Registered Litigation declared Residential / Group Housing project

CENTRICO

By CRESCENT AMITY REALTORS PVT.LTD

RG-MH-24069 · RERA P51800008480 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • 12 complaints at MahaRERA
  • Completion date moved by 36 months
  • 3 extensions taken

Clear

  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 36 months from the original
14 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 94%
24 of 166Units unsoldnot recorded sold or booked
12Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

CENTRICO is a Residential / Group Housing project by CRESCENT AMITY REALTORS PVT.LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800008480 on 19 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 36 months from the original filing. 142 of the 166 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete. 12 complaints are on record with the regulator.

At a glance

Project

  • NameCENTRICO
  • TypeResidential / Group Housing
  • Location
    • GAUTAM BUDDHA MARG
    • ORLEM MALAD WEST
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800008480
  • ReraGenie IDRG-MH-24069

Builder

  • NameCRESCENT AMITY REALTORS PVT.LTD
  • Entity typeCompany
  • Managing DirectorJIGAR SHAILESH VORA

Key dates

this monthRegisteredAug 2017First promiseDec 2023Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2023)
  • Buildings2 building records
  • Documents filed109 files

Current status

86%142 of 166 units booked
92.4%Work done, per cost certificate

Figures as on 23 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CENTRICO SALE BUILDINGNA49411660166
COMPOSITE BUILDINGNA2626000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 94%.

CENTRICO SALE BUILDING75%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)90%
Plinth100%
Stilt Floor100%
Slabs of Super Structure94%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
COMPOSITE BUILDING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes40%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed155

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots155
Closed/Covered155
BuildingClosed/CoveredTotal
CENTRICO SALE BUILDING138138
COMPOSITE BUILDING1717

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,432 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authoritySLUM REHABILATION AUTHORITY
Permissible FSI26456.22
Proposed, not sanctioned17,656 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround FloorMarathe Udyog Bhavan Next to SKODA Showroom, Appasaheb Marathe Marg Prabhadevi, Mumbai
Estimated costRs 208.12 cr
Cost incurredRs 192.30 cr
Work done92.4%
BuildingWingEstimatedIncurred
-NARs 104.06 crRs 96.15 cr
CENTRICO SALE BUILDINGNARs 81.06 crRs 73.15 cr
COMPOSITE BUILDINGNARs 23.00 crRs 23.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVISHWAS SATODIA
EngineerGOKANI CONSULTANTS PVT LTD
EngineerMAHESH TANAJI GODAMBE
Chartered AccountantDILIP S KAPADIA
PartnerRole in project
CRESCENT AMITY REALTORS PVT.LTD-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017737Dec 2023 → Dec 2024

Reason as filed by the promoter1) Delay in fund release from financial institutions who have funded the project 2) Slow collections from buyers 3) Delay in work due to slow fund release of customer collections by financial institution which has control over the collection account 4) Approval delays 5). Repeated stoppages due to the above had a impact on the overall delivery cycle of the project.

EXT51800025369Dec 2023 → Dec 2025

Reason as filed by the promoterDue to delay in obtaining amended plan approvals from SRA, the project got delayed and hence we are applying for extension to Maharera. The construction work is substantially completed and only few finishing items are pending which will be completed as soon as possible. The project is on the verge of completion and will be finished within extended timelines proposed by us.

EA11122518601Dec 2023 → Dec 2026

Reason as filed by the promoter1. Brief Summary of Major work which is completed is as follows :- (i) RCC work and major finishing work is completed as per Approved Plans. (ii) Three Lifts of the said Building are installed and operational. (iii) Electrical work is completed and meters are installed. (iv) STP work is completed (v) O.H tank, U.G.tank and plumbing work including work of installation of water pipes is completed. 2. Now, extension is sought for completion of following pending work:- (i) Fire Fighting Work (ii) Parking work 3. The pending work is expected to be completed in next 3 months. Thereafter application

Litigation declared4

CaseCourtStatus
2479/2014CITY CIVIL COURT DINDOSHIClosed
10/2014MAHARASHTRA SLUM TRIBUNALClosed
3165/2015CITY CIVIL COURT DINDOSHIOngoing
11/2019MAHARASHTRA SLUM TRIBUNALOngoing

Complaints filed with MahaRERA12

Case no.ComplainantRespondentFiled
CC006000000209434Crescent Amity Realtors Pvt. Ltd.Hemant Jayprakash Bhavsar16/12/2021
CC006000000199013Hemant BhavsarCrecent Amity Pvt Ltd30/11/2021
CC006000000221079KIRTI G. SANGHVIM/S. CRESCENT AMITY REALTORS PVT. LTD.05/05/2022
CC12500091CAROL PRIYESHKAR KUMARCRESCENT AMITY REALTORS PVT.LTD09/01/2025
CC12501588Clyde RebelloCRESCENT AMITY REALTORS PVT.LTD14/05/2025
CC12501590Clyde RebelloCRESCENT AMITY REALTORS PVT.LTD14/05/2025
CC12600075VISHAL KANAHAIYALAL RAWALCRESCENT AMITY REALTORS PVT.LTD05/01/2026
CC12600831Mrs Candice Waltrude GomesCRESCENT AMITY REALTORS PVT.LTD14/02/2026
CC12600832Mrs Candice Waltrude GomesCRESCENT AMITY REALTORS PVT.LTD14/02/2026
CC12602971Mark Thomas MirandaCRESCENT AMITY REALTORS PVT.LTD20/05/2026
CC12603051CRESCENT AMITY REALTORS PVT.LTDHitesh Dharamshi Savla (Allottee)23/05/2026
CC12605125Elton Bruno DSouzaCRESCENT AMITY REALTORS PVT.LTD11/08/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form - 1 crescent 31-3-26.pdf23 May 2026
Withdrawal Update Form 2File: form-2 crescent 31-3-26.pdf23 May 2026
Withdrawal Update Form 3File: form-3 crescent 31-3-26.pdf23 May 2026
Withdrawal Update Form 1File: form - 1 - 31-12-25.pdf16 Feb 2026
Withdrawal Update Form 2File: form-2 31-12-25.pdf16 Feb 2026
Withdrawal Update Form 3File: form-3 - 31-12-25.pdf16 Feb 2026
Building plan approvalFile: Scan-1084 copy1.pdf31 Dec 2025
Building plan approvalFile: Scan-1085 copy1.pdf31 Dec 2025
Building plan approvalFile: Scan-1086 copy1.pdf31 Dec 2025
Building plan approvalFile: Scan-1087 copy1.pdf31 Dec 2025
Building plan approvalFile: Scan-1089 copy1.pdf31 Dec 2025
Withdrawal Update Form 1File: Form 1 Crescent.pdf10 Dec 2025
Withdrawal Update Form 1File: Form 1 Crescent.pdf10 Dec 2025
Withdrawal Update Form 2File: form-2 30-9-25.pdf10 Dec 2025
Withdrawal Update Form 2File: form-2 30-9-25.pdf10 Dec 2025
Withdrawal Update Form 3File: FORM -3 CRESCENT.pdf10 Dec 2025
Withdrawal Update Form 3File: FORM-3 CENTRICO 30-6-25.pdf10 Dec 2025
Withdrawal Update Form 1File: Form 1 Crescent.pdf9 Dec 2025
Withdrawal Update Form 1File: Form 1 Crescent.pdf9 Dec 2025
Withdrawal Update Form 2File: form-2 30-9-25.pdf9 Dec 2025
Withdrawal Update Form 2File: form-2 30-9-25.pdf9 Dec 2025
Withdrawal Update Form 3File: FORM -3 CRESCENT.pdf9 Dec 2025
Withdrawal Update Form 3File: FORM -3 CRESCENT.pdf9 Dec 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CENTRICO 31-3-25.pdf2 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-1 CENTRICO AS ON 31-3-25.pdf21 Apr 2025
Certificates of CA (Form 3)File: crescent rera certificate 31-3-25.pdf16 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: crescent eng certificate 31-3-25.pdf16 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: orlem sale.pdf3 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: orlem rehab.pdf3 Feb 2025
Declaration in FORM BFile: Crescent Form B.pdf11 Dec 2024
Certificates of CA (Form 3)File: form-3.pdf11 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf11 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a as on 31-3-24.pdf11 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2a as on 30-9-24.pdf11 Dec 2024
Disclosure of sold/ booked inventoryFile: RERA Inventory List.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: RERA LIST.pdf2 Dec 2024
Disclosure of sold/ booked inventoryFile: RERA LIST.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: crpl_0001.pdf25 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form-1 rehab.pdf4 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form-1 sale.pdf4 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 from CA STATUTORY AUDITOR(31-3-2024).pdf4 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form -2.pdf18 Oct 2023
Certificates of CA (Form 3)File: form-3.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form -5.pdf18 Oct 2023
Declaration about Commencement CertificateFile: Form D -Crescent.pdf14 Oct 2023
Disclosure of sold/ booked inventoryFile: DISCLOSER DOCUMENT.pdf14 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASsURANCE.pdf12 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Certificate March-23.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 from CA STATUTORY AUDITOR(31-3-2023).pdf12 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE FOR MAR-23 SALE.pdf29 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ARCHITECT CERTIFICATE FOR MAR-23 REHAB.pdf29 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Certificate March-23.pdf29 Apr 2023
Disclosure of sold/ booked inventoryFile: discloser of flat- centrico_0001.pdf29 Apr 2023
CERSAI detailsFile: CARSAI.pdf8 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form-1 rehab crescent.PDF3 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form-1 sales crescent.PDF3 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 from CA STATUTORY AUDITOR(31-3-2019) (1).pdf30 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 from CA STATUTORY AUDITOR(31-3-2020) (1).pdf30 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 from CA STATUTORY AUDITOR(31-3-2022) Crescent.pdf30 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: CC-SB-1.pdf2 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: QUALITY ASsURANCE sep 22.pdf2 Jan 2023
Certificates of CA (Form 3)File: C A CERTIFICATE FORM 3.pdf22 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect-1.pdf26 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RB-2 (123).pdf26 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineers certificate 123.pdf26 May 2022
Certificates of CA (Form 3)File: FORM 3 31-03-2022.pdf26 May 2022
Commencement Certificates / NA Order for plotted developmentFile: CC FOR REHAB BLDG 2.pdf4 Apr 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 from CA STATUTORY AUDITOR(31-3-2021).pdf29 Sep 2021
Building plan approvalFile: IOD.pdf23 Sep 2021
Building plan approvalFile: 1.pdf23 Sep 2021
Building plan approvalFile: 2.pdf23 Sep 2021
Building plan approvalFile: 3.pdf23 Sep 2021
Building Plan Approval (IOD)File: IOD.pdf23 Sep 2021
Building Plan Approval (IOD)File: 1.pdf23 Sep 2021
Building Plan Approval (IOD)File: 2.pdf23 Sep 2021
Building Plan Approval (IOD)File: 3.pdf23 Sep 2021
Disclosure of sold/ booked inventoryFile: disclosure of sold flat centrico 1.pdf24 Aug 2021
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf25 Jul 2020
Certificates of CA (Form 5)File: CENTRICO -FORM 5.pdf22 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arc-certificate(1).pdf30 May 2019

How this compares with Mumbai Suburban

86%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 36 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CENTRICO on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ORLEM MALAD WEST6,700+ in Mumbai Suburban

2 kmCENTRICOCompleted 145Lapsed / revoked 98Other 145Dot size: filed unitsN

Filed coordinates, straight-line distance. 388 registered projects within 2 km.

Builder: CRESCENT AMITY REALTORS PVT.LTD

CRESCENT AMITY REALTORS PVT.LTD has 1 registration on MahaRERA, including CENTRICO. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if CENTRICO is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CENTRICO?

The registered promoter entity is CRESCENT AMITY REALTORS PVT.LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CENTRICO?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CENTRICO?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for CENTRICO?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CENTRICO?

The professionals named in the filing: Architect: VISHWAS SATODIA; Engineer: GOKANI CONSULTANTS PVT LTD; Engineer: MAHESH TANAJI GODAMBE; Chartered Accountant: DILIP S KAPADIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CENTRICO?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CENTRICO. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CENTRICO to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.