Registered Litigation declared Residential / Group Housing project

Central Park

By H. M. Holdings

RG-MH-06313 · RERA P51900053390 · Last updated on MahaRERA portal: 23 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jul 2028Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Podiums (if any), 95%
38 of 42Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 197 documents Report an error

Central Park is a Residential / Group Housing project by H. M. Holdings in Mumbai City, Maharashtra, registered with MahaRERA as P51900053390 on 27 Oct 2023. Possession is promised by 30 Jul 2028. 4 of the 42 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameCentral Park
  • TypeResidential / Group Housing
  • Location
    • Tejpal Road
    • Gamdevi
    • Mumbai
    • Mumbai City
    • 400007
  • Pincode400007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900053390
  • ReraGenie IDRG-MH-06313

Builder

  • NameH. M. Holdings
  • Entity typePartnership
  • PartnersJaydev Mukund Mody, Aarti Pratap Pandit
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2023PromisedJul 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Oct 2023
  • Promised completion30 Jul 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed197 files

Current status

10%4 of 42 units booked
23.9%Work done, per cost certificate

Figures as on 23 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Atlantis OneNA382242042

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 95%.

Atlantis One: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)95%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises52%
Sanitary Fittings within the flats / premises4%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks33%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%

Progress on shared amenities15

As on 23 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes30%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes25%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed84

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots84
Closed/Covered84

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,615 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Oct 2025
LandownerVillageDistrict
Anjali J Mody Trust through its TrusteeMumbai CityMumbai City
Aarti J Mody Trust through its TrusteeMumbai CityMumbai City
Aditi J Mody Trust through its TrusteeMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI7570.97
Proposed, not sanctioned7,571 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRBL Bank Ltd Dhannur Ground Floor 15 Sir P M Road Fort Mumbai 400001
Estimated costRs 123.54 cr
Cost incurredRs 29.49 cr
Work done23.87%
BuildingWingEstimatedIncurred
Atlantis OneNARs 117.36 crRs 29.49 cr
-NARs 6.18 cr-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDSP Design Associates Pvt. Ltd.
EngineerJW Consultants LLP
EngineerDarshan Mahadeo Tawade
Chartered AccountantCA Paresh Sabadra
Chartered AccountantRSPH and Associates
Chartered AccountantP N Sabadra and Associates
PartnerRole in project
H. M. Holdings-

Litigation declared2

CaseCourtStatus
948/2010High Court BombayAdmitted
948/2010High Court BombayOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600055Bhakti AchrekarH. M. Holdings11/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Sep 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jul 2028

Documents filed197

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 197 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: CP - 1 ArchitectsCertificate dt 14-04-2026 .pdf23 Apr 2026
Withdrawal Update Form 2File: CP - 1 Engineers Certificate dt 14-04-2026.pdf23 Apr 2026
Withdrawal Update Form 3File: Atlantis one-CA Cert march 26.pdf23 Apr 2026
Withdrawal Update Form 1File: Architects Certificate Dec 25.pdf22 Jan 2026
Withdrawal Update Form 2File: Engineers Certificate RERA Dec 25.pdf22 Jan 2026
Withdrawal Update Form 3File: Atlantis one-CA Cert_Dec 25.pdf22 Jan 2026
Form 1File: Architects Certificate March 25.pdf10 Jan 2026
Form 2File: Engineers Certificate March 25.pdf10 Jan 2026
Form 3File: CA Certificate final.pdf10 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Unit-CP-2.pdf10 Jan 2026
Form 2A (FY 2024-2025)File: Form 2A- March 2025.PDF9 Jan 2026
Form 5 (FY 2024-2025)File: RERA Audit 24-25- Atlantis One Project final.pdf1 Dec 2025
Form 1File: AR Sept 25.pdf15 Oct 2025
Form 2File: ENGINEER’S CERTIFICATE Sept 25.pdf15 Oct 2025
Form 3File: CA Cert_Sept 25 final.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY Sept 25.pdf15 Oct 2025
Form 1File: Architect certificate.pdf24 Jul 2025
Form 2File: Engineers Certificate dt 17-07-2025.pdf24 Jul 2025
Form 3File: CA Certificate Signed.pdf24 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold inventory.pdf24 Jul 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Unit-CP-2.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate March 25.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate final.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate March 25.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aarti Trust _Architect.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aditi Trust _Architect.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anjali Trust _Architect.pdf21 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Anjali Trust _Architect.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aditi Trust -Signed by Mgmt-min.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aarti Trust-Signed by Mgmt-min.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Anjali Trust- Signed by Mgmt-min.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aarti Trust _Engineer.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aditi Trust _Engineer.pdf21 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Anjali Trust _Engineer.pdf21 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Aarti Annual Report 23-24.pdf21 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Aditi Annual Report 23-24.pdf21 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Final Anjali Annual Report 23-24.pdf21 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Atlantis one-CA Cert_Dec 24.pdf10 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate Dec 24.pdf21 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure od sold-booked inventory Dec 24.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Atlantis one-CA Cert_Dec 24-Signed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Atlantis One Dec 2024.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Atlantis one-CA Cert_17 12 2024_Final Signed.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certifiacte.pdf3 Jan 2025
Layout approvalFile: Final Plan 1.pdf28 Nov 2024
Building plan approvalFile: Final Plan.pdf28 Nov 2024
Building plan approvalFile: Final Plan 1.pdf28 Nov 2024
Building plan approvalFile: Final Plan 2.pdf28 Nov 2024
Building plan approvalFile: Final Plan 3.pdf28 Nov 2024
Building plan approvalFile: Final Plan 4.pdf28 Nov 2024
Building plan approvalFile: Final Plan 5.pdf28 Nov 2024
Building plan approvalFile: Final Plan 6.pdf28 Nov 2024
Building plan approvalFile: Final Plan 7.pdf28 Nov 2024
Building plan approvalFile: Final Plan 8.pdf28 Nov 2024
Building plan approvalFile: Final Plan 9.pdf28 Nov 2024
Building plan approvalFile: Final Plan 10.pdf28 Nov 2024
Building plan approvalFile: Final Plan 11.pdf28 Nov 2024
Building plan approvalFile: Final Plan 12.pdf28 Nov 2024
Building plan approvalFile: Final Plan 13.pdf28 Nov 2024
Building plan approvalFile: Final Plan 14.pdf28 Nov 2024
Building plan approvalFile: Final Plan 15.pdf28 Nov 2024
Building plan approvalFile: Final Plan 16.pdf28 Nov 2024
Building plan approvalFile: Final Plan 17.pdf28 Nov 2024
Building plan approvalFile: Final Plan 18.pdf28 Nov 2024
Building plan approvalFile: Final Plan 19.pdf28 Nov 2024
Building plan approvalFile: Final Plan 20.pdf28 Nov 2024
Building plan approvalFile: Final Plan 21.pdf28 Nov 2024
Copy of Layout Approval (in case of layout)File: Final Plan 1.pdf28 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Final Plan 4.pdf28 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Final Plan.pdf28 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Final Plan 5.pdf28 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Final Plan 6.pdf28 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Final Plan 7.pdf28 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Final Plan 8.pdf28 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Final Plan 9.pdf28 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Final Plan 10.pdf28 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Final Plan 11.pdf28 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Final Plan 12.pdf28 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Final Plan 13.pdf28 Nov 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Central ParkP51900046748D Ward, Mumbai, Mumbai CitySep 2022CompletedJul 2026May 2024

How this compares with Mumbai City

10%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Central Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Gamdevi, Mumbai780+ in Mumbai City

2 kmCentral ParkCompleted 12Lapsed / revoked 14Other 42Dot size: filed unitsN

Filed coordinates, straight-line distance. 68 registered projects within 2 km.

Builder: H. M. Holdings

H. M. Holdings has 2 registrations on MahaRERA, including Central Park and Central Park. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Central Park is delayed beyond 30 Jul 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Central Park?

The registered promoter entity is H. M. Holdings, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Central Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Central Park?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Central Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Central Park?

The professionals named in the filing: Architect: DSP Design Associates Pvt. Ltd.; Engineer: JW Consultants LLP; Engineer: Darshan Mahadeo Tawade; Chartered Accountant: CA Paresh Sabadra; Chartered Accountant: RSPH and Associates; Chartered Accountant: P N Sabadra and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Central Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Central Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Central Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.