Home / Browse projects / Mumbai City, Maharashtra / Central Park

Completed No litigation declared Residential / Group Housing project

Central Park

By H. M. Holdings

RG-MH-46023 · RERA P51900046748 · Last updated on MahaRERA portal: 24 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jul 2026Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Podiums (if any), 97%
0Complaints at MahaRERAon this registration
Jump to the 137 documents Report an error

Central Park is a Residential / Group Housing project by H. M. Holdings in Mumbai City, Maharashtra, registered with MahaRERA as P51900046748 on 5 Sep 2022. The registration is recorded completed; possession was promised by 1 Jul 2026.

At a glance

Project

  • NameCentral Park
  • TypeResidential / Group Housing
  • Location
    • N. S. Patkar Marg
    • D Ward
    • Mumbai
    • Mumbai City
    • 400007
  • Pincode400007
  • RERA no.P51900046748
  • ReraGenie IDRG-MH-46023

Builder

  • NameH. M. Holdings
  • Entity typePartnership
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredSep 2022PromisedJul 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Sep 2022
  • Promised completion1 Jul 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed137 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Central Park - Building 1NA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 97%.

Central Park - Building 1: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)97%
Plinth100%
Stilt Floor97%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises55%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%

Progress on shared amenities18

As on 24 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes60%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes40%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes60%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes25%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes65%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
GymnasiumYes50%
Open Terrace LawnYes0%
Swimming PoolYes50%

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered14

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,618 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
N. H. Kotak HUFMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI7857.41
Proposed, not sanctioned7,857 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR, JAYABHADRA VILLA S V P ROAD BORIVALI W MUMBAI MAHARASHTRA 400092

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDSP Design Associates Pvt Ltd
EngineerJW Consultants LLP
Chartered AccountantCA Paresh Prakash Sabadra
PartnerRole in project
H. M. Holdings-

Litigation declared2

CaseCourtStatus
1730/2009The Bombay High CourtAdmitted
947/2010The Bombay High CourtAdmitted

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 May 2024

Documents filed137

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 137 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 cp 1.pdf24 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: H M Holdings RA Signed copy.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: H M Holdings RA Signed copy.pdf19 Nov 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC BUILDING NO 1.pdf11 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: CP-1-Architect Certificate -Form 4.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate Central Park Final signed copy.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: H M Holding-CA Cert_03 24_Signed.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf15 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Booked Disclosure.pdf15 Apr 2024
Other - TechnicalFile: Form 2A Central Park March 2024.pdf15 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Structural Engineer Certificate.pdf11 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-Dec-23.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Central Park-CA Cert-12 23.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Update Jan 2023 DSP Letter Central Park.pdf4 Jan 2024
Disclosure of sold/ booked inventoryFile: RERA Update Jan 2023 Sold Investory Central Park.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificates.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Sept 23.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: H M Holding-CA Cert-09 23.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01.pdf3 Oct 2023
Disclosure of sold/ booked inventoryFile: DIsclosure of Sold Booked Inventory September 2023.pdf3 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Audit FY 2022-23.pdf27 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Central Park Engineer Letter.pdf21 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: H M Holding-CA Certificate-06 23.pdf20 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form No-1 Architect Certificate _20230701.pdf4 Jul 2023
Disclosure of sold/ booked inventoryFile: HM Holdings Central Park June Quarter 2023 update.pdf4 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: H M Holding CA Certificate_March 23.pdf16 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf4 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold or booked inventory till march 31 2023.pdf4 Apr 2023
Other - TechnicalFile: Structural Engineer Certificate.pdf4 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: H M Holding Certificate_Signed.pdf30 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf6 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold inventory HM Holdings.pdf5 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate Bank Account HM Holdings.pdf5 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_signed_09 22.pdf10 Nov 2022
Disclosure of sold/ booked inventoryFile: HM Holdings - Central Park - Units detail.pdf19 Oct 2022
Details of encumbrances concerned to LegalFile: 1 b Details of encumbrances concerned to Legal.pdf2 Sep 2022
Details of encumbrances concerned to FinanceFile: Financial Encumbrance.pdf1 Sep 2022
Proforma of Allotment letterFile: CP-1-Agreement for Sale.pdf1 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation for AFS.pdf1 Sep 2022
Proforma of Allotment letterFile: Allotment Letter Final.pdf24 Aug 2022
Deviation Report with respect to Allotment letterFile: Deviation of Allotment Letter-Revised 230822.pdf23 Aug 2022
CERSAI detailsFile: CERSAI Search Report 17 08 2022.pdf18 Aug 2022
Details of encumbrances concerned to FinanceFile: Financial Encumbrances.pdf12 Aug 2022
Details of encumbrances concerned to LegalFile: Encumbrances-Legal.pdf12 Aug 2022
Other - LegalFile: Clarification Letter.pdf12 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: H M Holings-CA Certificate.pdf21 Jul 2022
Layout approvalFile: Amended Plan Approval Letter.pdf20 Jul 2022
Layout approvalFile: 1 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 2 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 3 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 4 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 5 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 6 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 7 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 8 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 9 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 10 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 11 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 12 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 13 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 14 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 15 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 16 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 17 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 18 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Layout approvalFile: 19 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 2 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 3 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 4 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 5 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 6 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 7 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 8 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 9 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 10 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 11 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 12 Copy of Layout Approval (in case of layout).pdf20 Jul 2022
Building plan approvalFile: 13 Copy of Layout Approval (in case of layout).pdf20 Jul 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Central ParkP51900053390Gamdevi, Mumbai, Mumbai City42Oct 2023OngoingJul 2028Not due yet

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Central Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near D Ward, Mumbai780+ in Mumbai City

Builder: H. M. Holdings

H. M. Holdings has 2 registrations on MahaRERA, including Central Park and Central Park. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 1 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Central Park is delayed beyond 1 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Central Park?

The registered promoter entity is H. M. Holdings, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Central Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Central Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Central Park?

The professionals named in the filing: Architect: DSP Design Associates Pvt Ltd; Engineer: JW Consultants LLP; Chartered Accountant: CA Paresh Prakash Sabadra. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Central Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Central Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Central Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.