file
Named landowners41
LandownerVillageDistrict
SHRIRAM SITARAM PATILThane (M Corp.)Thane
YAMUNA DATTU MHATREThane (M Corp.)Thane
SHOBHANA ASHOK PATILThane (M Corp.)Thane
GUNABAI SITARAM PATILThane (M Corp.)Thane
GULAB ASHOK PATILNavi Mumbai (M Corp.)Thane
VANDANA GANESH PAWARMumbai CityMumbai City
KARUNA RAMDAS PATILTaloje MajkurRaigarh
NAMDEV TUKARAM PATILThane (M Corp.)Thane
SOPAN TUKARAM PATILThane (M Corp.)Thane
NIRUATI TUKARAM PATILThane (M Corp.)Thane
BHOLENATH EKNATH PATILThane (M Corp.)Thane
RAMDAS EKNATH PATILThane (M Corp.)Thane
DINANATH EKNATH PATILThane (M Corp.)Thane
RUPABAI CHINTAMAN PATILneljeThane
RADHABAI KISAN BHAGATKarjatRaigarh
ARUNABAI SOMNATH MHASKARThane (M Corp.)Thane
SUMATI PANDHARINATH PHADKENereRaigarh
MEENA ASHOK PATILAmbarnath (R)Thane
MAYA HARISHCHANDRA DINGOREGotegharThane
SAGAR LAXMAN BHOIRThane (M Corp.)Thane
PREMNATH LAXMAN BHOIRThane (M Corp.)Thane
DILIP LAXMAN BHOIRThane (M Corp.)Thane
JAGDISH LAXMAN BHOIRThane (M Corp.)Thane
SHAKUNTALA GOVARDHAN MHATREThane (M Corp.)Thane
GITA DAMODAR KHONEThane (M Corp.)Thane
MEENA JEEVAN PATILThane (M Corp.)Thane
MANISHA DILIP MHATREBhiwandi (M Corp.)Thane
KAVITA KISHORE KASKARMumbai CityMumbai City
ATMARAM SHIVRAM PATILThane (M Corp.)Thane
BAJRANG SHIVRAM PATILThane (M Corp.)Thane
BRAMHA SHIVRAM PATILThane (M Corp.)Thane
VISHNU SHIVRAM PATILThane (M Corp.)Thane
SANTOSHI PRABHAKAR MHATREKoproliRaigarh
SHAKUNTALA BALARAM MHATREThane (M Corp.)Thane
SHARDA JANARDHAN MHATREneljeThane
MANDA DINESH VAIKHAREThane (M Corp.)Thane
ARCHANA GIRISH MHATREThane (M Corp.)Thane
SUMITRA ANANT KALANThane (M Corp.)Thane
NITESH KASHINATH PORJIThane (M Corp.)Thane
RUPESH KASHINATH PORJIThane (M Corp.)Thane
TEJAS KASHINATH PORJIThane (M Corp.)Thane

Approvals and building plan

Permissible FSI2195.58
Proposed, not sanctioned2,196 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR SHREE KRISHNA PARK DIVA SHIL ROAD DIVA EAST THANE 400612

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJOSHI DESHAWARE & ASSOCIATES
EngineerAJAY MAHALE & ASSOCIATES
Chartered AccountantHEMANT SHETTY & CO
Chartered AccountantSHETTY & SHETTY
PartnerRole in project
EKVEERA ENTERPRISES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed53

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Q2.pdf26 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Q2.pdf26 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE PHASE - IV Q1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFIATE Q 1 PHASE - IV.pdf20 Jul 2024
Layout approvalFile: sanction plan chandraghan phase 4.pdf15 May 2024
Copy of Layout Approval (in case of layout)File: sanction plan chandraghan phase 4.pdf15 May 2024
Commencement Certificates / NA Order for plotted developmentFile: Chandraghan phase 4 cc.pdf15 May 2024
Other - TechnicalFile: Annexure A Phase 4.pdf6 May 2024
Details of encumbrances concerned to FinanceFile: 1_Legal and Finance Encumbrance.pdf20 Apr 2024
Details of encumbrances concerned to LegalFile: 1_Legal and Finance Encumbrance.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 4 CA certificate 19-04-2024.pdf20 Apr 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation in Agreement for sale.pdf20 Apr 2024
CERSAI detailsFile: 2_ Cersai Report.pdf10 Apr 2024
CERSAI detailsFile: 2_ Cersai Report Decl.pdf10 Apr 2024
Proforma of Agreement for saleFile: PHASE 4 AGREEMENT FOR SALE (FINAL).pdf5 Apr 2024
Other - LegalFile: POA Survey No 67-2 4.pdf5 Apr 2024
Other - LegalFile: POA Survey No 67-2 5.pdf5 Apr 2024
Other - LegalFile: POA Survey No 67-2 6.pdf5 Apr 2024
Other - LegalFile: POA Survey No 67-2 7.pdf5 Apr 2024
Other - LegalFile: POA Survey No- 67 4_1.pdf5 Apr 2024
Other - LegalFile: POA Survey No- 67 4_2.pdf5 Apr 2024
Other - LegalFile: POA Survey No- 67 4_3.pdf5 Apr 2024
Other - LegalFile: POA Survey No 67-2 1.pdf1 Apr 2024
Other - LegalFile: POA Survey No 67-2 2.pdf1 Apr 2024
Other - LegalFile: POA Survey No 67-2 3.pdf1 Apr 2024
Proforma of Allotment letterFile: 7_ ALLOTMENT LETTER.pdf15 Mar 2024
Deviation Report with respect to Allotment letterFile: Model form of allotment.pdf15 Mar 2024
Other - LegalFile: 11_EKVEERA DEED PHASE 1 TO 5_Compressd.pdf15 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annex A Abhijit Alimkar.pdf12 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annx A abhishek bhagat.pdf12 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annx A Anil G Bhagat.pdf12 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annx A Dinesh Bhagat.pdf12 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annx A Nilesh bhagat.pdf12 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annx A Nilesh Warekar.pdf12 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annx A Nilkanth Bhagat.pdf12 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annx A Sumit Bhoir.pdf12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf2 Feb 2024
Layout approvalFile: 5 Plan.pdf9 Jan 2024
Building plan approvalFile: 6 Plan.pdf9 Jan 2024
PAN CardFile: 1_Pan Card of Organization.pdf9 Jan 2024
Copy of the legal title reportFile: Title Certificate S No 67-2.pdf9 Jan 2024
Copy of the legal title reportFile: Title_to_Diva_67_4_(Rera) Final.pdf9 Jan 2024
Details of encumbrances concerned to FinanceFile: Declaration legal and finance.pdf9 Jan 2024
Details of encumbrances concerned to LegalFile: Declaration legal and finance.pdf9 Jan 2024
Copy of Layout Approval (in case of layout)File: 5 Plan.pdf9 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 6 Plan.pdf9 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 7_CC_12-07-2023 (2).pdf9 Jan 2024
Declaration about Commencement CertificateFile: 8 Declaration C C Format D.pdf9 Jan 2024
Declaration in FORM BFile: 9 Declaration Form B_Promoter_compressed.pdf9 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Anex A Siddhant Bhoir.pdf9 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Sepearate Bank Detail.pdf9 Jan 2024
Other - TechnicalFile: 37 NAREDCO Certificate.pdf9 Jan 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHANDRANGAN RESIDENCY PHASE-IV on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR GP PARSIK BANK7,600+ in Thane

Builder: EKVEERA ENTERPRISES

EKVEERA ENTERPRISES has 9 registrations on MahaRERA, including CHANDRANGAN RESIDENCY TYPE- A and CHANDRANGAN RESIDENCY TYPE - B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if CHANDRANGAN RESIDENCY PHASE-IV is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHANDRANGAN RESIDENCY PHASE-IV?

The registered promoter entity is EKVEERA ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHANDRANGAN RESIDENCY PHASE-IV?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHANDRANGAN RESIDENCY PHASE-IV?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHANDRANGAN RESIDENCY PHASE-IV?

The professionals named in the filing: Architect: JOSHI DESHAWARE & ASSOCIATES; Engineer: AJAY MAHALE & ASSOCIATES; Chartered Accountant: HEMANT SHETTY & CO; Chartered Accountant: SHETTY & SHETTY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHANDRANGAN RESIDENCY PHASE-IV?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHANDRANGAN RESIDENCY PHASE-IV. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHANDRANGAN RESIDENCY PHASE-IV to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.