Registered No litigation declared Residential / Group Housing project

Chafekar Heights

By CHAFEKAR GROUP

RG-MH-31461 · RERA P99000079796 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
5 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 77%
44 of 69Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 51 documents Report an error

Chafekar Heights is a Residential / Group Housing project by CHAFEKAR GROUP in Palghar, Maharashtra, registered with MahaRERA as P99000079796 on 26 Mar 2025. Possession is promised by 31 Dec 2029. 25 of the 69 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete.

At a glance

Project

  • NameChafekar Heights
  • TypeResidential / Group Housing
  • Location
    • Papdy Road
    • Vasai West
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401207
  • Pincode401207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000079796
  • ReraGenie IDRG-MH-31461

Builder

  • NameCHAFEKAR GROUP
  • Entity typePartnership

Key dates

this monthRegisteredMar 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Mar 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed51 files

Current status

36%25 of 69 units booked
39.7%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Chafekar Heights ANA100361046
Chafekar Heights BNA8721223

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 77%.

Chafekar Heights A44%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure77%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
Chafekar Heights B50%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor50%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes20%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed92

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots92
Closed/Covered30
Open Space62
BuildingClosed/CoveredOpen SpaceTotal
Chafekar Heights A163955
Chafekar Heights B142337

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,174 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on5 Nov 2025

Approvals and building plan

Sanctioning authorityVasai Virar City Municipal Corporation
Permissible FSI4224.31
Proposed, not sanctioned4,124 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO. 12 TO 15, GALA NO. G-1/B, RICHMOND TOWN, PHASE-2, BUILDING NO. 4, BHABOLA, TAL. VASAI, DIST. PALGHAR 401 202
Estimated costRs 12.75 cr
Cost incurredRs 5.06 cr
Work done39.71%
BuildingWingEstimatedIncurred
Chafekar Heights ANARs 8.70 crRs 3.91 cr
Chafekar Heights BNARs 2.55 crRs 1.15 cr
-NARs 1.50 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDipesh Vanmali & Associates
EngineerGR Consultants
EngineerSiddhesh Gawde
Chartered AccountantMikhil Jain & Co
Chartered AccountantDishant Jain
Chartered AccountantLalit Jain
PartnerRole in project
CHAFEKAR GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Feb 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed51

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 FY 2025-26.pdf11 May 2026
Withdrawal Update Form 1File: Form 1 Jan to March 2026.pdf7 May 2026
Withdrawal Update Form 2File: Form 2 Jan to March 2026.pdf7 May 2026
Withdrawal Update Form 3File: Form 3 Jan to March 2026_compressed.pdf7 May 2026
Form 2A (FY 2024-2025)File: Form 2A FY 24-25.pdf24 Apr 2026
Form 2A (FY 2025-2026)File: Form 2A FY 25-26.pdf24 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf5 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf5 Feb 2026
Withdrawal Update Form 1File: Form_1_Architect.pdf5 Nov 2025
Withdrawal Update Form 2File: Form_2_StructuralEngineer.pdf5 Nov 2025
Withdrawal Update Form 3File: Form_3_CA.pdf5 Nov 2025
Form 5 (FY 2024-2025)File: Form_5.pdf15 Aug 2025
Withdrawal Update Form 1File: Form_1.pdf6 Aug 2025
Withdrawal Update Form 1File: Form_1.pdf6 Aug 2025
Withdrawal Update Form 2File: Form_2.pdf6 Aug 2025
Withdrawal Update Form 2File: Form_2.pdf6 Aug 2025
Withdrawal Update Form 3File: Form_3.pdf6 Aug 2025
Withdrawal Update Form 3File: Form_3.pdf6 Aug 2025
Form 1File: Form 1 Architect Certificate.pdf6 Jun 2025
Form 2File: Form 2 Structural Engineer's Cert.pdf6 Jun 2025
Form 3File: Form 3 CA Cert.pdf6 Jun 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD AND BOOKED INVETORY.pdf6 Jun 2025
Self-declaration of Quarterly ProgressFile: SELF DECLARATION FOR QUARTERLY PROGRESS.pdf6 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert_new.pdf8 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Structural Engineer's Cert.pdf8 May 2025
Other - TechnicalFile: Declaration Cum Undertaking Annexure A.pdf22 Feb 2025
Copy of the legal title reportFile: Title Report.pdf10 Feb 2025
Proforma of Allotment letterFile: Chafekar Heights Allotment Letter 25_02_2025.pdf10 Feb 2025
Declaration in FORM BFile: Form B.pdf10 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Feb 2025
Declaration about Commencement CertificateFile: Declaration about CC.pdf10 Feb 2025
CERSAI detailsFile: Undertaking for not register on CERSAI.pdf10 Feb 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about RERA Bank Account .pdf10 Feb 2025
Deviation Report with respect to Allotment letterFile: Deviation Report - Allotment Letter.pdf10 Feb 2025
Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement for Sale.pdf10 Feb 2025
Proforma of Agreement for saleFile: Agreement_for_sale_Chafekar_Heights_12_03_2025.pdf10 Feb 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int in other Real Estate Org Annexure A.pdf10 Feb 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format_B_Bank Declaration.pdf10 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: Declaration for seured unsecured finance availed for the project.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Form 1.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2.pdf7 Feb 2025
Layout approvalFile: Commencement Layout Plan.pdf28 Jan 2025
Building plan approvalFile: A and B wing Plans.pdf28 Jan 2025
PAN CardFile: Chafekar Group PAN card.pdf28 Jan 2025
Details of encumbrances concerned to FinanceFile: Declaration for Legal - Financial Encumbrance.pdf28 Jan 2025
Copy of Layout Approval (in case of layout)File: Commencement Layout Plan.pdf28 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf28 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: A and B wing Plans.pdf28 Jan 2025
Details of encumbrances concerned to LegalFile: Declaration for Legal - Financial Encumbrance.pdf28 Jan 2025

How this compares with Palghar

36%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Chafekar Heights on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai West3,200+ in Palghar

2 kmChafekar HeightsCompleted 36Lapsed / revoked 15Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 86 registered projects within 2 km.

Builder: CHAFEKAR GROUP

CHAFEKAR GROUP has 1 registration on MahaRERA, including Chafekar Heights. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Chafekar Heights is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Chafekar Heights?

The registered promoter entity is CHAFEKAR GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Chafekar Heights?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Chafekar Heights?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Chafekar Heights?

The professionals named in the filing: Architect: Dipesh Vanmali & Associates; Engineer: GR Consultants; Engineer: Siddhesh Gawde; Chartered Accountant: Mikhil Jain & Co; Chartered Accountant: Dishant Jain; Chartered Accountant: Lalit Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Chafekar Heights?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Chafekar Heights. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Chafekar Heights to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.